railandsail

I'm designing a new double-deck layout to fit inside my 12x16 'train shed'.  It will have an 'outdoor' helix structure,... outside the main shed, but in its own enclosure.
%2C%20ps.jpg 

It will have shelf's on either side, and a peninsula. For the longest time I had been planning for a 6-8 track staging area to be located approx 8" under ONE of the side shelfs,...perhaps like this

Edited: removed an old track plan as it is way out of date, and replaced it with this newer version,..
s%281%29.jpg 
 

 

I decided to re-look at the possibility of utilizing the helix structure to gain access to the the staging tracks. What if I decided to try to add two loops to the bottom of my planned outdoor helix to take the trains down to the staging level?
 

And now I could have staging tracks on both sides of the layout  I could even have staging down the center of the peninsula. Lets see 6 tracks each on both sides, and 2-4 down the center,...wow, 14-16 tracks of staging (each with a different type train ready to run)

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Track Plan

First off fellows let me admit to you that I have never really been able to interpret, nor draw up those 'layout characterization plans' (or do you term them schematics) that ones sees on the control panels of model RR and likely in the control rooms of real railroads.

So let me go back to a few drawings of my plan I have posted earlier to see if I can make you understand what I am planning. Plus I will sit down with some color pencils to further assist any misunderstanding.

The basic overall plan was suggested by another gentleman on the forum,...
 

Balloon Loops at Helix End of Layout

To clarify, I am concentrating at this time on the helix end of the layout, and the associated balloon loops of the double track mains,....

(NOTE: NOT the rest of the layout, NOR tracks other than the mainlines, and NOT the 'configuration' of the mainlines in the other portions of the layout, and NOT the staging subdeck, nor helix tracks leading to that subdeck)

 

Quote:

As Dave has posted,...

The layout would be two laps of double track around the room , one on each level (lower deck, upper deck). At the bump out one end on each level would go into a balloon loop, and the other end would go into a double track helix.

Since its a glorified dogbone, once the trains are speed matched, they can run forever around the loop. Since it's a dogbone, every train will appear to operate in both directions, so I could constantly have the trains passing each other.

With only a double track main around the room, the benchwork can be as wide or as narrow as I liked. It will leave a lot of room for scenery or buildings.

The balloon loops would go above and below the helix track, (BE notes: but inside the same 'external housing' I will build for the helix)

Quote:

LOWER DECK
In this particular first iteration, the balloon loop is shown in a blue color, and it is a simple level loop of track that connects the 2 mainlines running down the left side of the layout. Note there is also one turnout on this loop that feeds a track running to the center peninsula (similar to the original Tupper Lake design)

On the other side (right side) of the layout these 2 mainlines become elevated to subsequently fly over some tracks below, and to enter their double-track helix phase. Note here there is a track bearing off of one of these mainlines that subsequently joins back into the one of the mainlines on the left side. This track will provide for an 'escape' for a train to avoid the helix, and simply run continuously around the lower level.
ix%20end.jpg 

UPPER DECK
The upper deck is generally about 20” above the lower deck. It's balloon loop here is shown in red. It was purposefully brought back thru that shed back wall as far to the left as possible so it might have good 'exposed' track on the interior for a 'reason' (undefined at this moment). It also is provide with a 'connection track' so that trains might avoid the helix, and run continuously around this top level.

Note that 2 mainline tracks arrive to this top deck at a 16” high height, then rise up to the 20” height of the top level in general. (this is no longer the case as the tracks rise up one more loop, another 4" to meet the the upper deck. And the very top balloon loop is higher to clear this)

ix%20end.jpg 

Note: The drawing  for that Lower Deck was made prior to the idea of any loops of track going down to any staging below the lower deck. As such this 'balloon loop' for the lower deck occupied the single outer radius track in the helix. Subsequently when I decided to add a track down to the subterranean staging, I made that staging access track the outer track in the helix and moved the balloon loop to the inner circle of track,...double tracked helix now. The track feeding that spiral down to staging (not shown here) was squeezed in just along side the left hand side of that dwg,..... between the two mainlines and the side of the shed.

Could this overall plan be called 2 glorified dog bones, one on the lower deck, and one on the upper deck. And both of them have 'escape tracks' that led back into themselves thus being just loops around the room, so as to potentially escape having to use the helix each time?

No reverse loops that I see here, but I am concerned about the double crossovers I introduced later.

Reply 0
railandsail

Helix Spiral

Does this help visualize the different levels??
 

Quote:


For those having a little problem visualizing my multideck spiral within the helix structure, here is another view....
(that “B” is for 'balloon loop')

img.png 
 

Reply 0
anteaum2666

Three AR Sections

Hi Brian,

As I think I've noted before, cool plan and cool project.  I'm enjoying watching the build.

Staging
If I understand everything correctly, I believe you have three AR Sections.  The first is the loops in staging we have discussed.  I would put them all on one AR as previously recommended.

Lower Level
The electrical reversing section on the Lower Level is shown below highlighted in red.  I think that's probably too short for your longest train, so I'd wire that, plus the area highlighted in green, on one PSX-AR.  If that's not longer than your longest train, simply extend the section down the left wall. 

This also has the advantage that everything on this level beyond the shed wall is powered by the AR, which will help with troubleshooting

anBottom.jpg 

Upper Level
The upper level electrical reversing section is shown below.  If you use the same method, everything in the shed is wired on a PSX-AR.  This section should be long enough for your longest train, but if not, just extend it down the right wall.

BrianTop.jpg 

So that's three reversing sections, requiring three PSX-AR's.  Also, I noticed a turntable on your plan, so that's an AR section all by itself.  So four in total, including the turntable.

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
railandsail

4 AR's,...at least

I kind of figured I was going to need at least 4 AR's,....lucky I just found them from a private seller, and they are the brand you recommended. They are in the mail.

I'm kind of color blind so I am having just a bit of a problem making out your diagram, But that is not so important at the moment as I need to get some track laid in that helix area. I'll come back to this layout wiring at another future date. I really appreciate your interest in helping me.

Reply 0
railandsail

Finally cutting plywood decks

Quote:

So this was my original 'mock up' of some of my staging tracks,...

First I had to assembly all of the Peco mediums together in a firm manner so they could be moved around as a group in that pinwheel ladder configuration. Then I went searching for how I could make them line up correctly with the shelf I was planning down each side. I found I could now get 6 tracks down the side in a14" depth shelf, with a 2 1/8" center between tracks.
DSCF3291.JPG 

 

DSCF3292.JPG 

 

DSCF3293.JPG 

None of the connecting tracks are less than 24" radi.

Then I went to mocking up the center peninsula staging that includes 6 more tracks on a 13 inch wide shelf located under the 24" peninsula main deck above it.

All thet urnouts in these photos are Peco mediums
 

DSCF3294.JPG 

 

DSCF3296.JPG 

Then I drew in a proposed curve line that would represent the outer edge of the staging track shelf in the area of the pinwheel ladder.
DSCF3298.JPG 

 

I'm hoping to rig up some 'fixtures' mounted on that strip of shelf just outside of the turnouts that will allow a cable type manual operation of the individual turnouts, ie, wire within a plastic tube that would come up to a small panel mounted of the front face of the main deck's edge at the front of the aisle.

 

So yesterday I began to cut my plywood decks for the staging areas. Going to cut all of them, align and fit them together, drill holes for bolts that will bond them to the steel box frames mounted on the walls. Then I will remove the wood decks and drill all the countersink holes, then paint/waterproof those plywood deck pieces and set them aside for a little while till I drill the location holes for the main deck bolts just above staging tracks. 

After the main deck bolt holes are located, those sheets will be removed to the outside and painted/sealed. While those are drying I will be laying track onto the staging decks. 

It feels good to finally be cutting and placing the decks into place,...INSIDE the shed.

DSCF4129.jpg 

 

DSCF4133.jpg 

 

DSCF4136.jpg 

 

DSCF4137.jpg 

 

DSCF4135.jpg 

 

 

Reply 0
railandsail

Turnout Controls for those Staging Area Turnouts

I've been working on the track plans and structure locations on those 2 upper decks for a long time now,...and just ignoring this staging area. Well its coming time to pull off some of those upper deck plywoods and lay the staging tracks below. But before I pulled them out I wanted to firm up how I was going to control those 18 turnouts I have  on those 6+6+6 staging tracks down under there.

I went back and thought about those Peco PL10 solenoid controls, but began to question putting those big round holes in some portions of those rather narrow plywood arms that reach into the central 3 way,....weakening that deck board too much. And do I really need this sort of control on many of those staging tracks that may only be selected seldomly.

Lets go back to the manual control idea,  something like this,...
https://forum.mrhmag.com/post/multiple-staging-areas-access-to-them-perhaps-subloop-in-the-helix-12209513
But wait a minute a lot of those control cables will interfere with reaching any derailments of the staging turnout ladders.

Then I began to experiment with locating bell-cranks for each of those turnouts at the deck's edge,....but then again, a possible mess of cables and lots of little bell cranks, studs, screws etc to install.  Experiment....
85448-1.jpeg 

 

Finally I began to think of how I might just move some sort of manual controls I might have put back there on the curved edge of the plywood deck,...move them out toward the aisle. The idea of just mildly curved metal rods running between the ends of the Peco throw ties and square tube 'panel' ,.... the white tube here with guide holes in it for those rods that will run to the turnouts.

90454-2.jpeg 
(those multiple white strips laying across the top are just there for photo purposes to indicate the route of the eventual metal control rods)

90602-3.jpeg 

What I like about this configuration:
a) plenty of room to get back to derailments without having to fumble thru some sort of control rod jumble
b) removable in case of need


The view from the top,..(photo is deceiving as that 'control bar' is  totally recessed under that corner edge of the upper deck)
91635-4.jpeg 

 



91708-5.jpeg 

 

I have not finished wiring up the turnouts yet as I have yet to pull off the upper deck and lay down the tracks/turnouts for these staging tracks. It will be pretty simple to attached this 'fixture' to the plywood of the staging decks, then place the control rods in place.

BTW, note that those control rods line up pretty well with the ends of the Peco throw ties,...and I think I have a nice simple method to connect the rods with the throw ties.

 

 

Reply 0
railandsail

Other Side

I did a similar little bracket affair for the other side of the staging tracks. This one is not recessed under the upper deck overhead as much as that previous side. For that reason the very last turnout in the ladder does not require a cable/rod control,...but rather is just within fingers reach.
82451-1.jpeg 

 

 

easy access for any derails...
82609-2.jpeg 

 

Per my mention previously both of these brackets are totally under that main deck overhead even while som photos make them look like they are projecting outwardly,...

right had side
82951-3.jpeg 

left hand side
83040-4.jpeg 

Reply 0
railandsail

Center Peninsula Staging Turnout Controls

I've decided the manual control of those turnouts down underneath the center peninsula is just going to be a pain in the butt.
 

So I am going to utilize the Peco PL10 solenoids on them,...why not since I will have to utilize a pair of them on that remote Peco 3-way that controls the entry to all three of the staging areas.

 

 

Reply 0
eastwind

why not

Because solenoids make a lot of noise and burn out? And old, used solenoids burn out faster? Plus they can be harder on the turnouts?

How many are you talking about? If you want to minimize crawling under the layout, pay for tortoises. But its your money and your back, knees and head. 

 

You can call me EW. Here's my blog index

Reply 0
railandsail

Atlas & Peco solenoids

On my first layout I used almost exclusively Atlas turnouts with their stock solenoids, and built my own CD (capacitor discharge) units. Never had to replace any of them.
Central Midland layout     https://forum.mrhmag.com/post/the-central-midland-layout-by-john-armstrong-atlas-plan-29-12207702

On this new layout I am using almost exclusively Peco turnouts. I like a lot of things about them,...including their positive spring action. 

Tortoise controls practically require that you remove the stock springs of the Peco, so that made me less fond of them.  I am also not to fond of the amount they stick down below the deck subroadbed. (I am looking to have nice storage under those staging decks on my layout).

I've not heard any real bonafided negatives about the solenoids on those Peco turnouts,...they appear to be quite robust. And they will fit nicely within that hole in my 3/4" thick plywood deck,...flush.
 

I have plenty of both those Peco ones and plenty of Tortoise ones, so its not a question of purchasing either of them. Most of my turnouts are close enough to the edge of the aisles that they will be operated manually. Even some of the others that are a far reach will be operated with a cable arrangement.

Right now I have 5 turnouts in the center section of staging that will get those solenoids, and the 3-way turnout that feeds the 3 staging tracks. Plus there is a long Y up on my stone arch bridge that will likely get the solenoid treatment. I think all of those can be powered with a single CD unit, particulary since they will not have to be operated concurrently.

Reply 0
railandsail

Power Routing Feature to Depower Staging Tracks

Power Routing Feature to Depower Staging Tracks

The thought occurred to me the other day that I could use that power routing feature of the insulfrog turnouts to depower selective tracks in my staging areas,...without having to introduce separate switches to do it.?

If I were to select that singular turnout at the head of the ladder it would power that outer track only, and depower all the other 5 tracks on that side. Subsequently if I chose to let it power the other 5, then I could limit it to the track that I chose the turnout for.

On each individual staging tracks I thought I might wire it so that the first 2 feet was controlled by the turnout itself rather than being wired into the normal multiple DCC feeder situation. (let see did I say that correctly?).


If one recalls I foresee backing most of my trains into the staging tracks,...that puts the locos sitting not far from the turnouts themselves,....on an insulated section of track controlled by the turnout.

 3 zones.jpg 


DSCF3288.JPG 

 

DSCF3292.JPG 

 

DSCF3294.JPG 

Reply 0
railandsail

Laying Switches/Tracks in Staging Areas

Track laying has started !!

Per my original plans I pretty much knew I was going to have to start my permanent track laying with the very bottom of my decks,...the staging level.  I have 3 big areas, ....all 8" under the main deck above them. My original thoughts were that I would remove the overhead plywood deck sections to have clear access to the staging decks.

But wait a minute, somethings have changed. Why remove the huge main deck plywood deck that contains the turntable, roundhouse, and arch bridge structures?  My staging deck plywoods are removable, and relocatable for working on. I cleared off my main deck areas so I could put the staging decks up there for working on them.

91919-2.jpeg 

 

91949-3.jpeg 

 

92023-4.jpeg 

Reply 0
railandsail

Center Peninsula Staging Turnout Controls

Ok, started laying out the center staging area. Decided I did NOT want to drill those big holes in the plywood deck to accommodate the PL10 solenoids,...but rather going to a manual operation via rods and bell-cranks.

12406-1.jpeg 

 

On all of my staging tracks I am utilizing truss-headed screws to hold the track in place,...much like I did in the helix area to attach the tracks to the masonite roadbed.

The bell cranks and their support surfaces are fashioned from my PVC plastic materials. I made the one arm of the bell cranks extra long in order that the rod control arm would have to move a 'considerable length' rather than the very short distance to activate the Peco turnout.
13054-2.jpeg 

 

13154-3.jpeg 

 

I debated turning the 'hook of the rod' either up or down where it attaches to the bell-crank, .....but chose down to try and eliminate any 'snags' during track cleaning operations.

 

 

Reply 0
railandsail

the other side of central staging tracks

My new manual operation of staging tracks under the central peninsula was finished up with these 3 rod/bell-crank installations. They had to be offset around that square metal piece that represents a vertical support beam of the central decks under the layout.

Keep in mind that these staging tracks are not accessed that often,...only when selecting another train to run around the layout. So having their controls on 2 different sides of the peninsula is not that much of an inconvenience.
 

70731-1.jpeg 

 

70821-2.jpeg 

Reply 0
railandsail

Sagging in 'bridging' portion

Got my center area finished, and my left hand side finished. So yesterday I decided to tackle the right hand side, but first I noticed a slight sag the deck portion that stretched between the center over to the side. I think this may have resulted from the deck piece having set for months in that location WITHOUT and bolts holding it down firmly to the metal support beams,...so it developed a slight bend in the middle,...denoted by circle in this photo



Actually I had anticipated the possible that these longer bridging areas might develop some sagging. My thoughts were that it could easily be corrected (assisted) by some sort of hanging support from the main deck above (rather than anything blocking up that wonderful clear space below). So today I will fashion a support for the area.

 

 

Reply 0
railandsail

My original idea for laying

My original idea for laying track in my 3 staging areas was that I would remove the main decks directly over them for clear access to those staging decks. Subsequently I modified that plan a little bit. I decided I would NOT remove the main decks in the back portion of the shed,...the ones that will eventually contain the turntable, the round house, the power station, the coke plant, and most of the arch bridge structures.

Rather I would leave them in place, then pull the staging decks out from under the main decks and bring them up top to work on. In the past several postings I have shown how I bought the central peninsula and the left hand sections up. I even took that left hand section outdoors to make room for doing my right hand section indoors,...
 80923-1.jpeg 

 

 

...the right hand section brought up top and set on temporary foam blocks,..ready for track laying
81142-2.jpeg 

81229-3.jpeg 

 

These staging sections will be put back in place and bolted down once I have cut my hole in the main deck for the turntable (lots of sawdust I would like to keep out of the staging tracks)
 

Oh, and I almost forgot. I need to drill the multiple holes for my DCC feeder wires and solder them in place before I put them back underneath.

 

 

Reply 0
railandsail

Front of Shed Deck Areas

I'm still trying to decide how I will do the staging track sections up in the 2 corners of the shed,...the ones under the steel mill on the left hand side, and under the waterfront scene on the right hand side. I likely will be removing those overhead decks for 2 reasons,..1) easier access to the staging tracks back deep under those corners, 2) more ready access to laying the tracks and switches in the rear corners of those main decks themselves. I'll unbolt the main deck plywoods and bring them out from the walls into the center of the room, or bring them outdoors to my work bench. This will allow access to the staging decks underneath, AND make laying the tracks/switches for the main decks easier.

Reply 0
railandsail

Wiring up my staging tracks

 A final check up to clarify things if you would please??

I believe my final question comes down to where to place the insulating joints for the staging area reversing loops,....before the 3-way entrance turnout, or in the tracks exiting that 3-way??

I went back to this page of the discussions, https://model-railroad-hobbyist.com/node/32990?page=16   and noted this quote,...
 

Quote:

I've based my comments on the diagram shown below.  As I understand it, the 3-Way switch feeds the loop tracks in the staging yard.  You would gap where the red lines are shown.  The ENTIRE yard, highlighted in yellow, would be fed through ONE PSX-AR.  When required, the AR would switch the polarity on the entire yard, highlighted in yellow.  The polarity on the rest of the layout, including the Helix, would NEVER change.  Only the yard fed through the AR.

https://forum.mrhmag.com/post/multiple-staging-areas-access-to-them-perhaps-subloop-in-the-helix-12209513
Michael A

-650x849.jpg 

I like this idea that the entire staging areas (all 3 sections, all staging tracks) would be controlled by the one AR. And if this were the case why wouldn't I place the  start of the reversing section (insulated jointers) just prior to the 3-way switch, rather than on those two legs leading off the 3-way reaching over to the wall sides??

I do understand that my central peninsula staging tracks don't need a reverser, but why complicate things by wiring them to helix buses, when they also could be wired to this one primary bus system hooked to the AR?

I also appreciate the short circuit potentials of trains entering either end of a reversing section simultaneously, but I don't think I would have such a problem, for 2 reasons,..1) my helix itself is not a reversing section (only my staging tracks are), ....and 2) even if it was wired in such a manner, this single track access to my staging areas would NOT be selected to have a train coming up from staging, while simultaneously sending a train down to staging.

 

Then my other question here is what wiring questions should I be concerned about with including (or not including) the Peco 3-way turnout in-side the reversing section/loop?

 

 

 

Reply 0
railandsail

Staging Bus Entity

two more quotes that reinforce this idea of a staging bus entity....

Quote:

If it were me, I'd put insulated rail joiners in the single track sections between the Wye and the two ladders for the outer staging loops.  (see below)  Then power the entire staging yard through the AR.  This would make the entire staging loop one big reversing section.  The whole thing would reverse polarity when necessary, but this wouldn't hurt a thing.

Michael A

 

Quote:

Yes, you would create a separate bus underneath the loop and connect feeders from that bus to the loop. To power that separate bus you connect the output of your reverser to it, and the input of the reverser gets connected to your regular layout power bus.

-Yaron.

 

 

 

Reply 0
ACR_Forever

trace your outside rail all the way around the staging loop.

If you incorporate the 3-way in your reversing section, you've directly connected the left rail to the right rail.  You must gap after the 3-way.

Blair

Reply 0
railandsail

@Blair

I believe I see what you are saying,...I would create a potential short across the 2 entry tracks belonging to the 3-way switch by having the continuous looping bus wires,.. wired directly into the 3-way's diverging tracks.?

I guess what I was imaging was that the double insulation joiners at the entry to the 3-way switch would counter this? I think I see where I was wrong now,...warned you I was electrically challenged.....ha..ha

So now what do I do about the central staging area that originates off the central leg of the 3-way,...that has NO reversing loop(s) ?

 



 

 

 

 

Reply 0
ACR_Forever

Exactly as

Michael A marked up the drawing (above).  Gap both rails of the left and right diverging routes of the 3-way, and feed that entire yard from your reverser.  Leave the 3-way, and the yard it's straight route feeds, fed normally.  Unless there's more to it (I admit, I've not been reading the thread recently), that's what you need to do.

Blair

Reply 0
railandsail

Center Staging Tracks

That would seem to be a little strange to route that helix bus wire down the central staging tracks while using a different bus wire for the other sides,...not impossible, just strange.

I had thought that if I could get ALL of the staging tracks on the same bus wire, I could rig a single power switch to shut off all staging tracks (and locos stored there), until I was ready to withdraw a train from staging,...then power them up only when needed??

 

PS: Couldn't I just treat that central portion just like one of the side portions,...wire its bus wires in series with one of the sides,...and provide the double insulated jointers at its entrance track??

 

 

 

 

Reply 0
railandsail

Access to staging decks, etc

Being able to remove those staging deck sections has been a really good thing,...nor only for laying track on those decks but also for some work on the underside of the main deck in those areas.


https://forum.mrhmag.com/post/multiple-staging-areas-access-to-them-perhaps-subloop-in-the-helix-12209513

I can actually get one of my small rolling chairs under there to accomplish multiple task, including the routeing of the hole for the turntable, plywood joint plates, additional bolting, wiring and mounting LED lights, etc.  I have 3 different chairs that I can utilize thru out the layout. Sure has saved wear and tear on my back, and knees,...being able to roll around under there.
02046-1.jpeg 

02122-2.jpeg 

 

02156-3.jpeg 

 

Reply 0
ACR_Forever

Brian,

I replied earlier to your question, but I may have been edited by one of the gods. 

Yes, that central yard can be fed from the reverser if you must, it's just not necessary.  Up to you.

Blair

Reply 0
Reply