This summer N scale modelers from around the world set up the world's biggest layout in Louisville, KY. The Derby City Express, as it was called, featured a layout of staggering proportions. The exact details can be found here, http://web.mac.com/pauljdowns/2008_N_Scale_Convention/Home.html , but the numbers that I heard at the show were about 700 modules, spread across 50,000 square feet with roughly 100 scale miles of mainline. A run around the layout took about 3 hours.
I participated in the layout as part of the C&O Mountain oNeTRAK subdivision along with Brian Brendel, his son Jake, Matt and Georgia Schaefer. We also brought Jeff Peck's modules, but he and his son, Christian, normally C&O Mountain Sub stalwarts, could not attend.
This was the second big national show to which we brought the C&O Mountain Subdivision. The first was the NMRA National Show in Philly in 2006. For the Derby City Express we brought about double the number of modules. This was probably the limit that three able bodied men and a boy can handle.
We hauled the modules in a rental U-Haul trailer towed behind a Chevy Tahoe. Jake and Steve Jackson, who drove his vehicle in a caravan with us, are finishing up the loading in the photo above. The photo shows the modules stacked like cord wood in the trailer. The round trip totaled 1200 miles. We burned 100 gallons of gas at the peak of the summer gas price spike. In spite of the seemingly haphazard loading and the long trip, our modules made it there and back with only a few spots requiring touch up.
As this was the premiere showing for a couple of our modules, some debugging was in order. But we had things running in the first day. Once the main layout DCC electrical system was sorted out, a constant parade of trains ran through. Gordon Bliss from Houston TX, who by the way has an exceptional, very large double deck N Scale railroad at home, was the first train through the C&O oNeTRAK Mountain sub. Here he is holding the throttle to his Sante Fe Chief as it traverses the Maxey's Farm on the oNeTRAK Mountain Sub.
We have no real idea how many trains passed through, but it had to be several hundred including some very long coal drags and autorack trains. Someone reported that there were over 80 trains running on the main through line simultaneously.
The folks at Digitrax were present in full force and helped set up and debug this monumental effort. They along with the convention staff really did a super job. Not just for the layout, but for the rest of the convention too. Unfortunately, we were so busy with the layout, we didn't have time to participate in any of the regular convention activities, except for the hospitality suite that is 
Here is Brian posing by the C&O Mountain Sub. In the background you can see part of the rest of the layout.
This is an overhead shot of my Afton module showing one of the many trains passing through. Note how this long train extends across four curves and two tunnels.
One of the things I enjoy about modular railroading is the opportunity to meet others interested in the hobby. During the public show I had the pleasure to meet literally hundreds of folk that stopped by the Mountain Sub to say hello. It really was a blast.
We did learn some lessons from the show. It really pays to test all your modules before going to the show. We had some untested modules in this set-up and they caused a small amount of consternation as we did their final fitting out.
On the positive side, we adopted a uniform fascia color and skirting design, which really tied out modules together even though we had different scenery approaches and styles. We learned that the tighter curves of the C&O mountain sub did not appreciably hurt the operation. We had several long trains snaking through our subdivision without too much difficulty.
Even though we have reached a practical limit for what we can haul ourselves, we are still thinking about building more modules. Steve Clarson from Cincinnati N Scale Engineers is in the process of building some more Mountain sub modules including a Charlottesville Yard, possibly with help from some of his other club members. Jeff Peck is thinking about a second yard for the west end. With these two yards we could run in a point to point manner and not be restricted to an oval configuration. We'll see how this transpires.