Last night was op session night on the Siskiyou Line (sorry, no photos from me) - April 14th, 1989. The SP has been bought out by the Rio Grande... and survives as the SP. Speedlettering is making an appearance. D&RGW locomotives (in this case two lovely Atlas GP40-2's of Ron Smith's) are showing up on the Siskiyou Line. Even had a set of Cascade Green BN power including a B30-7B(?) unit. Wish I'd had my camera - the GP40-2s ended up as helper power and I set the BN set as the head end power for the Seagull West out of Roseburg. I was yardmaster for a boring (for Roseburg Yard) first trick.
Second trick I was paired with a first time (I believe) visitor to the Siskiyou Line, John. Our first job was the Rice Hill Rocket - otherwise known as the Oakland Turn. Now, somehow I've managed to not actually work any of the switching turns (Oakland, Dole, Yoncalla) on the Siskiyou Line for the past couple years. Mostly it's been because they usually take place on second trick and I've been grabbing the second trick yardmaster slot a lot. A bit of it is because after my first couple experiences on the Dole Turn, I really wanted little to do with it anymore. Stressful job, that one.
So I get a track warrant from "round the clock" dispatcher Charlie Comstock (who was having a very interesting night with a nasty tangle of trains) and John cracks the throttle... and off we trundle to Sutherlin, officially at Restricted Speed due to Trains, Men or Machinery on the track. We get to Sutherlin and start juggling cars around (and I make a couple errors that demonstrate how long it's been since I've done this there). And then John notices that the track doesn't seem to be glued down anymore at one end of Sutherlin siding. And then we notice that it isn't glued down at the other end... and it's bowing upwards in both places. Um, wait a minute - the main is loose too....
"Dispatcher, please contact Trainmaster Fugate - the track in Sutherlin is FRA Class Sucks Badly."
"What?"
(A chorus of laughter and one "embrace the suck" in the background later...) Joe shows up and starts looking at the track in mystification. With the bowing and kinking of the track it's obvious that somehow the layout there - which is against one wall of his house - has shrunk!
Discussing it in the lounge later, Joe figures out what happened - our last op session, which was in November, was actually quite warm. Warm enough that he'd opened the windows that were located behind and under the layout there.
Fast forward three weeks - he's got the furnace vents in that room set to wide open and it's still really cold and damp in the layout room. And he remembers the windows. He closes the windows....
... and forgets the furnace vents set to full. For a couple of weeks at least.
Anyone who's washed certain clothing in hot water and then dried it on high heat can appreciate what happened to that end of the layout. It now fits in a slightly smaller space than it did in early November.
And because nickel-silver doesn't shrink at the same rate as wood, Joe has some trackwork to adjust before the next op session.

Jeff Shultz - MRH Technical Assistant
DCC Features Matrix My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington