Tweaking has two popular definitions - the first relates to methamphetamine use, which I have nothing to do with.
The second refers to making minor modifications and improvements to something, in search of a theoretical optimum of performance or design. I'm dealing with the second definition here.
I'd pretty much figured my mainline of my railroad was finished. Thanks to a ad hoc bridge across the aisle and a reverse loop it formed a circle... eventually... and provided access to staging from both ends of my layout. All of my industries were decided on and track had been laid for them.... except one. At the far north end of my layout, just before the track curved around into staging, I was going to put some sort of wood products industry. This being the Pacific Northwest and my having gone from "reasonably prototype" to "geographical proto-lance" one industry to the south, I had a lot of flexibliity. Seriously considered options included a wood chip dump, where the gondolas were run through a rotary dumper and the chips then sent over to a barge for shipment downriver, a paper mill (all sorts of loads in and out), or a plywood mill - preferably a freelanced version of Astoria Plywood, which was torn down in the 90s and where my dad and assorted other relatives worked. Atlas even made up some of the boxcars that they leased from USLX in the 70s/80s.
Up until tonight the chip dump was winning. I've got the rotary dumper (thank you Walthers and my wife) waiting to be assembled, I've got photos of the chip dump and conveyors as it was being demolished to make a park, and it's actually the closest one to the prototype at that end of my prototype.
Up until tonight.... I've also held off trying to figure out how to operate this railroad in part because I knew it had a serious weakness - my northernmost two industries were stranded beyond my last passing siding. While running a track cleaning car around my layout tonight I took a look at my undecided industry - that already had a nice puzzle of switches glued down - and decided it was time to pry up some track - and cut the mainline. Where I had a simple spur exit into a series of crossovers terminating in three industry tracks I would instead have a turnout into another turnout, one side of which would be a passing siding capable of holding at least 4 63' woodchip gondolas and the other would be split into a woodchip spur and a "finished products" spur. And with that... it's going to be Astoria Plywood.
Sometimes I really surprise myself with how fast I'll start doing something once I decide on it. A leftover thing from the Army, I think. Before I knew it I had ripped up the old track and was laying out out re-used rough track to get the lengths and positioning right... and then I started cutting.
Then it was time to put down the cork (I barely have any left... I may have to go beg some from my father-in-law). I'm known for being a bit unconventional when it comes to weighing down stuff I'm gluing down - Charlie Comstock dubbed one of my methods "the Campbell's Soup train," as it consisted of a lot of soup and fruit cans laid on their sides holding my track down as it dried. This time was no exception - there is cork under there:
So what did I gain from about an hour and a half working on my layout?
1. A location for a much needed passing siding;
2. A final decision on what an industry will be; and
3. Some serious time enjoying my layout - which has been in short supply lately.
Check back soon - track should go in tomorrow.

Jeff Shultz - MRH Technical Assistant
DCC Features Matrix My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington