joef

I'm continuing to dismantle my old Siskiyou Line 1 and exploring how to build the new Siskiyou Line 2 TOMA modules. There were some questions around all this on another thread, so rather than pull that thread off-topic, I've moved those discussions here.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
Prof_Klyzlr

Q&A

Dear Dr Geoff,

In order of appearance:

Quote:

I understand how the interleaved plates on the rigid metal skeleton provides front to back alignment, but how do they force vertical alignment of the structure?

Simply, as they are interleaved, neither module-end can lift or drop without the other. See below:

Lets start by color-coding the module frames.

hlighted.jpg 

Now, if we attach the interleaved tongues, they look like this
(apologies for the poor Photoshopping)

hlighted.jpg 

Press the modules together, and the tongues interleave.
(NB that the MDF end plates are not shown in these examples.
Yes, this spaces apart the aluminium frame members 2x MDF thicknesses,
No, it does not significantly mechanically affect the behaviour and accuracy of the end-result alignment)

hlighted.jpg 

Note: 
- If the RED module end drops DOWN, the RED tongues will press down on the GREEN module end,
(both modules stay in alignment)
- If the RED module end lifts UP, it will press against the GREEN tongues, and thus the GREEN module end
(both modules stay in alignment)
- If the GREEN module end drops DOWN, the GREEN tongues will press down on the RED module end,
(both modules stay in alignment)
- If the GREEN module end lifts UP, it will press against the RED tongues, and thus the RED module end
(both modules stay in alignment)

Note also that with the sheer number of tongues and the overall-width of the "alignment array",
(all forces spread over a lot of contact points, and a wide footprint),
longitudinal "torque-ing" (twisting) forces between modules are also easily withstood.
(there is no single "axle" pivot point or edge which a "twist" force can pivot/hnge around).

A quick note about the tongues shown. They are cut from a 1200mm length of 40mm x 3mm aluminium strip.
The As-machined Width is far more consistent that anything the typical modeller could produce.
Therefore, simply laying/lining/mounting the strips side-by-side gives a reproducible 40mm-on-centre dead-reckoning spacing with no special or complex tools required and exceedingly-high repeatable horizontal-alignment accuracy.

Quote:

Is that slot they move into re-enforced in some manner? or specially constrained?

The slot in the MDF plate is not structural, the slot dimensions are only critical insofar as:
- the lower edge of the slot must be flush (or slightly below) the upper face of the aluminium frame tube
(IE so that the lower face of the tongues are absolutely guaranteed == to the top face of the frame tube member)

The Width and Height only need to be larger (within sane limits) than the cumulative-tongues-width and the thickness of the tongue material respectively.

Quote:

How do you attach two modules together at the side fascia? Is there a special connection made just for skeletal alignment and strength?

A quick refresher: There are three (3) separate but interrelated mechanical systems in play which need to be addressed:
1 - Module <> Module structural alignment (interleaved tongues in the above cases)
2 - Module <> Module assembly (the system which keeps the modules pressed together during operation)
3 - Rail-end/joint method (rigid flush-end in the cases above)

I'm assuming the question relates to part 2 from the above list.

There are a number of conceptual techniques and practical options/solutions,
(from the highly road-optimised/sublime to the randomly ad-hoc/ridiculous)
but in my case, over-centre caselocks have proven themselves over some decades to be a cost-effect and highly-functional solution.

locks_01.jpg 

NOTE! This shot is before the layout skirting was installed at it's debut exhibition. If the caselocks are mounted low-enough on the module frame, the skirting will cover them, making them invisible to all but extremely-dedicated close-inspection. (Painting the caselocks black would also help against the charcoal-grey car-carpet fascia too... ).

s_marked.jpg 

NOTE how the caselock is recessed within the fascia and thus forms a nice flush result with no exposed/protruding edges which may catch clothing etc

h_marked.jpg 

I should note that I do put caselocks on both the Front and Rear of each joint, so the clamping-force is even front<> back, and the modules won't try to "swing open"
(Front edge of the joint held closed, rear edge opens-up splitting the backdrop, sky, and roof).

I should also note that the rear caselock can (should?) be mounted half-way up the rear vertical frame member,
thus applying it's clamping force evenly U<> D along the rear edge of the module (MDF) end-plate.

If one is concerned about the leading front edge of the roof splitting,
(and realistically, if this is the case, then something about the module construction is not accurate and square as it should be, and/or the modules are incorrectly supported),

there's no reason why a caselock could not be mounted on top of the frame member (stealth)
or on the roof-fascia (just like the base fascia mounts shown above) to keep the roof ends together.

The pic below shows a LED dimmer unit I have mounted on the top RH corner of the "Toorong" layout modules, 
but a caselock could easily be "stealth mounted" to the frame up there and accessed without stress.

ation_01.jpg 

 

Quote:

Your exhibits do not show many modules strung together. How many modules have you connected side by side with such an arrangement?

My "personal best" has been 5 modules, but that's largely because I like building smaller layouts, 
and if the layout all-told doesn't fit in the Subaru Outback, there's too much of it!
(I've built and toured trailer-sized layouts previously, and it would take a massively-overwhelming-undeniably-impossible-to-ignore theme to tempt me to build another touring layout to that scope,
the logistical pain is just toooooooooo much to make exhibiting any level of enjoyable for me...).

However, there's no real mechanical reason why the system shown,
(or split-pin hinges, or pattern-makers dowels, or any of the other common High-accuracy Alignment systems)
should present a structural limit to the qty of modules one could assemble together.

Note that such accurate alignment system permits use of drop-leaf staging hanging off the rear edge of the modules, with tracks that cross the drop-leaf joints with the same accuracy as the module-borne tracks.

Quote:

Are all the modules connected in a specific order as A-B-C-D ? or are they more general as you can swap one like A-C-B-D?

In my case, the layout modules are typically only designed to go together in one fixed order.
I personally prioritise cohesiveness of the visual scene composition and presentation
(and resulting free-form track-array flexibility) over raw "modularity".

That said, I did engineer the track array and structural joining of the "Toorong" layout such that the 45-degree curved module (shown in various photos earlier in this thread and above) could be freely omitted,
and the "train turntable" staging module connected directly to the "Toorong station" module.

This allowed either:
- 14' x 3' "45-degree bent shelf" configuration (inc curve module) as shown in pics above
OR
- 10' x 1' "straight shelf" configuration (all the ops capability and required trackwork, no "pretty" fluff)

ng_TT_02.jpg 

Happy Modelling,
Aim to Improve,
Prof Klyzlr

PS having inadvertently hijacked Joe's SL1 --> SL2 (TOMA) thread,
I promise I'll try to keep fingers from keyboard *,
and look forward to Joe's next progress-report post...
 
* Probably a good reason for me to get back to the modelling bench,
and actually get back a'building on the current layout project

Reply 0
Geoff Bunza geoffb

@John & Prof K

Many thanks to John and Prof K for considered, detailed, and interesting commentaries. There are many well thought out ideas clearly expressed. 

I have enjoyed this thoroughly.
Have fun!  
Best regards,
Geoff Bunza

Geoff Bunza's Blog Index: https://mrhmag.com/blog/geoff-bunza
More Scale Model Animation videos at: https://www.youtube.com/user/DrGeoffB
Home page: http://www.scalemodelanimation.com

Reply 0
David Stewart

Affordable EMT?

Utilizing these:

-f4-6(1).jpg onnector.jpg 

This could be made, at 3' in length (suitable for the 44" module) for about $30-$35. A 6' version would cost $2.00 more; a 10' version would cost $6.00 more. Bigger is better.

0copy(1).jpg 

The canopy fittings: http://www.amazon.com/10pc-FLAT-CANOPY-FITTING-BATTING/dp/B06XBG5F99?ref_=fsclp_pl_dp_6

They are available from lots of other sources, though shipping charges may be problematic.

3/4 EMT costs $6.50 for a 10' length at Home Depot.

The Maker Pipe connectors are $2.75 apiece, with them claiming that shipping won't cost more than $7.99, so one would want to order all that would be needed in one go.

It's just an idea.

David Stewart

Reply 0
Neil Erickson NeilEr

ACE Here

Our ACE Hardware has all these components including the “T” so needn’t be a custom part. Consider a couple of diagonal wires and turnbuckles below the module. With the module in place and acting in compression, the cables add an amazing amount of stability. 

Neil Erickson, Hawai’i 

My Blogs

Reply 0
David Stewart

Turnbuckles

I agree that they would add a lot of stability. But they do add cost and construction complications. Because the cost difference would be minimal, for extra stability I would use a couple more of the specialty fittings and another length of conduit between the two uprights. Those Maker Pipe fittings appear to make very rigid joints.

I have to admit I'm not sure how rigid the canopy fittings would be.

One of the the things I find appealing about this general approach is how quickly and easily these could be built. With a tubing cutter and an allen wrench you could build a lot of benchwork in a day. Also I was a woodworker (furniture) for 40 years; somehow running a saw has lost its appeal.

I also get, Neil, that sitting on your butt ordering things to your doorstep isn't quite the same in Hawaii as it is in Utah. (Too much trouble to insert the okina.)

David Stewart

Reply 0
Neil Erickson NeilEr

EMT Pipe fittings

EMT is pretty common everywhere so a little thought and a hammer usually does the trick. As a kid I built a geodesic dome with the stuff by pounding the ends and drilling holes for thru bolts. You quickly learn the difference between compression and tension in a structure. 

Hawai’i has challenges but USPS and Amazon have me on the map. Seems I can get nearly anything off eBay as well but may have to wait a couple weeks. 

I have to admit that I am torn between building a layout quickly using conventional means vs the extra effort for TOMA. After building and destroying quite a few layouts, I look forward to starting again with new ideas and experience. 

Neil Erickson, Hawai’i 

My Blogs

Reply 0
Marc

My attachments

 

Yes, I'm a iron worker and this open some opportunities to build specific hardware.

This mean also an access at heavy tools.

But may be this design is workable for a few of us, so I share it.

As mentionned often my layout is build in module like TOMA .........just dad and me decided to follow  this type of design 40 years ago !

It's important to say I use 18 mm plywood in open grid style; all the frame is plywood glued together.

In the beginning, the modules where just bolted together, this work fine until the layout was moved severals time.

It was necessary to build a strong attachements between the modules to be sure everything is aligned again if a new move could happend without future alignement trouble.

And this is the case again since I move to Canada this summer with my layout.

This was the basic design of a very strong attachement, knowing, some of my modules are big, one is 4.5 feet by 7 feet feet in one piece.

The design has evolded because for safety and reinforcement after unfortunately severals moves;  the modules are since ten years screwed on a iron frame made of square tube of 1.5" and 0.4 tickness soldered together; all the frame are bolted together and sit on special feets again in iron; the frame have a male female design on the side so they clamp together exactly.

Anyway this is the design of the first attachements when no iron frame was put Under the modules.

They are extremly strong and when bolted extremly rigid whith no possibility of any play; as mentionned they are in iron, soldered and machined and the angle which I used was draw metal profile which is perfectly square and offer an angle Inside  wich is square and not curved.

This is a small sketch I made to explain how I build them; measures are in mm but if interested I can give you everything in inch.

 

The angle is taped for 8mm nuts or 1/3' diameter, length is 31" on a width of 3"; the soldered pin has a diameter of a bit more than 1/2"; the female plate is drilled for the nuts and the tube which go through the plate have an Inside diameter which correspond of the diameter of the pin, thickness is 1/3" for the angle and the female plate.

This is the front view of the piece A, the male one: the bottom is taped to receive bolted feet with a leveling nuts

This the female front view, both piece are screwed on the plywood face Inside the grid; the tube allow a passage trough the plate; notice this tube as a maximum lenght of 1.1" knowing the two plywood side grid  togheter give a tickness of 1.4", this give the possibility to have a good pressure when the nuts are keep tight.

This is how the assembly work with the open grid plywood; the feet come just Under the return of the angle at the bottom Green is male, Red is female

Now, the feet are just a plate on which the iron frame are placed, each frame is bolted to this plate

 

 

On the run whith my Maclau River RR in Nscale

Reply 0
Moe line

Example

Hello Joe, and everyone, I am going to try to attach a download here, which unfortunately is only the track plan, and not any pictures of a layout built in similar design to Joe's ideas. I know the two men personally who built this portable layout with its shadow box design, and have helped them set it up at train shows in the past. The layout sections are rather heavy, and require three men to set them up when putting the layout together for a train show. The legs on this layout are the standard folding portable table legs, that have been extended to a taller height with the addition of conduit sections. The layout is a On30 logging themed layout, named Gold Creek Timber Co.

The assembly of the module sections use the same Kam Konnect locking connectors that I use for my lightweight modules, and the modules are perfectly aligned every time it is assembled. The full article on this layout first appeared in Great Model Railroads 2019 from MR magazine. I wish I had some pictures of this layout to share, but I failed to bring a camera to the shows where it was exhibited, and because it is close to where I live, was able to see it anytime I wanted. The file can't be uploaded here, so anyone wanting to see the related article would need to reference the above mentioned magazine. Jim.

 

Reply 0
Neil Erickson NeilEr

Gold Creek

Jim - Is this the one? Click on the picture for the site. 

3B65710.jpeg 

Neil Erickson, Hawai’i 

My Blogs

Reply 0
Moe line

@Neil

Hi, Neil, yes that is the layout I was referring to in my comments, thank you for finding the link to their website. Hopefully, Joe and anyone else interested in the shadow box style of TOMA will find it interesting and useful as information. Thanks again, Jim

Reply 0
Prof_Klyzlr

Gold Creek

Dear Moe, Any chance of some numbers on that "too heavy, needs 3 guys to assemble" design? Specifically: - Overall Dimensions of the modules L x W x H - Weight per module (pound or kilo, whichever) - and for comparison-sake, approx material cost per module I'd be intrigued to plug the values into a comparison of some other recently-mentioned proscenium design examples... Happy modelling, Aim to Improve, Prof Klyzlr
Reply 0
jefflee

Siskiyou Version 2

Joe,

You'll get there.

I am helping folks on the LDSIG at the NMRA convention right now  in Salt Lake City.

It is a real pleasure to see the enthusiasm from folks planning a new layout. Your thoughts and that of others are making an impact. There is a real change in discussions towards getting something done. I have just finished a session with a great guy who could fill his basement, but wants to get something going soon. TOMA or an equivalent was our conclusion. Start with one LDE (switching layout) that can be part of the future if desired, but get it going. He will have locos running in a month.

PS: good luck with the dumpsters.

Reply 0
Moe line

@Prof_Klyzlr

The three sections of the layout that have the full shadow box design, are almost 2 feet high, the longest one is 8 feet long by two feet wide, while the other two sections are just over 6 feet long and 2 feet wide each. I couldn't tell you the exact weight of the modules, but I remember them as quite heavy, and we had one man holding each end of the modules, while another man held the middle for stability. The modules were front heavy and tended to tip forward during set up.

A fourth person is needed to set up the folding table leg extensions under the modules, and close the Kam Konnect style of locks with a 5/16 Allen wrench. The fourth person would not be needed if the extended folding table legs had been welded together, instead of being in pieces that require on site assembly. I have no clue how much the guys spent building the layout, but both men are NMRA Master Model Railroaders, and as you can see in the pictures that Neil provided the website link, the construction is top notch quality of the highest standards.

Reply 0
Brent Ciccone Brentglen

Separate Functions

I built my layout in a sectional style. On the first sections I sort of followed the $100 module design from our Australian friends, but since it is smaller I only partly followed that design (no curved backdrop). After years of use I have taken it down several times to work on a section, and I do need to take it down again soon to do some wiring. What I have found is that after repeated disassembly and reassembly the backdrop and lighting valance won't line up anymore even though the tracks do. If I was to do it again I would separate the 4 functions:

1) the layout base that holds track and scenery

2) the backdrop

3) the lighting valance

4) the legs or other support structure

When I built an expansion I did make all of these separate with the backdrop and valance attached to the wall and the support structure being kitchen cabinets with the layout itself built on a 1 X 2 grid. Of course I did make another mistake in that I made one section too large, it is over 7 feet long by 20" wide. It wasn't too bad when I first built it, but then I added track and scenery and now it is too heavy to easily remove. Should have kept it to 5 ft max even though that would have meant changing the trackwork design since I would have had turnouts over the joints.

Having all these functions in one piece makes it heavy and difficult to align all the different parts, by separating them based on function, you can make each part appropriate for its purpose. I can see some benefit to having the back drop attached as that allows the section to sit on its back but at a cost of extra weight and difficulty in handling. Wouldn't be too hard to make some sort of brace to hold a section up while you work on the underside.

In my case I was 10 years younger when I started, since then I have had rotator cuff tears in my shoulders and haven't been able to lift the sections past my waist, so I have had to delay doing the wiring upgrades until my shoulders are better. So even if you are young and healthy (or have young and healthy helpers), you never know what the future might bring. That section that is easy to move today might not be so easy next year!

 

Brent Ciccone

Calgary

Reply 0
dark2star

Wiring

Hi,

this is just a stray thought... When building a sectional layout with built-in backdrop, the backdrop's back might be a good place to do all the module's wiring, with just the connector to the next module below the baseboard for easy access...

In that case, to work on the wiring would mean accessing the module from the back, but then all the wiring and components would (could) be layed out neatly and labelled easily. Of course that can also be done once the module is on it's side...

Guess this is more about handling the modules ("Can I turn it sideways on my own?").

Have fun!

Reply 0
railandsail

Experiments

That was an interesting posting you made on opening of this discussion. I just started to read thru your subject thread.

I decided to go with 'metal benchwork'. I documented some different ideas on this subject thread, and at least 3-4 different approaches on this page,...

https://forum.mrhmag.com/post/metal-benchwork-12207979

Granted my approach was rather 'heavy duty' as I used sizable metal 'tubes' that I obtained at my local metal scrap yard. Probably overkill, but in terms of taking it down it would be real simply. All of my decks are simply bolted to those metal beams with just a few bolts along the wall edges,...and the bolts and nuts are easy to get to. The beams themselves are simply lag bolted to the wall studs.
img.png 

 

Then there was this fellow who utilized 'portable workbench kits' he bought at a big box store,..

Reply 0
Joe Baker

TOMA

I think a lot of issues with alignment, strength, for TOMA / Sectional / Modular etc... have been solved already. I haven't read through this thread in detail because its too long, so if all this has been mentioned already, please disregard.

First, you need a couple of tools for woodworking or a friend with tools to make accurate, square cuts / drill holes (unless you go the ultra-light route with plastics that some people have done).

For alignment, make the C's of each adjoining module at the same time, screw them together, make sure all the sides line up (cut them together / file together, sand together, whatever...) and drill through them with a drill press or something that lets you drill at 90 degrees. Glue in alignment dowels to one of the C's.

Make sure your module legs have adjustable feet or bolts at the bottom.

You'll get perfect alignment every time with little fuss.

Make the C's out of good 1/2" russian birch (or some other cabinet grade plywood) or use 3/4" plywood with a sanded face. Make the C's 2 1/2 to 3" thick on all sides. You can then cantilever the valance and lighting at least 21" without worrying about sag. It can even handle a little storage and some temporary stacking.

Wiring for lights can be run through holes in the C's along the top of the sections and connected with any number of handy connectors.

Wiring along the bottom of the layout can be run between two L-girders that are permanently connect to the bottom. Legs bolt to the L-girders. 

If you recess the front L-girder by a few inches you have lots of room for recessed control panels and hanging a skirt with clothes pins glued to the L-girder. You can also get hands in for taking the bolts off / putting them on.

Make sure the fascia bottom and bottom of the L-girders are flush so all the weight doesn't rest on a thin fascia when transporting. Similarly, make sure the valence and top of the Cs are flush so weight is properly dispersed when stacked.

Once you know where your skirting / wiring / control panels are going, reinforce the fascia underneath (unless your fascia is 3/4" thick). Tie it into the L-girder, but leave a slot for skirting to pass under.

For transport, screw some spare 1 x 2 on each end of the module to make the C into a square, make sure the 1 x 2 is the exact height of the C and that both ends are flush with the top and bottom structure of the modules. You can then stack them for moving without worrying much.

Seal it all up with some polyurethane or something similar if you are inclined (I haven't and I have no problem with misalignment or derailing).

At the joints instead of 1/4" cork use a strip of wood (hardboard, plywood, whatever, that's smooth) that's the same thickness as your roadbed. Make it about 1" wide on either side of joint.

For track joints, glue down 4 PC board ties on either side of the joint (8 total), use Gorilla glue or something similar. Solder the track to the board ties, then cut them apart along the joint with a saw.

Make a portable / easily disconnectable DCC / Turnout power / Uncoupler Power / whatever shelf or box that sits underneath one of the modules.

I discuss how I made mine here (and I got the idea from this guy - https://model-railroad-hobbyist.com/node/21914):

https://model-railroad-hobbyist.com/node/28603

I've moved my layout (L shaped 16' x 13' with six sections) several times with no issues. I can even tip the modules up/down to/from the ground to assemble / disassemble the legs on my own. It's about a 3hr affair to either assemble or disassemble. If I had made it out of 1/2" cabinet grade plywood instead of 3/4" sanded fur I could probably drag / carry them up the stairs on my own too (4' and 6' sections).

With enough planning this can be done with grades. It's just a lot harder to make changes after the fact if you don't like the result.

 

 

The tricks to all this are the know how, tools, and patience. Not everyone has those.

Reply 1
Joe Baker

Plywood

Also, making the C's can waste a lot of plywood. You might be able to save lumber with good lap joints, but I haven't tried those. Have a plan to use the spare wood squares that come from the center of the C's, like a small shelving unit or something like that.

Reply 0
railandsail

Side Fasteners

Quote:
Question 2 & 3 - attaching modules at the fascia - If your alignment method and support is done well enough, then all the side fastener has to do is to hold the modules together and prevent them from spreading. I've used hinges with removable pins and Prof has used suitcase locks to hold modules together. Detail photos of the hinge setup can be provided if required. The key thing here is that the fasteners have to pull together tight enough to prevent any "mechanical slop" at the railhead in any of the 3 axes.
 
John Garaty

I'd be interested in seeing those side fasteners you mentioned,...for use over here to align my deck edges...

https://forum.mrhmag.com/post/layout-room-entrance-swingdown-bridges-3-of-them-in-combo-12210684
 

Reply 0
Reply