railandsail

I have an image in my mind that I think was saved from an old image I recall seeing long ago. It is (was) of a cobblestone street running along the waterfront of old town Baltimore. The tracks were embedded in the cobblstone, and they serviced several warehouses that jutted out into the water along the waterfront. One or so of those 'warehouses' resembled the Walthers Municipal Pier kit.

Those infamous B&O docksiders locos could be found working these wharf side tracks.

I searched the internet for about an hour the other day trying to find that image thats in my mind,...could not find it? Would anyone on the forum know of such an old time image?

Just perhaps it was another city. or just some other modelers creation, but it made an impression on me I can't seem to forget. I wonder if I saw in on the walls of that Baltimore model layout that existed for years in downtown Balt (the one that had to recently move) ??

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
dark2star

Carfloat and loco escape track

Hi,

the "little bit of history" story is nice!

As far as I understand carfloat operation, the loco should never go on the bridge or the carfloat during normal operation. There would be one or two "idler cars" (empty rail cars) attached to the loco. The spacer cars would reach on to the barge and pull the cars from the barge, taking care of the barge being loaded somewhat equally. The loco stays on "dry land". The arriving cars are pulled and then pushed to an "Arrival track".

Once unloading is complete, the loco with the idler cars would grab the rear end of the departure cars and push them on to the barge, again taking care of the sequence for weight distribution. Again, the loco would stay on "dry land" - so there is no need to have an escape track.

Which basically means you've got to have three tracks for car float operation:

  1. the track to the car float bridge
  2. the arrival track
  3. the departure track

Now, according to your ports' history, you can get away with two tracks, the arrival and departure track being one and the same at different times. You do have two tracks.

You can even get away with all three functions being one and the same tracks if you allow for less efficient operation

The tracks need to be connected at the end away from the bridge, and this is the end where the loco will always be. But that also means that cars to the carfloat will always be pushed into the two tracks, hence no need for an "escape." Your train will have to be pushed in and pulled out of the facility.

Does that make sense?

Now, I do expect to be told that there is another way and there are examples of it being handled differently

Have fun!

PS: one exception to what I wrote above used to be the "Vogelfluglinie" ("birds' flight line") between Denmark and Germany: they used to run diesel-multiple-unit trains right into the ship. Done, proven myself wrong

Reply 0
Benny

...

Quote:

As far as I understand carfloat operation, the loco should never go on the bridge or the carfloat during normal operation. 

And did you learn this from actual practice or from model railroaders?

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
DaleMierzwik

loco on float

carfloat.jpg 

Dale


Reply 0
DaleMierzwik

(No subject)

_xlarge1.jpg 

Dale


Reply 0
ctxmf74

  "As far as I understand

Quote:

"As far as I understand carfloat operation, the loco should never go on the bridge or the carfloat during normal operation."

I guess it would depend on the location and the capacity of their car floats versus the weight of their engines. In New York the engines would routinely run onto the bridge to depress it enough to hook up the carfloat to the bridge then pull the first cars off half the float and use them as a handle to pull the rest of the cars. Loading was a reverse of the pattern with the outbound cars used as a handle to load the three tracks in the correct sequence. So the engines wouldn't generally be on the floats but could venture on them if necessary....DaveB 

Reply 0
CAR_FLOATER

As I'm modelling a harbor railroad....

I feel I should weight in here with some thoughts.

As the two photos above mine show, yes, locomotives, DEPENDING ON LOCATION AND EQUIPMENT, would regularly operate over float bridges and onto carfloats. Was it standard or even good practice? Yes and no. It was and is to be generally avoided due to buffing forces and airbrake (trainline) reasons, but it is common both yesterday AND today.

As for float yard "ergonomics"....

Typically (and again, it's all about the room available to the prototype and the type of operation), the classification of cars was NOT done port side. At NY Harbor, the railroads pre-blocked the cars for carfloating to and from NY and NJ. It was efficient, and they just didn't have the room! They would haul in and haul them out in bunches, and it was coordinated between the arrival and departures of the carfloat and the symbol freights (on both sides of the river). What they DID have to worry about was balancing the cars on and off the float. Unless your cars are super heavy and the carfloat is on a spring suspension, all of that is "imagineered play value" added into the operation, because we as modelers don't have to worry about physics. But I digress.....As long as you have a clear track that can hold the capacity of the carfloat, and a track to run around them when you pull/push them off/on the float, you're good, that's all you really need. That being said, LOOK TO THE PROTOTYPE....Lots of ideas and inspiration there.

And as for "where" the carfloats in Baltimore came and went to. You had four operations (to the best of my knowledge without my books handy) in the harbor area - B&O, PRR, WM and Canton RR. They all interchanged between each other. Carfloats COULD also be used to transfer cargo directly at shipside, but this was not their common use. Here's a great map -  https://trn.trains.com/~/media/files/pdf/map-of-the-month/trnm0314.pdf

And again, a container operation would < probably> have supplanted a  carfloat operation (at least here in NY Harbor, it did), so they wouldn't < probably> be common to have both side by side (a carfloat and a pier? ABSOLUTELY!), because, as it has already been stated, the room that each would reasonably need, even in a compressed model scene, would require more room (than most of us have) to be close to realistic. YMMV, of course.

I hope this helps. Of course, the old saying, "it's your railroad, you do what you want", but if you WANT it to be like the real thing, then this is how the "real thing" does things.

Reply 0
caniac

CarFloater said: "Was it

CarFloater said: "Was it standard or even good practice? Yes and no." Apparently it was good enough, standard practice for CP in the Kootenais, MILW on the Olympic Branch (How else would bad-order and repaired locomotives make it from Pier 27 in Seattle to Port Townsend?), and terminal railroads on the eastern seaboard.

Reply 0
David Husman dave1905

Switcher

Quote:

One of my dilemmas is, how does the switcher engine that pulls cars from the line-up at the dbl-slip down to the carfloat, then escape??

Most obvious answer is, it doesn't.  Why would you put the switcher spur on the "wrong" end of the cut?  Put the switcher spur on the other end of the cut and then you eliminate 100% of the runarounds since that makes EVERY switch a facing point switch.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
dark2star

Loco on carfloat

Hi,

as expected I was proven wrong. Still, as I wrote "in normal operation the loco does not go on the bridge or barge" - well, pushing the bridge down is not "normal operation", neither is shipping a loco. There are exceptions - as always.

In effect I tried to highlight that the barge is usually switched from the land side with the barge staying off of the barge, mostly even off the bridge.

Thanks Dave Husman - this is exactly what I was trying to put into words

Being railroads, often things are done (or were done) to get things done. Being model railroads, almost everything is possible...

Have fun!

PS: Where I got this from? There is this very extensive "BEDT" website - it gives a very good overview on car float operations in NY harbor.

Reply 0
railandsail

Delimma

Quote:
Quote:

Most obvious answer is, it doesn't.  Why would you put the switcher spur on the "wrong" end of the cut?  Put the switcher spur on the other end of the cut and then you eliminate 100% of the runarounds since that makes EVERY switch a facing point switch.
Dave Husman

 When I was first trying to layout the track plan I wasn't thinking of this problem of a carfloat or dead-end tracks out there on the peninsula,...so the slip switch up there seemed like a neat solution to the two mainline spurs coming into and dividing out into at least two directions/destinations on the peninsula.

After awhile as I began to consider how cars might be separated out from their mainline configuration and taken to their individual locations, my thoughts turned to how they might be 'pushed' to those locations, and that likely would require a switcher engine on the upside of that dbl-slip turnout. BUT I just couldn't find a good way to do that as I had two big radius tracks coming in and none of the commercial dbl-curve turnouts would work up there.

It was at this stage that I accepted the idea that a yard switcher engine located below the slip-switch could do one of two things;
1) pull a group of cars into their destined spots, (and have a runaround),
2) or wait until a certain group of incoming cars were pushed by the whole train past the slip-switch, uncouple and pull back out, then have that yard switcher come out and push them to their destinations.

I hope my explanation that makes sense?
 

(PS: I imagine a number of prototypical railroads ran into the same problem and had to improvise?)

 

 

 

Reply 0
railandsail

Steam Engines on Carfloats

Carfloats came about during the steam engine era, but not much has been mentioned about their use on carfloats. I rather doubt that any steam engine of significant size would be found on a carfloat,...just too heavy and too big in general.

Maybe those docksiders and small non-tendered switchers might have found themselves aboard.

 

 

Reply 0
David Husman dave1905

Runaround

Quote:

I hope my explanation that makes sense?

It makes sense why it is like that, but not why you keep it like that when it obviously is creating problems.  The easy solution is to put the switch engine on the right end of the cut.  By creating the problem of starting the switcher on the "wrong" of the cut you solve it by creating the problem of having to add a crossover which creates the problem of needing an escape track which creates a problem of a short run around which will create other problems.

Quote:

(PS: I imagine a number of prototypical railroads ran into the same problem and had to improvise?)

Not really.  They wouldn't drive an inbound train that had to be switched straight onto a dock  They would bring the train into a yard that has way more room and then run around it there.  Or they would "improvise" by putting the switch engine on the "right" end of the cut to begin with. 

 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Volker

Quote Brian: Carfloats came

Quote:

Quote Brian: Carfloats came about during the steam engine era, but not much has been mentioned about their use on carfloats. I rather doubt that any steam engine of significant size would be found on a carfloat,...just too heavy and too big in general.

Maybe those docksiders and small non-tendered switchers might have found themselves aboard.

There are examples of smallsteamers on barges: http://members.trainweb.com/bedt/bedt/1552.jpg
/> Caption: 1954 - East River, #15 aboard Carfloat #22 and enroute to Brooklyn Navy Yard (note loaded coal hoppers for BNY powerplant).

There are examples for larger steamlocomotives too: http://members.trainweb.com/bedt/transferbridges/fbgreenvillesmall1945.jpg
/> Caption: Railroad Magazine, September 1945, "Boxcar Navy" by William L. Rohde
appears to be a 'H class' "Consolidation" 2-8-0 which weighed between 220,000 and 247,500 lbs

And than there is the Southern Pacific trains crossing the Mississippi River on rail barge Mastadon at Algiers to New Orleans: https://images.wisconsinhistory.org/700006010001/0601000016-l.jpg
/> https://texashistory.unt.edu/ark:/67531/metapth28916/m1/1/med_res/

The second photo is from 1912 and additionally shows the Morgan tugs El Vivo and Juno (at bow)

It is only the question if a car float and apron were designed for locomotive loads.
Regards, Volker

Reply 0
ctxmf74

  "I rather doubt that any

Quote:

"I rather doubt that any steam engine of significant size would be found on a carfloat,"

Again it's a matter of research and figuring out why a large steam engine  might be on a car float. Generally the  car floats went to places that mainlines didn't go so no reason to take a mainline engine over there to switch a small pocket yard. Railroad ferries are a different class  and might carry more cars and perhaps larger engines if there was a reason to need them on the other side of the water.......DaveB

Reply 0
Benny

...

People forget how heavy loaded freight cars can be...

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
railandsail

Help, what is the 'cut'?

Quote:

It makes sense why it is like that, but not why you keep it like that when it obviously is creating problems.  The easy solution is to put the switch engine on the right end of the cut.  By creating the problem of starting the switcher on the "wrong" of the cut you solve it by creating the problem of having to add a crossover

 Help Dave, what is the 'cut' ?

Reply 0
bdhicks

Alaska Railroad

The only carfloat operation I've looked into in any detail is the Alaska Railroad's, which is a combination container/car float, and uses an idler to keep the switcher off the carfloat.  My understanding is that the requirement to keep switchers off of carfloats (which as others have mentioned, varies from case to case) is about the lateral force from starting or stopping a locomotive, rather than the weight of the locomotive.  Going back to the ARR example, they have loaded multiple SD70s onto a single carfloat, along with other cars and containers, but those SD70s were shoved there by the carfloat switcher, using an idler.

-Brian
Reply 0
barr_ceo

"Cut".... the group of cars

"Cut".... the group of cars you're manipulating

Read my Journal / Blog...

!BARR_LO.GIF Freelanced N scale Class I   Digitrax & JMRI

 NRail  T-Trak Standards  T-Trak Wiki    My T-Trak Wiki Pages

Reply 0
railandsail

Tip of Peninsula

Yesterday I was working on the tip of the peninsula. I have some water that needs to support the carfloat, and some water under the pier structure that is supported by many pilings. Had to do quiet a bit of thinking how exactly I would like to do this, and the dimensions involved.

Originally my metal benchwork had a support beam running all the way to the tip under the 3/4 plywood.

DSCF5435.JPG 
(yellow box above denoted the end of the carfloat sitting on that upper deck, and the other arrows point out the 2" square metal tubes)

I've got to cut off that excess length tube sticking out the front as my water depth there is greater than the top surface of that tube that is only 3/4" under the plywood deck it is supporting. In fact my water's top surface is 1+1/4" below the surface of the top.
DSCF5458.JPG 

 

Here you can see my float apron and the pier surface set in place while contemplating the situation,...
DSCF5457.JPG 

 

Here you can see where I took my cutout piece and temporarily attached it to the underside of that metal beam.
DSCF5459.JPG 

I will be using this cutout piece as the 'water level deck', but it will only be about 1+1/4" deep verses 2 +3/4" of that beam plus top plywood thickness.

Reply 0
David Husman dave1905

Cut

A group of cars, generally a group of cars to be switched.

If you have 10 cars with an engine on them, that's a train.  Take the engines off and when its going to be switched its a "cut".

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
railandsail

Get Switcher onto Correct End of the Cut

As I wrote previously,...

Quote:

 When I was first trying to layout the track plan I wasn't thinking of this problem of a carfloat or dead-end tracks out there on the peninsula,...so the slip switch up there seemed like a neat solution to the two mainline spurs coming into and dividing out into at least two directions/destinations on the peninsula.

After awhile as I began to consider how cars might be separated out from their mainline configuration and taken to their individual locations, my thoughts turned to how they might be 'pushed' to those locations, and that likely would require a switcher engine on the upside of that dbl-slip turnout (spur line holding track). BUT I just couldn't find a good way to do that as I had two big radius tracks coming in, and none of the commercial dbl-curve turnouts would work up there,.... (while maintaining a decent radius for those container cars, etc that might be entering the peninsula area tracks).

It was at this stage that I accepted the idea that a yard switcher engine located below the slip-switch could do one of two things;
1) pull a group of cars into their destined spots, (and have a runaround),
2) or wait until a certain group of incoming cars (cut) were pushed by the whole train past the slip-switch, uncoupled and pulled back out, .....then have that yard switcher come out and push them (the cut) to their destinations.

 

Reply 0
David Husman dave1905

Then you're stuck....

...with a crossover on the pier.

Only other option is prototypical, bring the train to a yard switch it out and then have the dock switcher bring just the dock cars to the dock and spot them.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
railandsail

Prepping the tip area,..

Back here I was describing my need to remove a portion of my steel tube framing,...
https://forum.mrhmag.com/post/baltimore-wharf-area-municipal-piers-docksider-locos-12214366

I wasn't looking forward to cutting that steel tube with a hack saw, particularly when it was rather difficult to get too. Why not just remove that portion of the plywood deck to get at the steel beam, particularly when I would soon need to do that to place the staging tracks in below it.

So I took that portion of the plywood deck off, then unbolted that portion of the beam, took it outside and cut it off with my metal chop saw.
DSCF5461.JPG 

 

DSCF5462.JPG 

 

Then I set everything back in place and set up a mock-up of my water support plate.
DSCF5464.JPG 

Reply 0
railandsail

Finish Up Tip Plate

I'm referring to it now as my 'tip plate'. It is the the water area at the end of my peninsula. I sought to make it a self contained tray that could be screwed attached to the tip area of my peninsula deck, and thus undone when I sought to finish off its surface area with a 'water' scenic.

Here is the plate/tray itself with glued on edging and cleat plates for attaching it up under the maindeck plywood.
DSCF5465.JPG 

DSCF5466.JPG 

 

Then here it is installed,...
DSCF5469.JPG 

DSCF5472.JPG 

Notice that the crane's pier surface concrete sets on a narrow plywood strip centered under it. That is to give it greater strength/rigidity rather than depending on just the pilings of the original kit. That plywood strip is recessed under the center where it will not interfere with the image of the pier being solely supported via pilings. 

That thin piece of white plastic is there just indicate the thickness of 'water' that will eventually be applied,...a little over 1/8" thick.

I had consider just gluing this tray onto the bottom of the deck, but thought for now I would just screw it on in case there were any other changes I might make in the water application.

The plan to construct this as a rigid tray was also to provide a rigidity to the cantilevered peninsula tip as a whole
 

Reply 0
railandsail

Municipal PierTerminal Building & Pushing Switchers

As I have mentioned on several occasions I am in love with this Walthers pier terminal building structure, and just must have it on my peninsula. So I have been playing around with its final fitting and any track plans associated with it. BTW my building is also a little longer than the stock one after I found another 'front face' to put on it,...like the Magoun pier one . I'll document this later today.

I'm going to have to take some better photos than the ones I took today, so update tomorrow.

@Dave1905: I found two places to station switcher locos 'before' the double slip switch, ......so they can now push cuts of cars into the peninsula area.

 

 

 

 

Reply 0
Reply