bkempins

 This summer N scale modelers from around the world set up the world's biggest layout in Louisville, KY. The Derby City Express, as it was called, featured a layout of staggering proportions. The exact details can be found here,  http://web.mac.com/pauljdowns/2008_N_Scale_Convention/Home.html , but the numbers that I heard at the show were about 700 modules, spread across 50,000 square feet with roughly 100 scale miles of mainline. A run around the layout took about 3 hours. 

I participated in the layout as part of the C&O Mountain oNeTRAK subdivision along with Brian Brendel, his son Jake, Matt and Georgia Schaefer. We also brought Jeff Peck's modules, but he and his son, Christian, normally C&O Mountain Sub stalwarts, could not attend.

This was the second big national show to which we brought the C&O Mountain Subdivision. The first was the NMRA National Show in Philly in 2006.  For the Derby City Express we brought about double the number of modules. This was probably the limit that three able bodied men and a boy can handle. 

ow200801.jpg 

We hauled the modules in a rental U-Haul trailer towed behind a Chevy Tahoe.  Jake and Steve Jackson, who drove his vehicle in a caravan with us, are finishing up the loading in the photo above.  The photo shows the modules stacked like cord wood in the trailer. The round trip totaled 1200 miles. We burned 100 gallons of gas at the peak of the summer gas price spike.   In spite of the seemingly haphazard loading and the long trip, our modules made it there and back with only a few spots requiring touch up.

As this was the premiere showing for a couple of our modules, some debugging was in order. But we had things running in the first day. Once the main layout DCC electrical system was sorted out, a constant parade of trains ran through. Gordon Bliss from Houston TX, who by the way has an exceptional, very large double deck N Scale railroad at home,  was the first train through the C&O oNeTRAK Mountain sub. Here he is holding the throttle to his Sante Fe Chief as it traverses the Maxey's Farm on the oNeTRAK Mountain Sub. 

200810_0.jpg 

We have no real idea how many trains passed through, but it had to be several hundred including some very long coal drags and autorack trains. Someone reported that there were over 80 trains running on the main through line simultaneously.

The folks at Digitrax were present in full force and helped set up and debug this monumental effort. They along with the convention staff really did a super job. Not just for the layout, but for the rest of the convention too. Unfortunately, we were so busy with the layout, we didn't have time to participate in any of the regular convention activities, except for the hospitality suite that is

ow200823.jpg 

Here is Brian posing by the C&O Mountain Sub. In the background you can see part of the rest of the layout.

200822_0.jpg This is an overhead shot of my Afton module showing one of the many trains passing through. Note how this long train extends across four curves and two tunnels.

One of the things I enjoy about modular railroading is the opportunity to meet others interested in the hobby. During the public show I had the pleasure to meet literally hundreds of folk that stopped by the Mountain Sub to say hello. It really was a blast.

We did learn some lessons from the show. It really pays to test all your modules before going to the show. We had some untested modules in this set-up and they caused a small amount of consternation as we did their final fitting out.

On the positive side, we adopted a uniform fascia color and skirting design, which really tied out modules together even though we had different scenery approaches and styles. We learned that the tighter curves of the C&O mountain sub did not appreciably hurt the operation. We had several long trains snaking through our subdivision without too much difficulty.

Even though we have reached a practical limit for what we can haul ourselves, we are still thinking about building more modules. Steve Clarson from Cincinnati N Scale Engineers is in the process of building some more Mountain sub modules including a Charlottesville Yard, possibly with help from some of his other club members.  Jeff Peck is thinking about a second yard for the west end. With these two yards we could run in a point to point manner and not be restricted to an oval configuration. We'll see how this transpires. 

Bernard Kempinski

​
 
Personal Layout Blog: http://usmrr.blogspot.com/
Reply 0
ChrisNH

Great Stuff!

Those are some great looking modules.. I hope I can get to a show like that sometime soon!

I always thought onetrak had a lot of potential. I was never fond of the triple track aspect of ntrak modules. I think your uniform facia color really helps to tie it together, too.

My only issue with modular standards is the low height but I understand that for purposes of shows you have to be able to accomodate kids. Still, it would be interesting how adults would react to seeing trains at eye level at a show..

Anyway, great work! I hope you post more here about that modular layout. Its great stuff and I would like to see more done with onetrak!

Chris

“If you carry your childhood with you, you never become older.”           My modest progress Blog

Reply 0
Dustin

What Radius Are Those Curves?

Very nice modules! You mentioned tight radius curves. What radii did you use on the Mountain Sub? In particular, what is the approx radius of the mainline in the last picture with the coal drag? (The curve furthest to the left in the pic with the truck crossing the highway). I'm just trying to get an idea what some radii look like... esp. once it is sceniked etc.

Thanks,

 

Dustin

Reply 0
bkempins

18 inch minimum radius

The minimum radius we use is 18 inches. The radius under the road bridge at Afton is about 24 inches. Here are some photos taken when I was first laying out the curve. You can see the roadbed without the surrounding scenery. 

I used the bent stick method to layout the track center lines. 

ntStickW.jpg usCurveW.jpg 

 

verviewW.jpg 

 

 

 Here it is ready for track.

forTrack.jpg 

 

Here a 1530, a H-5, 2-6-6-2 Mallet negotiates the 24 inch radius at Afton.estBound.jpg 

 

Bernard Kempinski

​
 
Personal Layout Blog: http://usmrr.blogspot.com/
Reply 0
joef

Nothing like before and after photos

Boy, I sure like before and after photos ... they show how simple techniques can give you some killer results!

That last photo of the Mallet is a dandy ... gotta love Photoshop smoke - sure adds some realistic drama to the scene!

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
jeffshultz

The Digitrax people mentioned this meet during their user forum.

Some of the Digitrax stuff you were using was their prototype 2.4Ghz duplex radio system.

They seemed pretty pleased with how it went.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Dave K skiloff

Very Cool!

I've been granted some "lease" space in the basement of our new house and was planning a double deck N scale layout, but now I'm really thinking the oNeTRAK modules might be the way to go, at least on the lower level and have some sort of transition to the upper level.  We have a lot of space in the basement, but I can't use it all for permanent layouts, but building modules, I could set it up, run some trains, then pack it back up into my "lease" space.  Now I've got some thinking to do.  Thanks for more inspiration.

Dave
Playing around in HO and N scale since 1976

Reply 0
Marty McGuirk

Photoshop??? the smoke is

Photoshop??? the smoke is from Photoshop?? that's cool  . . . Having seen Bernie's wiring I'd figured it was the factory-installed smoke coming out of the decoder . . .  

Marty McGuirk, Gainesville, VA

http://www.centralvermontrailway.blogspot.com

 

Reply 0
feldman718

Setting up and and packing up modules

When I first got into model railroading in 1977 I got the idea that I could build a nice layout on a 4 x 8 sheet of plywood and have it fit into our modest sized two bedroom garden apartment. I had that 4 x 8 cut into four 2 x 4 sections which I would join together to form a 4 x 8. Now this didn't go on the floor but ona table I would open and set up in the middle of our living room. Now it seemed like a good idea at the time but it usually took a few hours to set up the boards and then put the trains and buildings on the layout before I could run a single train. So I would run trains for an hour or two and then I was faced with packing up the trains and buildings, taking the sections apart and packing them away where they wouldn't be in the way. In effect I had to have a whole day available to for this and it is one of the reasons I got out of HO Scale and moved to N-Scale.

So your idea of making One Track modules and putting them together to run trains and taking then packing them up afterwards may take more time than it is worth and may prove detrimental to running trains.

I belong to an N-TraK club. We have to take our modules down to bring them to shows and set them up. Our shows usually last a day or two before we have to dismantle the layout to bring them back to our club room and tehn set them up again or pack those modules we can't fit into our club layout away. It is a big job and needs any number of members to help out. It is not easy and it does take time to get everthing running and connected correctly.

So please think long and hard about doing what you propose.

In my opinion, it would be better to start with something smaller that doesn't have to unpacked and packed every time you want to run trains.

Irv

Reply 0
bkempins

Factory Smoke

Ouch, criticism from McGuirk on my wiring! This coming from a guy whose engineering professors offered to let him pass "Introduction to EE" only if he promised to switch majors and never take another EE course.

I might be an mechanical engineer, but I know enough about electronics to know that you can only let the factory smoke out of a electronic component once.

tsWiring.jpg 

Nonetheless,  I am always amazed out how complex two wires can become in model railroading. This is a shot of an actual model RR wiring.

Bernard Kempinski

​
 
Personal Layout Blog: http://usmrr.blogspot.com/
Reply 0
Dave K skiloff

Thanks for your input

Thank you for providing me with some reality checks.  Its always good to have the voice of reason and experience. 

After thinking about it for the last few days and now reading your comments, I think perhaps what I could do is have my "lease" area that would have a good chunk of the railroad set up that I could run trains without having to do anything else if I so chose.  However, I could build a number of modules that I could set up and extend the existing layout for special occasions and could also take these along to clubs or shows if I so wanted. 

My schedule is such that I work away from home for a week and then am home for a week, so as long as my wife had no plans for that extra space, I could set it up when I get home and have it for the week before packing it back up.  I can certainly understand getting tired of setting it up and packing it away all the time, but as long as I had a relatively permanent operation, I think I could have the best of both worlds.  Now I just have to come up with a plan...

Dave
Playing around in HO and N scale since 1976

Reply 0
bkempins

Temporary set ups

One thing to consider, just because you have set up modules as a layout, does not mean you need to take them down after every use. If you have the "land  grant" for a layout,  go ahead and leave the modules set up. I have set up modules in my basement for months on end. My current layout actually includes module sections as part of the main layout. 

ckdrop1a.jpg 

In this photo, I have modules set up in my studio, aka TV room.  

Bernard Kempinski

​
 
Personal Layout Blog: http://usmrr.blogspot.com/
Reply 0
Toniwryan

Ugh! broken photo links

Is it just me and my internet today, or are half of the photos in this thread broken?

 

Toni

Reply 0
joef

Fixed

These are 7 year-old threads with broken photo links - in this case, easy to fix because the MRH photo DB link location was slightly different - so they're now fixed.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
dperry

Not fixed...

Still some brokenness on both page 1 and 2.

Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 0
joef

Are they all fixed now?

Okay, did we get all the photos, finally?

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
jeffshultz

Sadly, no.

http://model-railroad-hobbyist.com/sites/default/files/users/bkempins/24inchRadiusCurveW.jpg and following on the first page come up as 404. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
joef

How about now?

Okay, how about now ... did we get them all?

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
jeffshultz

All good!

I see nothing broken now. 

Thanks! 

If nothing else.... this has inspired me to get my photos organized, which is helped by the fact that Google apparently uploaded them all at some point in the past. Creepy, but useful. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Reply