Mike mayor79

Here is my blog thread documenting my overall layout construction.  The day after Christmas I finally started something I've been waiting a good 8 years to do.......my layout construction has finally begun!

I wont post the design again here but below is a link to the post in the layout database thread going on the design forum:  
https://forum.mrhmag.com/post/trackplan-database-have-you-posted-yours-12193458?pid=1331328782

I've been planning this since we bought our house 8 years ago, but the caviet was I had to finish the basement for the wife (and now the kids) before model railroad construction could begin.  Well, this past fall the basement was finished (except for the powder room since the wife cant pick a light and vanity yet.

The overall room is quite small (as you probably noticed if you checked out the trackplan in the database link).  Its meant to be a solo operation or with my son so small is fine with me.  Plus its achievable for me.  I painted the walls a sky blue color since that will act as the backdrop for the upper level.  The lower level will get painted hardboard to hide the shelf standards.  I have a black grid ceiling with dimmable lighting and a foam squares floor and its been pretty comfy so far.

Build pictures/descriptions coming.......

 

-Mike

-Mike

Modeling the Milwaukee Road Beer Line in the fall of 1965.

Reply 6
BNSFFAN

Nice progress

It's looking great so far. How is that duck under for you? No way I could do it with a bad knee.

Reply 0
Mike mayor79

Its not bad, I think its

Its not bad, I think its somewhere around 52" or so.  Its designed as a lift out section though, once all the track and electrical is in place I'll end up cutting it loose.

Reply 0
ctxmf74

  "Its designed as a lift

Quote:

"Its designed as a lift out section though, once all the track and electrical is in place I'll end up cutting it loose."

If you plan to make it removable in some manner I'd do it now and make sure everything works as planned before getting too far along. I changed my lift out to a lift up section after removing and replacing it a few times, I found it was harder to find a place to store the removable section then install it to run trains than it was to re-do it as a lift up so it's always ready to go just by lowering it...DaveB

Reply 0
Mike mayor79

I mis-spoke its 48" to the

I mis-spoke its 48" to the bottom of the lift out, and about 51" to the top of the rail.

I thought about a lift up or swing section but the room is so small it causes other space issues.  The lift out checked more of the boxes for me.

I've already made the lower level a lift out section and after tweaking the tracks a bit it run great.  Storage, once the construction is more complete, will be on a shelf under the layout to keep them out of the way and protected.  I'm envisioning the upper level staying in place most of the time since it will have some structures on it (removable though).  The lower level is just yard tracks with minimal scenery so its easier to remove.

Reply 0
Mike mayor79

All track is now installed

All track is now installed and work just started yesterday on the power bus for the upper level.  I ended up with about 8 pieces of scrap track each less than 6" long.  I'd love to claim it's perfect planning but I really backed into that luck.  Either way I'll take it!

Reply 0
Mike mayor79

Its been a long time since

Its been a long time since Ive posted an update here.  Lots has happened though…..

All of the upper level track is installed and feeders attached.  All of the switch controllers are in now, need to finish the wiring on them though.  I did get the LED lighting on the upper level installed though.  I bough some LED tape light from amazon and installed in on some lath strips that I split in half and attached to the fascia brackets.  The dimmer/switch is connected to my 12 volt power supply for the layout.

The install was pretty easy but as you can see from the picture above, the adhesive on the LED tape is pretty bad so I ended up zip-tieing them to the strips.  Holds pretty well.  The picture below shows the dimmer for the tape light, this will end up behind the upper level fascia.

As with any good layout, expansion has occurred before scenery even started.  

My plan initially was to just leave the space behind the ramp curves as dead space, which is what happened for two of them.  The one at the bottom of the ramp though is very visible.  I ended up removing the shelf bracket the was supporting the end of the ramp and filled the corner in with foam.  This will end up being the back of houses up against the lumber yard, which actually is exactly how the prototype was set up.  Should add some nice visual interest to the layout.

This afternoon I also installed the upper level fascia and the background fascia on the ramp.  Waiting on some glue to dry before I mud the seams and paint.

Reply 1
Mike mayor79

Quick Update

Havent been able to work on the layout too much the last few days since I painted the track (spray paint), and the fumes chase me out of the room for a day.  I did get the fascia cut to finally hide the waste pipe.  The sides are going to be painted sky blue and the front will end up gray to match the fascia.  Still needs a little trimming for a good fit.

Im laminating 1/8" hardboard to a foamcore backing, just for some added thickness without adding much weight.  I need to glue everything together still.  This will just be a pressure fit in the space so I can remove it if needed.

This weekend hopefully we're painting backdrops and fascia!

Reply 1
Nick Santo amsnick

@ Mike

You and I did very similar things with LED strips.  If it helps a dot of Loktite GOTO glue might work for you too.  The adhesive on the strips is holding pretty well on plastic j-molding used on drywalls.  On the ends where the heavy 14 gauge stranded wire is connected I needed a little more adhesion so the GOTO glue finished the job.

Nick

https://nixtrainz.com/ Home of the Decoder Buddy

Full disclosure: I am the inventor of the Decoder Buddy and I sell it via the link above.

Reply 0
Mike mayor79

Cool.  The tape light seems

Cool.  The tape light seems to be holding okay, especially with the zip ties but there are some spots where it's given away already.  I'll have to get some lock tite and try that.

The LEDs make a huge difference for the lower level though!

Reply 0
Mike mayor79

One Year Anniversary!

Today marks the one year anniversary of the Beer Line.  A lot has happened in the past year, hard to believe a year ago the room was more or less empty, and now there's a full layout in there.  I'm tempted to put together a slide show of pictures but for now here's the start and where we stand today!

Dec 26, 2019:

December 26, 2020:

 

 

Scenery has started, roads are beginning, and building mockups have begun.   There's 6 40 ft insulated boxcars waiting to be converted to URTX and DSDX and one H10-44 halfway thru detailing.  I'm starting work on the overpass at Humboldt yard, and waiting on some scenery materials to arrive so I can get started on the Humboldt area.

Its been an exciting for the layout (at least), looking forward to see what the next year brings.

Reply 2
Mike mayor79

North Ave Overpass Bridge

Working on the first structure for the beer line (though many others are in stages of planning/mockups).  Scenery is starting in the Humboldt yard/Tews area of the lower level.  Scenery here is mostly grungy yard tracks, the mainline right of way, and Tews Lime and Cement.  Basic scenery is dirt covered yard tracks and general dirt and gravel areas.  Not much for interesting or colorful scenery.  One of the more noticeable structures is the East North Ave Overpass that clips the end of Humboldt Yard.

After a bunch of research the closest available kit I was able to find was the Rix Products early highway overpass kit.  Its not perfect but its close enough for my liking.  The only issue is that while the highway deck looks pretty good, the supports and sub road deck structure isn’t even close.  So that means my first major scratch building project.

This was the start of the project, five Rix bridge kits and a bunch of styrene.

The kit goes together fairly easily, some minimal sanding is needed for tight fits but overall its pretty simply assembly.   With just the basic road deck its pretty flimsy though!  The concrete beams and side railings did stiffen things up

One thing I’m doing on this build is adding automated lighting in the form of street lamps and car headlights/taillights.  That means drilling out the railings for light poles as seen above.  I picked the poles up on Amazon, hopefully they work out.

I also have a few Classic Metal Works vehicles (a car, pickup and a stake bed truck) that will go on the bridge, each will have lighting added as well.  My son’s hotwheels cars in the picture above were placeholders to see if I liked the positioning.

The underside of the bridge is built up with concrete arch spans between the bridge piers, so the stock kit doesn’t cut it.  I picked up some styrene tube to simulate this.  I used a Dremel to rough-cut an arch in each one.  I lucked out and my garbage can shape (oval) was a perfect shape to act as a sanding guide!

This was how I left it last weekend, all the parts were cut and ready for assembly.  You can see the street light inserted into one of the holes drilled into the handrails.  The entire structure will get painted a more realistic concrete color.  A bunch of wiring is going to have to be pulled as well before final assembly can happen.

Reply 1
Mike mayor79

Bridge update

January has turned more into an electronics month as much as a modeling month.  Since the one year anniversary of completing the layout, though there are still “infrastructure” items to work on, Ive turned my attention more to scenery and structures.  A few building have been mocked up, and overall I decided, more out of convenience than anything to start the scenery at Humboldt yard.  That means one of the critical structure is East North Ave Overpass.  Which I started to show in my last post.

One of the things I want to do to this layout is introduce automation and animation.  For this portion of the layout what I decided to do was light the cars and street lights on the bridge.  But I didnt just want them on all the time, I wanted them to respond to the layout lighting.  Seems simple enough, but I think I tried to tackle a more complicated project as my "learning project.  Here comes learning Arduino:

The above pics are my breadboard session with the bridge lights (white LED’s) and the car headlights (blue LED’s) and tail lights (red LED’s).  it wasnt as hard as I thought, though I'm sure my sketch code is sloppier than it should be.  Basically I have a series of 'if' statements that respond to a photoresistor, one for streetlights and one for car lights.  Im planning on three cars on the bridge, as shown on the last post, each with headlights and tail lights, and roadway light poles.

The three cars ( a pickup closes to the layout edge, a stake bed truck in the middle, and a car at the far end) will all have headlights and tail lights.  The stake bed truck will have  photo-resistor buried in a barrel in the back.  That will control the street lights at one light level and the car lights at a different light level.

The pickup and stake bed truck are from Classic Metal Works, which ironically are all plastic and really easy to work with.  The headlights are clear plastic tubes like locomotives have, and the taillights were just drilling thru the car body.  The car however, from Oxford, was solid metal and required drilling out all four lights.  Fortunately the metal is relatively soft and it didnt take too long.  In the end the car was easier than the two trucks!

All the vehicles have been weathered (doesnt show up as well in photos, at least with my camera phone), and wired to leads that will go below the layout to an Arduino nano.  The street light poles have also been wired up and ready for connection.  All I’m waiting for now is a shipment from Model Train Stuff that includes oil barrels for the back of the stake bed truck, which is where the photoresistor will hide.

Once everything is done I’ll take a video and share!

Cant wait, this has been a month long project, but just the start of the automation on the layout!

Reply 1
Mike mayor79

Last big bridge update

This afternoon I managed to finish the bridge!  Yes! 

I had a box arrive from Model Train Stuff this week with the last pieces I needed for the bridge......along with parts for Tews Lime and Cement!  The bridge pieces were barrels for the stake bed truck.  A load doesnt seam important but that is how I'm hiding the photoresistor for the lighting controls.  you  can see it in the image below of the oil barrels in back of the truck (its the one with the red squiggle across it).

The rest of the pictures just show how the wiring routes thru the roadway, under the bridge and down the supports.  The center support was the worst since it has not only the lights for the stake bed truck but also the ticker wire for the photoresistor.  Everything fit fairly well, just had to slowly work the wiring down the supports.  The bridge is temporarily set in place, it needs final adjustment still and one yard track needs to be shortened due to where the piers landed.

Next step is getting the base scenery down around the yard and getting the bridge more permanently set with wiring run thru the layout.  Next up is wiring an Arduino nano to a thruhole board with the resistors and terminals for the wiring up to the bridge.

Here's the bridge more or less in its final place for now.

And one last shot, overall E North Ave Overpass crossing Humboldt yard, and Tews Lime and Cement in the planning phases.  Now that the bridge is built I'm turning my focus to this area.  The cardboard is the rough shape of the main building (yes it will have an interior),  everything else is still in flux right now.

Reply 2
Mike mayor79

Completed bridge

The bridge is finally done!  Figures after pulling all the wires and hooking everything up for one last test I discovered hat 6 LEDs were out!  Spent the better part of a day carefully taking this apart and replacing LEDs.  Everything is working now though.

Base scenery is down for this corner (ballast is actually drying right now on the main and in the Tews area).  Once everything is dry the bridge will be final fitted into place.

I have been working on the permeant controller for everything.  I ended up mounting an Arduino Nano on perf board with the resistors and screw terminals for all the wiring.  This way I can disconnect everything without soldering under the layout if I ever need to remove the bridge.  Didnt turn out too bad for my first time soldering circuit components!

The ballast and ground cover was done enough this evening to install the bridge.  Its not completely attached but the wiring has all been pulled thru the layout.  Everything fits nice, just needs some scenery adjustment around the pier bases, and of course the arduino connected under the layout.

(yes I know a few light pole are leaning, they'll be fixed before the bridge is finished)

Reply 2
Trainman129

Arduino project

Once you get your Arduino programmed, how about posting your code? I'm curious how you make it work.

Reply 0
Mike mayor79

In the spirit of Arduino

In the spirit of Arduino being open source, below is the code I used for the overpass.  The light levels in the if sequences were edited to the lighting conditions in my layout room (I actually ended up getting a bigger gap between them), so if you copy the code make sure you test for your lighting conditions.

 

//Milwaukee Road Beer Line
//E North Ave Overpass bridge light and car light sketch
//photoresistor values edited for layout conditions February 11, 2021
//Created January 7, 2021
//2021 Michael Daley

int photocell = A4;         // the photocell and 10k pulldown are connected to A4
int lightlevel;
int streetlight1 = 2;       // street light pole closes to layout edge  150 ohm resistor
int streetlight2 = 3;       // street light pole closes to layout edge  150 ohm resistor
int streetlight3 = 4;       // street light pole closes to bridge center  150 ohm resistor
int streetlight4 = 5;       // street light pole closes to brodge cemter  150 ohm resistor
int streetlight5 = 6;       // street light pole closes to layout back  150 ohm resistor
int streetlight6 = 7;       // street light pole closes to layout back  150 ohm resistor
int pickupred = 8;          // pickup truck tail lights  470 ohm resistor in parallel
int pickupwhite=9;          // pickup truck head lights  100 ohm resistor in parallel
int truckred=10;            //stake truck tail lights  470 ohm resistor in parallel
int truckwhite=11;          //stake truck head lights  100 ohm resistor in parallel
int carred=12;              //car tail lights  470 ohm resistor in parallel
int carwhite=A1;            //car head lights  100 ohm resistor in parallel

void setup() {
  // put your setup code here, to run once:
  pinMode(streetlight1, OUTPUT);
  pinMode(streetlight2, OUTPUT);
  pinMode(streetlight3, OUTPUT);
  pinMode(streetlight4, OUTPUT);
  pinMode(streetlight5, OUTPUT);
  pinMode(streetlight6, OUTPUT);
  pinMode(pickupred, OUTPUT);
  pinMode(pickupwhite, OUTPUT);
  pinMode(truckred, OUTPUT);
  pinMode(truckwhite, OUTPUT);
  pinMode(carred, OUTPUT);
  pinMode(carwhite, OUTPUT);
    
  Serial.begin(9600);

   //this forces all lights off when the layout is powered up
  digitalWrite(streetlight1, LOW);
  digitalWrite(streetlight2, LOW);
  digitalWrite(streetlight3, LOW);
  digitalWrite(streetlight4, LOW);
  digitalWrite(streetlight5, LOW);
  digitalWrite(streetlight6, LOW);
  digitalWrite(pickupred, LOW);
  digitalWrite(pickupwhite, LOW);
  digitalWrite(truckred, LOW);
  digitalWrite(truckwhite, LOW);
  digitalWrite(carred, LOW);
  digitalWrite(carwhite, LOW);

}

void loop() {
  // put your main code here, to run repeatedly:
  lightlevel = analogRead(photocell);
  Serial.print("Light Reading");
  Serial.println(lightlevel);
  delay(1500);

if (lightlevel < 625){                    //sequence for starting streetlights only
  Serial.print("Street Lights");
  digitalWrite(streetlight1, HIGH);
  digitalWrite(streetlight2, HIGH);
  digitalWrite(streetlight3, HIGH);
  digitalWrite(streetlight4, HIGH);
  digitalWrite(streetlight5, HIGH);
  digitalWrite(streetlight6, HIGH);

if (lightlevel < 350){                   //sequence for starting car and truck lights
  Serial.print("Car Lights");
  digitalWrite(pickupred, HIGH);
  digitalWrite(pickupwhite, HIGH);
  digitalWrite(truckred, HIGH);
  digitalWrite(truckwhite, HIGH);
  digitalWrite(carred, HIGH);
  digitalWrite(carwhite, HIGH);
}
}

else if (lightlevel> 630){              //this turns off all lights if layout lights go above 630
  delay(30000);
  digitalWrite(streetlight1, LOW);
  digitalWrite(streetlight2, LOW);
  digitalWrite(streetlight3, LOW);
  digitalWrite(streetlight4, LOW);
  digitalWrite(streetlight5, LOW);
  digitalWrite(streetlight6, LOW);
  digitalWrite(pickupred, LOW);
  digitalWrite(pickupwhite, LOW);
  digitalWrite(truckred, LOW);
  digitalWrite(truckwhite, LOW);
  digitalWrite(carred, LOW);
  digitalWrite(carwhite, LOW);
  }

}

Reply 1
Mike mayor79

Start of the Neighborhood

I've turned my focus to the neighborhood on the lower level for the time being.  All together there will be seven houses in this section of the layout, with the tracks running behind the houses.   Last fall (I think) I bought  bunch of Walthers Bungalows and 2 story houses to populate the neighborhood.  These were pretty common in Milwaukee (still are).

Started working on the first house last weekend, they're pretty simple kit to assemble, getting the colors mixed was the most time consuming part.  Still have a little assembly to do, and I want to get some more color on the bricks.  For this and a few other houses I wanted to try and simulate the cream city brick that was so common in Milwaukee, the others will have more typical red brick.

Continuing my theme of lighting automation the entire neighborhood is going to have lighting affects in each house.  The interior was split up into "rooms" with styrene (basement, 4 rooms on the first floor, and 2 on the upper floor) that will each have an LED.  I may try and do a simulated TV flicker in some houses too.  Each house is going to run off of an arduino under the layout.  I have larger plans to link them all together to respond to a photocell and play sounds at some point (kids playing during daytime, and subtle car sounds, crickets, etc at nite)  Thats down the road though.

Reply 2
Mike mayor79

More or less finished the

More or less finished the base house tonite.  Mixed up some dull yellow to paint some bricks to look like cream city bricks.  Put the porch together except for the handrails by the stairs.  Roofs arent glued on since lights need to be installed still, but it looks finished when mocked up.

3 more bungalows and 3 more 2 story houses to go.........

Reply 1
Mike mayor79

Minor update

Been slowly working on the neighborhood the last few weeks when I manage some free time.  Also putting ballast and basic ground cover down in the Humboldt yard area.  The neighborhood grew another building though, and foundations are in for a third!

 

Still need to work on the lighting effects.  I've been messing around with random lighting sequences on an arduino.  I'm starting to get it figured out but I'm going to end up complicating it quite a bit.  Each house will have a nano to run lighting in each house.  I'm also planning on having an arduino running street lights in the neighborhood, sound effects for daytime and nite time, and have this arduino send out photocell levels to the houses via I2C communication to run different random lighting effects!  I may have jumped in the deep end here.  Gonna be fun though.

Reply 1
jimfitch

Nice looking bungalow.  What

Nice looking bungalow.  What kind of beer is the beer line serving?

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
Mike mayor79

Thanks. The biggest brewery

Thanks.

The biggest brewery on the line was Schlitz which occupies almost half of the upper level.  Pabst also received incoming hops and shipped out finished beer.  Blatz was the smallest brewery customer which shipped beer out of team tracks on the very end of the line.

Reply 0
Mike mayor79

Neighborhood update

Alright, the beer line homebuilder company is closing up shop.  I'm getting tired of building these kits!  LOL   The neighborhood is shaping up, we're up to 7 houses now, five bungalows with the most recent addition.  I still have one more to go (the cardboard outline in front of the gray house in the picture below), but I need a break for a while.  

The bungalow at the left below is the newest addition.  Need to fit the interior walls in, finish the dormer and get the lights installed but its more or less done.  This one turned out okay in the end, my airbrush broke so I ended up carefully brush painting it.  I was pretty worried how it would turn out but now that its built you cant really tell.

The bright red brick walls in the background is an old IHC kit that will end up being an apartment background flat.  Just like the prototype there was an apartment building behind these houses, almost as a buffer before the businesses started. 

The cardboard mock-up to the left of the brick wall panels is going to become the Capitol Liquors distribution center building.  The prototype is still standing in Milwaukee, though now its home to a BBQ place along with a few other small businesses.  I cant find any great prototype pictures from the 60's but the track diagrams seem to suggest it could only accommodate one car at a time, which is good because that's all I can fit!  LOL

I'm getting pretty tired of building houses, need to do something "railroad" related again so yesterday the track crew showed up and laid down ballast along another 3ft or so of mainline.

(Yup, rule G is suspended for the track crews as well as the engineers!  LOL  )

The ballast should be dry enough tonite to start running trains again.

While I'm waiting on some electronics to arrive for the lighting/sound effects in the neighborhood I think I'm going to focus some time on paving a few more roads and getting more track ballasted.

 

Reply 1
Monkeybucket

Plenty of electrickery going

Plenty of electrickery going on here...cheers for the updates...looking forward to more scenery hitting the layout...

Reply 0
Mike mayor79

It was waaay to hot and humid

It was waaay to hot and humid it Chicago last weekend to do much outside.  We did spend the day at my borther-in-law's pool but Sunday was spend in the train room!

Finished up painting and attaching the roads around the neighborhood and the the industries on the lower level.  This was the one thing keeping me from getting more ballast down.  I made these following Steve S. "Modeling Asphalt Roads" blog post on MRH.  I think they turned out pretty good, though not as nice as his.  They need some final touch-ups (cracks, sewer covers, striping, etc) but they allow me to work on more scenery.

Reply 1
Mike mayor79

More Trackwork

Busy weekend planned starting later this afternoon so not much time to work on the layout.  But its a good opportunity for ballast to dry for the next few days.  Got another 6ish feet of mainline done, the visible portion of the ramp to the upper level as well as the sections around Locust St and Chambers Ave.  

Wife's out of town next weekend, hoping to get some more work done on the layout!

Reply 1
Reply