jeffshultz
The day isn't over yet, but I thought I'd get an earlyish start on this. 

I'm sharing a room with my father-in-law, and somehow we are fortunate enough to have his favorite restaurant (a chain called Elmers) just outside the closest exit door to our room. So that was dinner last night and breakfast this morning. The in-hotel restaurant, Sweet River, is actually pretty good (at least based on the triple cheese grilled cheese with creamy tomato soup I had for lunch yesterday), but, like most hotel restaurants, it's pretty expensive too. 

After breakfast this morning it was time to head over to the clinics. My first one was with MRH favorite, Geoff Bunza, who has two clinics at this convention, Hands-on DCC (which I attended) and Modeling with Magnets, which he has presented to the 2nd Division previously.  Hands-on DCC included a handout listing most (all?) of the SMAxx projects he has here on the MRH forums, a well as a few other things he's working on - the potentially most interesting of which is something he calls SOCS - what that breaks out to I'm not sure, but it boils down to a fairly compact package that includes a DCC command station, WIFI transceiver, and decoder  - all in the space that used to be taken up by a decoder.  He could connect a wifi throttle directly to the locomotive, dial up the address of the decoder attached to it, and off it went.. without any power to the rails. There was a boxcar containing enough AA (or AAA) batteries to provide 12V of power coupled to the locomotive, with the electrical connection running through two wires connected between the tender and car with magnets. Very interesting stuff - not only was it mostly practical deadrail in an HO scale package, but with Wifi you have bi-directional communications - the decoder/CS package could tell you things. 
IMG_5066sized.jpg  IMG_5067sized.jpg  IMG_5068sized.jpg 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 4
jeffshultz
The other clinic, aside from Modeling with the Masters, that was running first thing this morning was Jeff Johnston's clinic on Layout Construction. It looked like it was well attended:
IMG_5062sized.jpg 

Time to head to the mini-clinics, more later!

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 3
jeffshultz
My second clinic of the day was by Kevin Rudko, the founder of Signalogic, which is probably unique in that it works on both model and prototype signal systems. 
IMG_5071sized.jpg 

The clinic was on grade crossings, which might seem a bit unexciting of a topic until you realize that these days, the grade crossing is the most common meeting place of people and trains.   And grade crossings are complex constructions, since multiple things have to happen, in order, in order to avoid train/auto collisions through proper timing of the warning lights and gates, and the timing has to be adjustable to the speed of the train in order not to keep drivers waiting too long - or not giving them enough warning. So they not only do detection of something within range, but they can tell both the speed and direction of motion and use those to either time the lights and gates, or to perhaps realize that the train may have entered the detection zone, but now it's moving the other direction, and so it won't trigger the lights and gates.  Or that it is stopped short of the crossing, where it can turn the signal off and retract the gates. 

Modern signals have several sets of lights pointed both away from the track as well as over the track at an angle, since once someone pulls up to the grade crossing they may not be in the line of the flashing lights that they first saw from a distance - those may be over their head, and nearly behind them, and are focused into the distance down the road. The light on the backside of the signal on the opposite side of the tracks will be angled over to catch someone who is stopped at the line and also has a looser focus, allowing it to be seen at a wider range of angles. 

For the modeler, an interesting point is that if the lights cannot be placed within 25 ft (7 2/3rd meters) of the centerline of the road, they have to install a cantilever or other structure supporting lights over the road.  Also, next time you are stopped at a grade crossing, notice that all the lights are synchronized - all the left lights are on simultaneously, and all the right lights are on simultaneously. Even on the crossing gates - each gate has three lights - the tip light does not flash, but the two inside lights flash synchronously with the lights on the signals. According to Kevin there isn't actually a law requiring this, it's just an accepted (and effectively required) practice. 

Fascinating stuff, tempered by the realization that there are few, if any, reliable sources of scale crossing gates and/or signals these days. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 3
jeffshultz
After a break for lunch, during which I took photos of the items in the contest room, the third clinic of the day for me was a railfan clinic - David Lange is a third generation railfan and photographer, and he built a multimedia production featuring his Grandfather's photography of the New Haven in the steam to diesel transition era, his father's photography of the Southern Pacific and Santa Fe in Southern California, and his own photography of the modern era, including the dismantling of the Eugene Hump Yard, which took his photography into a more artistic bent as the Southern Pacific and Santa Fe railroads were subsumed into UP and BNSF.  

David wasn't here today (He's supposed to be here Friday) so it was just watching the excellent video production. 

The next clinic was the first of two that I used to prepare for Friday afternoon.  Dave Clune is an accomplished narrow-gauge modeler with an On3 layout in his basement that he calls the Cascade County Narrow Gauge, which is based on a Nevada prototype. 
IMG_5274sized.jpg 
I hope to have lots of photos of the layout itself tomorrow. 

Jeff Johnston's clinic was not as much on his layout as it was on the research, and sources, he has used to develop his layout, based on the Sugar Pine Lumber Co. railroad out of Fresno, CA. It seems that many of his sources have come to him because they see him wearing a shirt with the Sugar Pine Lumber Co. logo on it, and they engage him in conversation, and want to know if he would be interested in some photos their father/grandfather/other relatives took when they worked for it. (answer: yes, always) There were also a lot of other, more traditional sources, including all the documents that the civil engineer of the railroad left to the University of Oregon library - a treasure trove that ended up being located only 5 miles from his house. 
IMG_5276sized.jpg 
Again, another layout I intend to visit tomorrow. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 4
jeffshultz
Thursday evening featured a session that has become a regular occurrence at the PNR Regional Convention, a mini-clinic session.  Basically, take a ballroom, line the walls with tables, put about 9 clinicians or so behind the tables, and four chairs in front, and you have the mini-clinics. 
 
This is the setup - and I'll admit, I looked at the size of the room, and the number of people outside waiting to get in (several decided to wait an hour until 8pm) and was very worried that it was going to be very noisy. I needn't have worried - the room seemed to do an effective job of soaking up most of the roar... 
IMG_5281sized.jpg 
Here we see Jack Hamilton, MMR, in his natural environment - that of training. He had a selection of Pan Pastels, sponges and q-tips (and nitrile gloves), and his goal was not to teach you how to weather with Pan Pastels, but to simply get you to use them, and perhaps get over the hump of hesitation.  Jack is definitely the sort who prefers to teach by getting the student's hands dirty - even if they are wearing gloves. 
IMG_5282sized.jpg     IMG_5286sized.jpg
Jim Moomaw is spearheading the Willamette Model Railroad Club (aka "The Clacko Club") in its effort to implement CTC on a layout that currently has neither signals, detection, or even most of the turnouts powered.  Here is a well constructed device he has created to train operators on electric switch locks and dual-control (dispatcher/crew) powered turnout controls.  He explained it well enough to me at the ice cream social last night that I got about 70-80% of it. Which means he explained it very well indeed. 
IMG_5285sized.jpg    IMG_5295sized.jpg
Here Ed Liesse is running a mini-clinic on what appeared to be the care and feeding of #5 Kadee couplers. 
IMG_5287sized.jpg   
Ed Schaenzer, MMR, taught a mini-clinic on the use of pastel chalks on pourous materials. He had an attentive group at his table every time I looked over there - 
IMG_5288sized.jpg   
Jim Rassmussen led his very popular mini-clinic on constructing trees using Coastman's Tree Kits (his company). I have a small tree that I made, and a kit for two large ones now. 
IMG_5289sized.jpg   IMG_5293sized.jpg
Buzz Allen's clinic on weathering structures was popular - 
IMG_5290sized.jpg   y li
And Al Turnbull appeared to be enjoying teaching his technique of soldering feeders to rail to any who wanted to drop by. I was one of the ones who did, and I will very likely be applying at least part of his techniques on my layout. 
IMG_5291sized.jpg  
Possibly one of the most popular mini-clinics of the evening, Ray Davis demonstrated and explained using the Cricut machine to cut cardstock and other similarly thin materials. 
IMG_5292sized.jpg      
It's bedtime - see you tomorrow! (yes, I'll get the contest entries up then)

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 6
RossA
Jeff,

Thanks for the update for those of us who had life get in the way and couldn’t attend !

Ross A
Reply 3
Reply