First ever blog entry! Thought I'd share since its using steel stud and track, a method that occasionally comes up but I haven't seen it much used for a shelf layout. Generally the details of construction are pretty thin in discussions too.
Just to set the stage. This will be my second layout since getting back into the hobby as an adult. The first was last year; a typical 4x8' double track roundy round with a small yard and a couple industry spurs.
The pros and cons of this format have been thoroughly covered with cons including inefficient use of space, limited ops, not prototypical, chasing a caboose is boring, etc. I found these all to be true. For the space I had it actually was perfect: an area of unfinished basement with steel industrial shelving on both walls and an open unused space in the middle. Continuous run was important as I thought the kids would want that (just like a boxed train set!). We had a lot of fun building it. We got to an operational level of completion and was a great learning platform for us (myself and young sons). Basic benchwork, track laying, electrical, and a bit of scenery plus we learned what we really did and didn't have want in a layout. Continuous run is only a "nice to have" as it turns out and the kids like low speed switching!
Then it came time to finish the basement into living space for other reasons so the layout had to go. I listed it for sale over the winter and a nice fella bought it for a few bucks. No regrets as it was a great experience and good to see someone else get use out of it rather than chainsaw it.
Flash to present day. Time to get another layout built, but not in the basement. We are close to final agreement on right of way for use of a nice long wall in a living room/playroom about 16' or so including one door. Pretty decent shelf layout location. Still noodling on track layout and need to clear out the furniture that's currently taking the space but the space dictates the footprint so we started construction on some modules. A big lesson from the roundy round was that I want to move away from traditional wood frame construction. The roundy was massively overbuilt with 2x4s and thick plywood. Metal studs are stable, cheap, and easy to work with. General opinion seems to be positive from people who actually use them so I gave it a try.
Approach is to use metal track and studs, then hardboard for added rigidity and sound dampening, topped with extruded foam board. We did a small mockup that worked out well so we made a few adjustments (pop rivets for joining up framing, gorilla glue for attaching frame to hardboard and hardboard to foam board). Still considering fascia material but likely hardboard
I rough cut the hardboard and foam board a bit larger than the metal base and can fit it up more closely with a belt sander. Production module is scaled up From the proof of concept unit to a 6' length. It's quite sturdy feeling and very light weight. Looking forward to seeing how it does in the phases to come and need to figure out best module attachment method
jeff
—————————————
“Think before you post, try to be positive, and you do not always have to give your opinion.....”
-Bessemer Bob