jeffshultz

  Yep , I'm in Hartford too - only for a couple of days though, I leave again on Friday.

  I only got to Hartford at 5pm Tuesday evening - late enough that registration was closed and I was counting on my MRH polo shirt to reassure people I was supposed to be there when I went to a couple of clincs that evening.

 The first clinic, by Bill Estes, was on using retractable Ball Point Pen mechanisims as manual turnout controls. Kinda ugly, and not really applicable to my layout - but definitely fascinating in their simplicity and small size - the real interest in the clinic was in the different levers Bill used to tranform the simple in-out motion of the pen mechanism into whatever sort of motion he needed - since he installed them after-the-fact on an assembled module (a version of Bernie Kempinski's N Scale Bush Terminal design with 19 turnouts in a 2 foot by 1 foot area of a 4 foot  by 1 foot layout), he had to punch small holes through the layout next to the connecting tie and use a pivoting throwbar to move the points.

A photo of a demonstration version he assembled using an old HO Scale turnout:

_640x480.jpg 

The in-out motion of the ballpoint is converted into a pivoting motion of the throwbar - making for a tiny hole through the layout - which then throws the turnout. I may be using this sort of motion, although with a completetely different sort of mechanism, in the near future.

  The second clinic I went to was Styrene Scratchbuilding: Prototype Freight Cars by Richard Newmiller, MMR. It was a basic overview of the process, with tips on how to pick a good car (flat sides & ends good, compound curves bad) to scratchbuild, a bit on how to gather the information needed to create construction diagrams, and finally on how he used 4 Westerfield resin kits that he built to create his construction diagrams, using them to scratchbuild nearly identical cars. I've kind of had it in the back of my mind to scratchbuild some of the semi-modern ribside and welded-side woodchip gons that travel the WPRR on a regular basis, and I got some good ideas on what I might need to do to make that particular project a reality.

  The next morning (yesterday morning by my "It's after midnight?!?" POV) we were off to the Layout Design SIG layout tour. Les and Joe will also be blogging on this, so it was suggested that we pick a particular layout and avoid duplication of effort. Because Joe's batteries died on his camera at Don Irace's Providence & Worchester RR layout, I'm covering it - kind of ironic that a guy modeling the Willamette & Pacific RR (W&P RR) (which is now the Portland & Western RR (P & W RR) is blogging on a visit to another P & W RR.   It was featured in May or June 2009's Railroad Model Craftsman.
 In a nutshell - this layout is big. It's double or triple stacked over nearly all of it's length, with over 500 feet of mainline track in a true point-to-point configuration. There is no provision for continuous running on this layout. The two endpoints are actually right at the entrance, one above the other.

Top:

_640x480.jpg 
Bottom:

_640x480.jpg 

  Using tunnels and a lot of holes in the walls, the layout crosses beneath the stairs, through three other rooms (including the bathroom, AKA "Flushing") back into the original room, where it performs at least two or three twists through freestanding benchwork before diving into a helix (the smaller of two... I didn't get a clear idea what purpose the large one served) and returning back through essentially the same route on  a different level. 

  One point of pride that was made was that only one of the locomotives on the layout was not sound equipped. And when you see the locomotive yard... that's an impressive fact:

_640x480.jpg 
 

The layout is completely CTC'd via JMRI PanelPro:

_640x480.jpg 

...and that capability leads to a rather unique feature (at least I haven't heard of it elsewhere) of this layout: One of the layout's operator/dispatcher's moved to Atlanta, GA at some point in the semi-recent past, so the layout has been modified so that he can run the CTC system as well as (using some form of VoIP) talk to the operators via their Push-to-Talk walkie-talkies. Truly remote dispatching. Unfortunately that particular dispatcher was not participating in the op session that we were visiting during.

This, incidentally, is the big helix:

_640x480.jpg 

The "small" helix:

  http://www.youtube.com/watch?v=NBFLqoIewt0 (embedding didn't work right and the video (all 198mb of it) is still processing as I type this)

Anyway, it's 1:15am and way,  way, way past my bedtime. I shot something like 334 photos and videos today...

See you tomorrow!

 