James Leighty Jim Leighty

Here is another picture of the West end of Crawford Yard.  When I rebuilt my layout, one of the corrections that I wanted to make was to have an adequately long yard lead so that yard operations did not interfere with the mainline. The track on the left is the yard lead which rejoins the center freight main about 30 car lengths West of the yard.  The track on the right of the center freight main is the passenger main which allows passenger trains to do their work without fouling the freight main.  There is also a fourth coach track in front of the depot for passenger and express car storage. On my previous layout, I only had one mainline and the yard lead was only 6 cars long.  Lesson learned!!

Enjoy,  Jim

DSC_0035.JPG 

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 0
Jerry A. Armstrong Sr jerry sr

CNY&NE Pictures

Having seen layout in person, the pictures do not give the layout justice.

Jerry Armstrong

Reply 0
Reply