jeffshultz

  Tweaking has two popular definitions - the first relates to methamphetamine use, which I have nothing to do with.

  The second refers to making minor modifications and improvements to something, in search of a theoretical optimum of performance or design. I'm dealing with the second definition here.

  I'd pretty much figured my mainline of my railroad was finished. Thanks to a ad hoc bridge across the aisle and a reverse loop it formed a circle... eventually... and provided access to staging from both ends of my layout. All of my industries were decided on and track had been laid for them.... except one. At the far north end of my layout, just before the track curved around into staging, I was going to put some sort of wood products industry. This being the Pacific Northwest and my having gone from "reasonably prototype" to "geographical proto-lance" one industry to the south, I had a lot of flexibliity. Seriously considered options included a wood chip dump, where the gondolas were run through a rotary dumper and the chips then sent over to a barge for shipment downriver, a paper mill (all sorts of loads in and out), or a plywood mill - preferably a freelanced version of Astoria Plywood, which was torn down in the 90s and where my dad and assorted other relatives worked. Atlas even made up some of the boxcars that they leased from USLX in the 70s/80s.

  Up until tonight the chip dump was winning. I've got the rotary dumper (thank you Walthers and my wife) waiting to be assembled, I've got photos of the chip dump and conveyors as it was being demolished to make a park, and it's actually the closest one to the prototype at that end of my prototype.

 Up until tonight.... I've also held off trying to figure out how to operate this railroad in part because I knew it had a serious weakness - my northernmost two industries were stranded beyond my last passing siding. While running a track cleaning car around my layout tonight I took a look at my undecided industry - that already had a nice puzzle of switches glued down - and decided it was time to pry up some track - and cut the mainline. Where I had a simple spur exit into a series of crossovers terminating in three industry tracks I would instead have a turnout into another turnout, one side of which would be a passing siding capable of holding at least 4 63' woodchip gondolas and the other would be split into a woodchip spur and a "finished products" spur. And with  that... it's going to be Astoria Plywood.

 Sometimes I really surprise myself with how fast I'll start doing something once I decide on it. A leftover thing from the Army, I think. Before I knew it I had ripped up the old track and was laying out out re-used rough track to get the lengths and positioning right... and then I started cutting.

 

 

 

 

Then it was time to put down the cork (I barely have any left... I may have to go beg some from my father-in-law). I'm known for being a bit unconventional when it comes to weighing down stuff I'm gluing down - Charlie Comstock dubbed one of my methods "the Campbell's Soup train," as it consisted of a lot of soup and fruit cans laid on their sides holding my track down as it dried. This time was no exception - there is cork under there:

_640x480.jpg 

So what did I gain from about an hour and a half working on my layout?

1. A location for a much needed  passing siding;

2. A final decision on what an industry will be; and

3. Some serious time enjoying my layout - which has been in short supply lately.

Check back soon - track should go in tomorrow.

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Rio Grande Dan

Jeff: your thinking reminds

Jeff:

your thinking reminds me of an old friend of mine, also the way you do things or how you described how you do things.

Think, argue & discuss within your mind and then ATTACK.

well it always worked for him & he was one heck of a Modeler.

I will be following your progress and waiting to see what Walters Rotary Car Dumper looks like and do they really dump.

As far as the Campbell's Soup train. You brought back old memories of my mom yelling at me in the Garage when I was around 12 years old because I had taken every canned good she had and used them to weigh down my tracks waiting for the glue on Ties to dry to the roadbed.

DAN

Rio Grande Dan

Reply 0
ChrisNH

A willingness to make changes

A willingness to make changes seems to be a good model railroad trait!

The plywood plant sounds a lot more interesting. Wouldn't that mean you get to use a lot of those centerbeam flat cars or is that after your layout's era? I think they are some of the cooler of the modern era cars.

Chris

“If you carry your childhood with you, you never become older.”           My modest progress Blog

Reply 0
jeffshultz

Rotary Dumper

...ah yes, that's going to be come a problem I think. You see, a plywood mill doesn't need one. It's also one of the "last generation" ones - I believe the next generation will actually operate.

To see an operating one that Paul Mack (I believe his username here is KJD) put together using old VCR parts and inspiration, see this:

https://forum.mrhmag.com/post/rotary-dumper-12184394 - it includes links to how he built it (and the rotary couplers he designed) and a short movie of it in action.

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
dfandrews

industry down the main

Regarding having an industry orphan in the middle of the mainline, UP serves a P&G paper products plant east of Oxnard by pulling out of town with the loads, running the two miles to the P&G spur (trailing point switch), dropping, picking up, and then, shoving two miles back up the main to the yard.  One of the crew rides the back of the last car back to town on the main (I hear them on the radio at the two grade crossings:  "gates goin' down;...;gates down, all traffic stopped, good for 20"). 

I have seen, in years past, the same movement done without radio:  the crew operates on hand signals, at a much slower speed.

Occasionally, they take a caboose along.  Then the caboose is left on and holds the main while they're switching in P&G, and then the crew has a safer place to ride for the shove back to town.

Don - CEO, MOW super.

Rincon Pacific Railroad, 1960.  - Admin.offices in Ventura County

HO scale std. gauge - interchanges with SP; serves the regional agriculture and oil industries

DCC-NCE, Rasp PI 3 connected to CMRI, JMRI -  ABS searchlight signals

Reply 0
ChrisNH

That sounds like it would add

That sounds like it would add a lot of operational interest..

 

“If you carry your childhood with you, you never become older.”           My modest progress Blog

Reply 0
Chris VanderHeide cv_acr

Plywood

I think that plywood is shipped in boxcars or RBLs and not flatcars to protect it from the weather. 2x4s and other board lumber is shipped on flatcars.

And a plywood mill of course would load chip cars, not empty them. (A chipboard or OSB mill might receive loaded chip cars for turning into finished product.)

Reply 0
jeffshultz

Plywood Boxcars

Yes, these will be the star attraction at the Astoria Plywood mill:

Interesting thing about them is that they were supposed to have a logo involving the Astor/Astoria Column on the right side panels, but the paint shop either forgot or didn't know.

At least a wood chip loader should be easier to model than an unloader....

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
ratled

Looks like fun

The changes sound great. Are you going to use the blue building as the base of the plywood factory?   It’s a nice looking building – a kit? Also, besides the MT’s for in bound cars, what other cars and loads will you have for in bounds?

 
Keep us posted
Steve
Reply 0
Joe Brugger

Good move

It's always smart to model what you know. Don't forget someplace to receive the veneer and/or peeler logs and the tank cars of resin. Don't know which, if any of the Albany plywood mills are running. Do you have good photos of Astoria Plywood?

Reply 0
jeffshultz

Pikestuff Enginehouse

The blue building is the Pikestuff enginehouse building and it's been waiting for a purpose since about 1996... it just might become part of the mill. It's the right design.

Actually with this sort of mill it was empties inbound, loads outbound. The real one actually trucked all it's chips out, probably to Wauna to the paper mill there. 

I'm mentally working on the log pond.... which probably won't be rail-served, due to space constraints.

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Full mill

Astoria was a full mill - they peeled their own logs and all, so all I need is a log pond. Tank cars of resin... hadn't thought of that.

Looks like I'll be building it off of memories - no photos on Google that I can find. Maybe some relatives have them.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Joe Brugger

Astoria Plywood

Or the Clatsop County historical society.

Reply 0
jeffshultz

Clatsop Co. Historical Soc.

There's a thought! Thank you.

Not going to get the track laid tonight - I had a bit more cork to lay down and when it dries I'm going to be sanding it into a slope. I also discovered that the supplies of clear adhesive caulk that I thought I had.... aren't there.

So I'll need to buy a little of that.

I will say, it's been facinating thinking about this project - I'm mentally moving stuff all over the place and I've got a lot of flexibility as to where the actual spur tracks end up.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jbaakko

Jeff, I'm down to using some

Jeff, I'm down to using some railroad spikes I've collected from my railfanning trips, on top of ~12" strips of 1x2, so I know how you feel when gluing track.
Reply 0
ceo eerielackamoneyrr

change

Hi Jeff, I have a brief question. It looks like you're using #6 TO's to your new siding, with a second TO off the diverging side of the TO. do you foresee any issues with the S curve that results from that arrangement? I ask because I'm about to try basically the same thing (although cutting a new TO into a yard lead) and am worried about negotiating the curve with Thrall tri-level auto racks. Your input would be appreciated.

                                                    Gerr S.

Reply 0
jeffshultz

Turnouts and S Curves

Worse yet - they're #4 turnouts.

I'd probably be worried about that too, except that I expect that all the cars following that curve will be 50'  or maybe 60' boxcars. The longer chip hoppers will mostly go on the straighter path. 

Tim Warris had a pretty good article on S curves and how they aren't as nasty as everyone thinks in the first issue of MRH.

But now you've got me thinking. Time to look at that again, just in case.

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Josh Herzberg

Astoria Plywood

Jeff, I know this is an old thread... but has there been any progress with your plywood mill? 

I've been kicking around modelling the former US Plywood/Champion plywood mill in my hometown...  with visions of six or eight 50' double door boxcars lined up under an awning alongside the loading dock... someday!  I think it's a great idea for an industry. 

As far as glue goes, the mill here had glue delivered in giant "bags" that I believe were shipped by truck.  This mill was initially a "whole" mill like Astoria plywood was, but in its final years bought all its veneer from other mills and was strictly a layup plant.  I've heard that Freres Lumber Company over your way has shipped or recieved at least some veneer by rail, so that might be another option, versus having to have a log pond.  I've considered only showing the "face" of the mill and ignoring the rest by simulated depth.  As a sidenote, my father-in-law worked at Astoria Plywood until they closed up. 

SP in Oregon, drifting back and forth between 1975 and 1983.....

Reply 0
jeffshultz

Progress on the Plywood mill

Not really - I've got a couple of woodchip dumps built (truck & rail) and a woodchip truck/trailer combo, I do have one new building - I built a double-high Pikestuff building by essentially building two of the same kit, one on top of the other, secured internally by Evergreen square shapes in the corner.

Unfortunately I haven't had a lot of time for modeling lately - I'm just about to finish up installing my current stock of Sergent couplers. Happiness means that the next order should be the last one for awhile.

Oh, your father-in-law probably knows my uncle & cousin(s). Ask him if he knows anyone with the last name "Dunn." 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Reply