railandsail

I'm getting ready to lay some of my staging area track down near my entrance way door swing bridge.

I'm taking a closer look at exactly what I might do for the most immediate gaps in the tracks. I've seen several new products introduced and I know at least one of those would not be applicable as they would not work with my 'sliding connection'.

A couple of days ago I considered placing 'rerailers' on either side of the track gaps.

This morning I thought how about placing the rerailer across the gap, then cut it in such a manner as to provide a stable gap??

(NOTE: I placed this discussion in a new subject thread as I felt there were many more ideas/ discussions / products that might be posted than just the singular application I had in mind.)

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Atlas Rerailers for the Gaps

Quote:
Rick Sutton

I used a rerailer across a problematic gap on my entrance swing up bridge and it really helped out. Used a jeweler's saw to cut it.

That was my thought as well,...BUT what about this thought?

Any derail will actually occur at the gap itself, and the rerailer thus cut will NOT be correcting matters. Rather the rerailer ends as designed need to be placed in the opposite direction to bring the derailed wheel(s) back onto the rails??

 

 

Reply 0
Rick Sutton

rerailer

For me the rerailer is not so much a solution for derailed wheels (which was not a problem) but for securing the rails against damage and being knocked out of gauge. In my small space when the bridge was down it was very easy to catch a sleeve on the raw rail ends and jerk them into oblivion. I got tired of the damage to both the track and often my arm. I tried glueing, soldering the track to circuit boards and nailing etc. with reasonable success but since installing the rerailer it is a problem solved. My hesitation to go with the rerailer earlier was its clunky appearance but with the application of some paint it effectively disappears.

Reply 0
Lancaster Central RR

Getting the track geometry right will prevent derailments.

Prevention is the answer. If the joint is out of alignment the train won’t track correctly even if you manage to get the wheels back on track. Especially the longer and more cars on the train.

Lancaster Central Railroad &

Philadelphia & Baltimore Central RR &

Lancaster, Oxford & Southern Transportation Co. 

Shawn H. , modeling 1980 in Lancaster county, PA - alternative history of local  railroads. 

Reply 0
Wazzzy

Securing rails at the gap

Securing rails at the gap location (swing bridge, lift out section, raise/lower section, etc) to prevent accidental "dislodging" from a human error (elbow bump, sleeve snag, etc) is a significant potential problem. 

What I did, FWIW, to secure the rails in place on my 4 lift out sections.

     1. Determine where the rails would lay across the gap, mark the location for both rails on the moving & stationary sections.

     2. Drill a pilot hole directly under each rail close to the gap location. 4 holes total per track gap location.

     3. Insert a flat head brass screw into the pilot hole (long enough to go through the roadbed / sub-roadbed) and adjust the height of the head to just barely touch the bottom of the rail when laid across the gap. Remove cross ties as needed to achieve proper tie spacing.

     4. Install the moving section and secure the track into its final resting place. Do not cut gaps in the rails at this time.

     5. Test the track by running trains. This is the fun part.

     6. Soldier the bottom of the rails to the brass screw. Test the track again. More fun.

     7. Cut your rail gaps.

     8. Install rail power feeds to the moveable section (many options to choose from)

The rails can not move in any direction and will remain gauged correctly. 

Alan Loizeaux

CEO Empire Trackworks  (Empire-Trackworks.com)

Modeling ON30 DRG

Husband, Father, Grandpa, Retired Military, Conductor / Yard Master Norfolk Southern, Owner Empire Trackworks (S, SN3, On3, On30, On2, HOn3, O 2-rail & others)

Reply 0
joef

Mechanical gaps vs electrical gaps

Mechanical gaps simply need some mechanical means to keep the rails in alignment. If the rail ends lightly touch, no big deal as long as there's no mechanical issues because of that. On electrical gaps, you never want those to accidentally close or the rail ends to ever touch, so they need something permanent in the gap that's an insulator such as some superglued styrene trimmed to the rail profile after the glue sets.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
Reply