jeffshultz

Last night was op session night on the Siskiyou Line (sorry, no photos from me) - April 14th, 1989. The SP has been bought out by the Rio Grande... and survives as the SP. Speedlettering is making an appearance. D&RGW locomotives (in this case two lovely Atlas GP40-2's of Ron Smith's) are showing up on the Siskiyou Line. Even had a set of Cascade Green BN power including a B30-7B(?) unit. Wish I'd had my camera - the GP40-2s ended up as helper power and I set the BN set as the head end power for the Seagull West out of Roseburg. I was yardmaster for a boring (for Roseburg Yard) first trick.

Second trick I was paired with a first time (I believe) visitor to the Siskiyou Line, John. Our first job was the Rice Hill Rocket - otherwise known as the Oakland Turn. Now, somehow I've managed to not actually work any of the switching turns (Oakland, Dole, Yoncalla) on the Siskiyou Line for the past couple years. Mostly it's been because they usually take place on second trick and I've been grabbing the second trick yardmaster slot a lot. A bit of it is because after my first couple experiences on the Dole Turn, I really wanted little to do with it anymore. Stressful job, that one.

So I get a track warrant from "round the clock" dispatcher Charlie Comstock (who was having a very interesting night with a nasty tangle of trains) and John cracks the throttle... and off we trundle to Sutherlin, officially at Restricted Speed due to Trains, Men or Machinery on the track. We get to Sutherlin and start juggling cars around (and I make a couple errors that demonstrate how long it's been since I've done this there). And then John notices that the track doesn't seem to be glued down anymore at one end of Sutherlin siding. And then we notice that it isn't glued down at the other end... and it's bowing upwards in both places. Um, wait a minute - the main is loose too....

"Dispatcher, please contact Trainmaster Fugate - the track in Sutherlin is FRA Class Sucks Badly."

"What?"

(A chorus of laughter and one "embrace the suck" in the background later...) Joe shows up and starts looking at the track in mystification. With the bowing and kinking of the track it's obvious that somehow the layout there - which is against one wall of his house - has shrunk!

Discussing it in the lounge later, Joe figures out what happened - our last op session, which was in November, was actually quite warm. Warm enough that he'd opened the windows that were located behind and under the layout there.

Fast forward three weeks - he's got the furnace vents in that room set to wide open and it's still really cold and damp in the layout room. And he remembers the windows. He closes the windows....

... and forgets the furnace vents set to full. For a couple of weeks at least.

Anyone who's washed certain clothing in hot water and then dried it on high heat can appreciate what happened to that end of the layout. It now fits in a slightly smaller space than it did in early November.

And because nickel-silver doesn't shrink at the same rate as wood, Joe has some trackwork to adjust before the next op session.

 

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
marcoperforar

Sessions once a quarter aren't enough

Joe needs to pay more attention to his layout.  Run a train or two every couple of weeks or so.  Spend an hour a week on the layout.  And if too busy (as if he has a magazine to do), have Jeff do it....  How does Joe relax?

Mark Pierce

Reply 0
Wolfgang

notice

You should make a notice, on RED paper.

And place it at the door.

Wolfgang

Reply 0
IronBeltKen

Time for metal benchwork?

Stories like this convince me that, if and when I build my next layout, I should use aluminum or steel benchwork instead of wood.  Might be worth the extra expense to keep these ugly surprises from showing up.

IBKen

Reply 0
Scarpia

Same thoughts

I was having the same thoughts, Ken, due that we have high humidty here in the summer, and it's bone dry in the winter.

I was thinking the structural 2x4's and a foam/homosote laminate.


HO, early transition erahttp://www.garbo.org/MRRlocal time PST
On30, circa 1900  

 

Reply 0
jeffshultz

Sessions are normally monthly...

With breaks over Christmas... and if I remember right, the Summer, when everyone has other things to do and when it gets really hot down there will all those 25W bulbs going. Both December and January got skipped this year because the release of the first issue was pretty much the same week as the op session would have been.

This one just came as a total surprise - after as many years as the layout has been in existence, who would expect it to shrink?

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
feldman718

Surprises

Surprises always come about because we don't pay attention to the things we do and their possible consequences. You saw one that was really a surprise to everyone. But that is life.

I can tell you about one that happened to me a few years ago. I came home from work and it was snowing but we didn't have much of an accumulation yet. I still parked the car as close as I could ge to my front door and still be in my drive way.

When I got up the next morning and looked out my front window I saw about 8 inches of snow and figured I would have some job cleaning up the drive way and getting the car out and wnet about my usual morning routine. When I got out the front and looked at the car in the drive way, I knew I was in for trouble. The car was not only covered by snow but it had become part of the side of my house because the wind had piled the snow on it and it looked like there was a garage there with a car sticking out!

Irv

Reply 0
bear creek

Relax?

Quote:

Joe needs to pay more attention to his layout.  Run a train or two every couple of weeks or so.  Spend an hour a week on the layout.  And if too busy (as if he has a magazine to do), have Jeff do it....  How does Joe relax?

Relax? Um, Joe had the choice of getting issue #1 of MRH out in January or of preparing for an op session. It seems that everything always takes longer than it should.

As a computer programmer I can tell you there is truth to the old adage about scheduling by figuring out how long you think a project should take then double the quantity and moving to the next larger unit. So a project you figure should take 2 days may really take 4 weeks!

Regards,

Charlie

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
bear creek

notice...

Quote:

You should make a notice, on RED paper.

And place it at the door.

Wolfgang

I used to drive a 1970 BMW 2002. A great car in almost every respect. But I had troubles with the battery going dead/flat. This happened because I'd turn the headlights on when encountering fog or just when I wanted to be extra visible to oncoming drivers - then I'd forget they were on and when I'd return to the car the headlights were dead and so was the battery...

No matter how I strived to remember the freakin' headlights I couldn't seem to consistantly (or even most of the time) remember to turn 'em off. So I wrote a note on a piece of paper "Turn off the headlights dummy!!!" and I'd impale that with the ignitiion key (you could actually remove the key while the engine was running in that car!).

For some reason I could remember to impale that piece of paper when I switched on the lights. After that I only suffered dead batteries when the charging system failed (but that only happened once).

Whatever...

Charlie

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
joef

Images of the bad track in Sutherlin

Now that the op session is over, I've assessed the damage to the track at Sutherlin and it's not insignificant - but fortunately it will be easy to repair. I'm just lucky I've not yet ballasted this track, since most likely the rails would have popped off the ties if things had been ballasted.

Here's an animated GIF of the track that has lifted off the roadbed (was glued down with gray latex caulk):

ad_track.gif 

As it stands, I need to remove some rail joiners and use a motor tool to shorten the track slightly - then glue everything down again. I think I will also use this opportunity to finally ballast and finish the track here in Sutherlin.

This shows how important it can be to leave proper gaps at railjoiners. In this case the shrinkage was excessive because of some mistakes on my part that exposed this end of the layout to some extreme environmental changes. Here's another photo of the damage:

d_track2.jpg 

Live and learn! Fortunately, no rail has popped off the ties, so this will be pretty easy to fix once I restore the proper amount of gap in the track ends (by grinding down the track ends with a motor tool).

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
bkempins

I saw this same problem 2 weeks ago

I was at an ops session two weeks ago. Several tracks had developed kinks. It did put a crimp in the op session, but we were able to work around them.

 The layout is 6 years old in the basement of a townhouse served by a heat pump.   Basements in Northern Virginia town houses are notorious for being cold in winter. Combination of poor heat distribution in a tall skinny house, and heat pumps being inadequate in this climate. This winter was cold, especially the two weeks before the session.

Bernard Kempinski

​
 
Personal Layout Blog: http://usmrr.blogspot.com/
Reply 0
blowncylinder

So the shrinkage occurred in

So the shrinkage occurred in the middle of an arc--Ouch that must hurt. I don't have quite that issue as we stuffed a dehumidifier in my trainroom. We use dehumidifiers a lot around this house as we have a lot of things like paintings and such---stretch canvas does not like shrink/expand cycles much-- 

you have the right to self combust..so long as it is not in my house.

Reply 0
Reply