Clinics!
This morning began like most days at a convention start - in line at the hotel coffee shop. A frappachino(tm) and a bagel later, I had breakfasted.
I only went to a couple clinics today, the first of which, by Bob Weinheimer MMR, was also my first EduTrain clinic. NMRA members who have logins on the NMRA website can download any and all of the EduTrain clinics, complete with slides and notes. This one was created by Bob and is titled "Getting Started In Operations." I could quibble slightly about the title, it might be "Options in Starting In Operations," as the material starts out as "Why Operations" (looking how railroads were designed before the mega-mergers), and how you might design your layout for operations, including staging, and goes into the various options involved in getting operations running on a layout - Mother, May I; Time Table & Train Order, Track Warrant/DTC, CTC, Car Cards & Waybills, and Switchlists, basically. Combined in this were a few examples of all of the above on selected model railroads, but due to the hour length of the clinic it was necessarily a rather high altitude overview of the topic. A good start for someone who had never had anything to do with operations.
My second clinic, and as it turned out my last, of the day was Introducing Switchlists by Phillip Sharp, one of a decent sized international contingent (Paul is from New Zealand) here. I sort of shot myself in the foot with this one - I didn't read the explanation in the Timetable about the class, I just assumed it was going to be on methods of implementing switchlist based operations. Bad assumption - the class was exactly as it was described, had I bothered to read it: "I will talk about the easy, the hard, and the lessons learnt during the six months from March to September." In short, Phillip, a rather new model railroader and club member at the time, converted the club from car cards & waybill operations to switchlists over a fairly short period (this for a club that frequently takes a _long_ time to implement changes). In it he explained what the club was and some of it's history and structure, and then explained how depending on the op session, they might be using Scheduled Operations (it sounded like TT&TO) or Car Cards & Waybills. And as everyone seems to have experienced, after a few cases of dropped on the floor or inadvertently pocketed packs of waybills, Paul Hobbs had attempted to implement switchlists, with, charitably, less than total success. Paul went on to other things and Phillip took up the mantle of implementing switchlists. Both of them used JMRI Operations Pro to do it. During this time the operations team (several people, not including Phillip) who made various decisions regarding operations at the club, set some limits on what could actually be used during switchlist sessions - for instance, no more than 100 cars on the layout (out of 400 that the club owned), and a maximum number of trains and such. The end result being that after about 3 sessions of it, improving each time, they threw out (metaphorically at least) the car cards. It was interesting, and gave me a view into club operations (and inevitably club politics a bit) that I had never had. But it didn't really get me any closer to figuring out what I'm going to do on my own layout (It will use track warrants, all else is up for grabs).