jeffshultz

Some of you know that my layout has had a persistent problem - I have an angled gap over the entrance to the aisle on my layout. Due to factors unforseen the angles (each different) at each end of the bridge I needed to span this gap were more than a little weird as well.

I've had three different attempts at bridging the gap with something I could swing out of the way or remove entirely, and all three of them changed sizes on me between winter and summer, tossing my track ends off.

Frustrating.

Well, here is bridge attempt #4:

[attach:fileid=7751_31_uVFXgQy44oDVv+J//9k=]

Just call it an Aluminum Through Girder design. In a previous life this was two parts of a computer & networking rack - they'd stand vertically and you'd mount the rack-mount cases or shelves or whatever to those little holes there. To get adequate width I put two matching beams side by side and screwed 15 5/32" nuts and bolts through the holes in the middle (unseen) girder. I laid my previous bridge on top and used it as a cutting pattern.

Even with a metal cutting blade in it, my compound miter saw was not terribly happy at cutting through this stuff. No sparks, but my front deck looks like it's covered in diamond dust.

Now.... to figure out how to mount this thing so that it can be removed for easy access and yet remounted in exactly the same location for alignment....

And yeah, the layout looks like an Irwin Allen movie (before the fires start), due to my tearing out some shelving in order to create a new workbench area. Now to determine where it's all going to go back to....

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Rio Grande Dan

That's A bridge FOR SURE!!!

Great Bridge no more shrinkage problems now. 

That is as long as the tables don't shrink 

Dan

Rio Grande Dan

Reply 0
pipopak

If you want to just remove it......

.......... put one support block where each end of the bridge rests on the layout and 4 pins on the bridge to go into holes in the blocks. Using stereo jacks (male on the bridge, female on the support blocks) will allow for electrical connections.

_______________________

Long life to Linux The Great!

Reply 0
kcsphil1

Pip beat me to it

The easiest way to deal with this is to avoid the temptation to hinge it.  While there are a few high dollar cabinet hinges that would accommodate one end and swing out far enough to clear the existing benchwork, you'd have allignment problems for a long time.

Given the stability of the bridge substrate (!) I think two solid end blocks and some through pins on the ends should be enough.  I'd recommend the pins they use to secure trailer parts - long, straight, and aluminum to boot.

Philip H. Chief Everything Officer Baton Rouge Southern Railroad, Mount Rainier Div.

"You can't just "Field of Dreams" it... not matter how James Earl Jones your voice is..." ~ my wife

My Blog Index

Reply 0
bear creek

bridge or not

Jeff,

Are you sure it was your bridge changing dimensions or was it your train room (and the surrounding benchwork)  changing dimensions seasonally?

Charlie

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
rickwade

A catchy title - but can you dance to it?

Charlie brings out a good point - usually expansion/ contraction occurs in the largest mass, which in this case would be your benchwork on either side of the bridge.  As others have stated a method to mate the bridge to the benchwork in a secure way is the best method and may even result in you pushing / pulling your benchwork slightly to engage the bridge.  I do like the metal bridge and it probably will have a cool sound when the train crosses it.

Now, can you hum a few bars of the "Bridge over troubled......."

Rick

Rick

img_4768.jpg 

The Richlawn Railroad Website - Featuring the L&N in HO  / MRH Blog  / MRM #123

Mt. 22: 37- 40

Reply 0
jeffshultz

Everybody Twist Now!

Quote:

Are you sure it was your bridge changing dimensions or was it your train room (and the surrounding benchwork)  changing dimensions seasonally?

Charlie

 

Charlie,

Nope - but this way I'm pretty sure I'm removing one of the variables. If the whole room is is changing dimensions (haven't met Evil Kirk or Spock yet) I'm pretty much toast and might as well pack it up.

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
tetters

Somehow...

I think twisting is the last thing you'd want it to do... 

 Shane T.

 

Reply 0
pipopak

If the whole room is

If the whole room is changing dimensions ........... then I want it bigger!.

_______________________

Long life to Linux The Great!

Reply 0
bear creek

shifty rooms

First question to ask:

is the concrete in your floor stable through out the year?

If the answer is yes, then any changes are probably walls bowing/unbowing or perhaps some wood swelling or shrinking.

If the answer is no then the whole basis of the room is a little unstable.

 

Next question:

How much does the bridge not fit by?  Are we talking 1/32", 1/16", 3/32", 1/8", more?

If the amount is relatively small you might be able to reduce it further by putting a U-shaped panel cut from a single sheet of 3/4" plywood above the bridge. This would help to hold the abutments an equal distance from each other, though it won't be able to compensate for truly catastrophic problems.

 

You'll want some say of locking the ends of the bridge in place. And don't forget an expansion joint in the middle of the track crossing the bridge.

If you use some extra guard rails where the bridge hits the abutments, even if there's a 1/16" gap your trains should make their way across it without mishap.

 

If you're faced with a horrible situation, such as gate width varies by more than 1/8" seasonally, a bit of construction ingenuity, especially with you using metal bridge construction, should let you work your way around it. Somehow, you'll need to make the ends of the bridge spring loaded as well as the tracks being anchored at the ends to have an expansion capability in the center. With a potential 1/8" gap in the rails, guard rails and staggered gaps (not directly opposite each other) may prove sufficient to create a universal-fit-bridge for your situation.

 

Charlie

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
dfandrews

The Bridge to somewhere

Jeff,

I think you've got it.  As virtually every responder has said, blocks with alignment pins at each end should do it.

I've had my aluminum extrusion bridge in place for 3/4 year, and I don't find expansion/contraction to be a problem, ever.  The room has a temperature swing from 65° to 85°.   Sometimes when I lower it and engage the pins I have a bit of a wiggle to do, then it settles right in.  Your benchwork will move much more that the bridge will expand/contract.

My suggestion:  support blocks with alignment pins, and guardrails a la George Booth's last photo in my bridge thread of last year.

http://model-railroad-hobbyist.com/node/5551#comment-45014

Those pins on my bridge are 8 penny (0.135" dia.) common nails with the head cut off,                                         and the holes are done with a #29 drill (0.136" dia.).

 

Don - CEO, MOW super.

Rincon Pacific Railroad, 1960.  - Admin.offices in Ventura County

HO scale std. gauge - interchanges with SP; serves the regional agriculture and oil industries

DCC-NCE, Rasp PI 3 connected to CMRI, JMRI -  ABS searchlight signals

Reply 0
kjd

Charlie has a good point

Charlie has a good point about the floor/room being stable.  I work at a stop motion movie studio and in the making of stop motion movies it is very important things only move when you want them too.  One set was having trouble with camera shift, the first shot in the morning didn't line up with the last shot the previous night.  It can be caused by a variety things but in this case it was because the set was on one slab of the concrete floor and the camera was on an adjacent slab and they weren't moving together.

Paul

 

Reply 0
jeffshultz

Unstable floor etc...

It's very likely the floor isn't stable - as far as I know, without a car ever having been parked on the garage floor, the floor was already cracked before we bought the place in 2005. It was about 5 years old at that point.

What adds to the fun is that one side of the bridge goes to the part of the layout that is hanging off the wall on shelf brackets, and the other end goes to the free-standing table portion.

I've pretty much determined that I'm going to use angle brackets to support the bridge and I will drill through the bridge from the angle brackets (which come with holes in them) to drop some sort bolt through for a firm connection. All while trying to avoid the tracks...

Removability will take a distant second place to stability on this one.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Toniwryan

Drawer slides?

Just wondering about the possibility of using drawer slides (ala Joe's liftout section) to make a lift bridge that would get high enough to walk under.

 

Toni

Reply 0
bear creek

Can you make the side of the

Can you make the side of the bridge attached to the wall on shelf brackets independent of the wall? If both sides of the bridge can "breathe" there's more chance you'll be able to manhandle them into a position where the bridge will open, close, and lock in place...

Or maybe this is another idea brought to you from the Horace Fithers school of (not entirely) civil engineering.

Charlie

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
rickwade

Horace engineering

"Sounds like that thar Horace be some kinda engineer" said ole' Buck who also said "I ain't seen nothing no how that can't be fixed with good ole' duct tape and bailing wire - over half my trailer house being fixed up good with it". Rick

Rick

img_4768.jpg 

The Richlawn Railroad Website - Featuring the L&N in HO  / MRH Blog  / MRM #123

Mt. 22: 37- 40

Reply 0
Reply