skiwiggy
This Journal/Blog will showcase the construction and scratchbuilding of  structures along the Rutland Bellows Falls Subdivision.  Various Scenes starting in Bellows Falls Vermont, heading West towards Rutland will be constructed on a lower and upper deck.  
 
To fit most of these scenes they will be built on a 12" to 16" shelf around the walls utilizing an adjoining room and two penninsula sections along with a helix. 
 
One of the challenges will be constructing the shelf sections over already existing lower layout.  I have some ideas on how this will be accomplished.  
 
Welcome aboard.  I hope you enjoy the journey as the next phase of the Rutland takes shape.
 
 
Some of the scenes to be built include:
 
Bartonsville        MP 43.0
 
Chester                    MP 38.9
 
Gassetts                  MP 34.5
 
Cavendish               MP 30.1
 
Proctorsville         MP28.6
 
Ludlow                       MP 25.2
 
Healdville                MP 19.8
 
Summit                      MP 18.3
 
East Wallingford     MP 13.0
 
Cuttingsville               MP 9.8
 
Greg W.  
Reply 20
blindog10
Looking forward to it!
 
Scott Chatfield 
Reply 4
skiwiggy
Rough Idea of what the entire layout could look like.  Nothing is set in stone, and many improvements and design changes are definitely possible.  One of the changes involves a different location of the helix.  
 
 
 
IMG_20240302_204144631.jpgIMG_20240302_204136975.jpg
 
 
 
 
Next area of Construction is a scene of Bellows Falls.   It will be quite the challenge trying to fit in key elements of the scene.   
 
 
 
IMG_20240302_203141397.jpg
 
IMG_20240302_164138461.jpg
 
 
 
 
 
IMG_20240302_202144550.jpg
 
It is a small start of a two foot section of benchwork transitioning between rooms.
 
Greg
Reply 20
CP Rail Vermont
Hey Gregg,
I'm grabbing my popcorn and ready to follow along!!  Can't wait to see this fantastic layout continue to expand.
 
-Neil Schofield
Reply 6
skiwiggy
Looking forward to it!
 
Scott Chatfield 
Thanks Scott,
 
It's going to be a long journey.  If I start to think about all those town/station stops I cringe at how much styrene is going to be needed.  
 
A little at a time and the train will eventually arrive at it's final destination.
 
Greg
Reply 5
skiwiggy
Hey Gregg,
I'm grabbing my popcorn and ready to follow along!!  Can't wait to see this fantastic layout continue to expand.
 
-Neil Schofield
Hi Neil, 
 
The Boy Scout popcorn sale starts in the fall.  You might need to get a whole lot.  I'm not sure how long this movies run time is.  
 
I am sure that any scenery you work on will most definitely make me want to speed things up.  Motivation helps.
 
Greg
Reply 5
Bessemer Bob
I’ll be sitting in the shade of the covered bridge at Bartonsville waiting for the track gang to pass! 

Think before you post, try to be positive, and you do not always have to give your  opinion……

Steel Mill Modelers SIG, it’s a blast(furnace)!

Reply 7
Bernd
I'll be following along. Especially interested in Gassetts, VT. Back in around early 1970's I chased Green Mountain from Bellows Falls to Rutland. Have pictures of the trip if interested.
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 5
skiwiggy
I'll be following along. Especially interested in Gassetts, VT. Back in around early 1970's I chased Green Mountain from Bellows Falls to Rutland. Have pictures of the trip if interested.
 
Bernd
I would love to see some photos of that trip. 
 
Greg W.
Reply 5
skiwiggy
I’ll be sitting in the shade of the covered bridge at Bartonsville waiting for the track gang to pass! 
I definitely hope I can do a scene of the covered bridge justice.  
 
Greg W.  
Reply 6
skiwiggy
The Original station Bellows Falls.  
 
IMG_20240303_202012291.jpg
 
Rutland Roundhouse turntable Connecticut River and canal .  
 
IMG_20240303_201807331.jpg
 
Greg W.
Reply 16
anteaum2666
Looks like a fun and ambitious project!  I'll be following along with interest.  Thank you for sharing.

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 5
StephenS_VH200
I can't wait to see you build out Bellows Falls, if anyone can capture all that action there - it is certainly you!
Reply 5
loco7mo
Likewise following along. Thanks for the share!
Rich N in J'ville
Reply 5
Bernd
I would love to see some photos of that trip. 
 
Greg W.
 
How would you like the photo's? Here in this thread or sent privately and you use them at your discretion?
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 3
skiwiggy
 
How would you like the photo's? Here in this thread or sent privately and you use them at your discretion?
 
Bernd
Hi Bernd, 
 
You can share the photos here if you would like.  Reference photos in the proper place easy to find. 
 
Thank you.
 
Greg W.
Reply 4
Bernd
Hi Brenda,
 
You can share the photos here if you would like.  Reference photos in the proper place easy to find. 
 
Thank you.
 
Greg W.
Ok, I'll do that.
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 4
skiwiggy
Ok, I'll do that.
 
Bernd
I see that some kind of autocorrect change the name to Brenda sorry about that.  It's important to proofread. 
 
Greg 
Reply 5
skiwiggy
Postcard I just purchased.  Sometimes you can find clear views  of structures that are hidden in old photographs.  
 
Couple of the structures I plan on scratch building, located behind the passenger station.
 
Really great view of the rise of the terrain.   
 
 
 
Screenshot_20240305-211330-338.png
 
IMG_20240303_201959576.jpg
 
Greg W. 
Reply 19
skiwiggy
This is the adjoining room that was mostly cluttered workshop.  Half the wall was covered in pegboard with all the tools.  My workbench used to be about where the ladder is in the photo.  
 
That is the wall that will eventually have the scene of Bellows Falls on the bottom and Chester Vermont above.  
 
 
IMG_20240302_215559950.jpg
 
The plan is to have both the lower and upper level track go through the wall on the left behind the utility room doors and pop out on the right hand side.  Top level will be a duck under bottom level will be removable for access. 
 
I have been working the last couple months on prepping the room adding new LED panel lights, and moving and installing new electrical outlets. 
IMG_20240302_215559950.jpg
IMG_20240302_211346158.jpg
 
Part of the cleanup was organizing the paint booth area.
 
 
 
IMG_20240227_205224497_HDR.jpg
 
Greg W. 
Reply 19
Bernd
I see that some kind of autocorrect change the name to Brenda sorry about that.  It's important to proofread. 
 
Greg 
You are not the first to do that. My natural gas bill is labeled like that. I haven't been able to change it. 😠  😄
 
On to the pictures. I have 78 pictures in total. I'm looking at a way to coordinate with your posts. Any idea of how you'd like to have it done? I will be following instructions by you on how you would like them posted. I think that way the posts won't be disjointed on the subject matter. 
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 3
skiwiggy
You are not the first to do that. My natural gas bill is labeled like that. I haven't been able to change it. 😠  😄
 
On to the pictures. I have 78 pictures in total. I'm looking at a way to coordinate with your posts. Any idea of how you'd like to have it done? I will be following instructions by you on how you would like them posted. I think that way the posts won't be disjointed on the subject matter. 
 
Bernd
Any pictures of Bellows Falls would be a great start.  We can move on from that once the scene takes shape.  
 
Greg W
Reply 5
Bernd
Any pictures of Bellows Falls would be a great start.  We can move on from that once the scene takes shape.  
 
Greg W
Ok, Good. Sounds like a plan. I'll get them together and hopefully post them tomorrow. Pretty full schedule after lunch today.
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 4
Kevin Parson SeeYou190
skiwiggy Wrote: "It is a small start of a two foot section of benchwork transitioning between rooms."
 
I had to run through the wall twice on my "Spare Bedroom" layout.
 
That was the only part of the layout that actually turned out like I intended.
 
-Kevin
Living the dream and happily modeling my STRATTON AND GILLETTE Railroad in HO scale. The SGRR is a freelanced Class A railroad as it would have appeared on Tuesday, August 3rd, 1954, in my personal fantasy world of plausible nonsense.
Reply 3
skiwiggy
skiwiggy Wrote: "It is a small start of a two foot section of benchwork transitioning between rooms."
 
I had to run through the wall twice on my "Spare Bedroom" layout.
 
That was the only part of the layout that actually turned out like I intended.
 
-Kevin
Hi Kevin,  
 
With the plan I have, you will one day see a total of six holes in the wall.  Actually 2 of those through steps.  I am trying to whisper because I don't need the lady upstairs to freak out about what I'm doing down in the dungeon 😜.  
 
Greg W
Reply 6