Ivan I

It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
kcsphil1
Man, I go away for a couple week son vacation, and one of my favorite modern era N scale layout builders starts posting again.  Talk about inspiration.  

Welcome back @Ivan I - though technically I guess you never left.

Philip H. Chief Everything Officer Baton Rouge Southern Railroad, Mount Rainier Div.

"You can't just "Field of Dreams" it... not matter how James Earl Jones your voice is..." ~ my wife

My Blog Index

Reply 2
Ivan I
Hi Phil! I guess it wasn't much of a comeback. I took some time off from working on the layout for about 8 months while I put my efforts towards other interests and goals. However, like a good boomerang, this hobby has a way of finding its way back into my life. Since it has been a year with the new layout configuration and no track plan update, I decided to sit down and update the documentation. Here's where we stand with the track plan:
TrackPlan3.png

When I last posted, I was working on making the roadways leading up to the bridge in Module B. I continued by adding a "scenic base" to the ground between the roads and the tracks with a mixture of tinted grout and some fine grain sand. This added some texture to the area and established a nice canvas for future applications of ground cover. 
20220712_160126.jpg

Then I ballasted the tracks on the grade:
20220712_204223.jpg
20220713_215851.jpg
Reply 5
Ivan I
Continuing progress on the same tracks, I started working on the section leading up to the bridge on Module B. I drilled holes for the leads that provide the bridge sections with track power into the concrete pilings:, and followed up with the respective holes in the layout:
20220713_162311.jpg
20220713_181011.jpg
 
Then I ballasted the tracks and glued the section down to the layout:
20220713_222630.jpg
20220714_012244.jpg
 
While the glue was drying topside, I went under the layout and added a separate track power / DCC bus to for the bridge section in Module B. The whole section will be powered through an auto reversing circuit, seen in the photo below:
20220713_232355.jpg
 
While I was under there, I finally printed an enclosure for my raspberry pi that runs the layout and hosts a JMRI webserver. Things look a lot neater with the case installed.
20220719_204145.jpg
Reply 6
Ivan I
Continuing with the trend of making marginal improvements to the underside of the layout, I picked up some fancy 6:2 wire connectors and used them to consolidate some of the wiring on the underside of the yard in Module A. The main benefit of this was how easy it is to disconnect sections of track to troubleshoot shorts - I ended up doing this when I tried turning on the layout and it went into short protection. Turns out I had a loose piece of solder bridging one of the hard tracks.
20220719_204135.jpg

I also continued building up the road surfaces in Module B, since this is best done in many thin layers to avoid cracking. I tried making changes in the road surface gradual and natural feeling, as sudden grade changes and embankments are something that I find distracting on other layouts.
20220714_100415.jpg

I glued track to the roadbed of the single track bridge assembly. The bridges themselves are still loosely assembled, as I plan to add details and paint before gluing everything together. 
20220719_232314.jpg

Overall I'm pretty happy with how things are looking, especially with the progress I'm making on the scenery in Module B.
20220721_175521.jpg
Reply 9
Joe Circus
Welcome back!
Reply 3
DaleMierzwik
Ivan,
your wiring is amazingly neat and organized!! That is one part of the hobby I struggle with and really dislike. Great job.
I wonder if you could share your colors used on your water? I am working on a water scene now and I really like what you have going on for color.

Dale


Reply 3
Ivan I
Ivan,
your wiring is amazingly neat and organized!! That is one part of the hobby I struggle with and really dislike. Great job.
I wonder if you could share your colors used on your water? I am working on a water scene now and I really like what you have going on for color.
Thanks Dale! I have a mix of the following Valejo Model Color paints, in varying concentrations:
 - White 70.951
 - Dark Blue 70.930
 - Black 70.950
 - Flat Green 70.968
 - Green Sky 70.974
Reply 3
Ivan I
Continuing with the scenery progress, I added some fine woodland scenics ground cover to give the areas around the bay some more texture and color.
20230326_000256.jpg
 
I followed this up with a loose application of foliage foam and some finer material to simulate thin grass. I used some pastel weathering powders to mark a dirt access road.
20230326_210646.jpg
20230326_222919.jpg
Reply 15
kcsphil1
Well now - the wait was worth it.  I'm digging that bridge build.  And your corner road is well executed.

Philip H. Chief Everything Officer Baton Rouge Southern Railroad, Mount Rainier Div.

"You can't just "Field of Dreams" it... not matter how James Earl Jones your voice is..." ~ my wife

My Blog Index

Reply 2
Ivan I
Another year, another post. I've been working on the layout on and off, making progress in bursts. Here are some photos to catch you up on the progress.
Across the canal in the last update, I raised the road surface up to the level of the grade crossing and simulated the scenery that I'd eventually put in that area - a parking lot for the marina and the Chowder Barge:
20230329_005522.jpg
20230329_180823.jpg
 
I cleaned up the area and then applied a base of tinted grout to serve as the parking lot surface:
20230329_233449.jpg
Reply 8
Ivan I
While the scenery was drying, I tackled a modification that I had been mulling over since the last time I moved the layout. My current lease was coming to an end and another move was imminent, and I thought it might be time to downsize the layout. That's right, I was going to purposefully make it smaller! During the last move, I found things a bit heavy and bulky, and even hanging in my living room for two years, the layout proportions seemed a bit off. I had also run into issues with the hidden tracks close proximity to the wall the layout hung from, make it very tedious to clean the track or re-rail trains that inevitably derail. To that effect, I decided to remove the hidden return loop and remove 1.5 inches from the back of each module to make it protrude into the room less:
20230320_181243.jpg
 
Since the modification removed the back side of the module base, I replaced the previously wooden bus wire mounts with 3d printed mounts:
20230327_161756.jpg

I made the changes to Module C since it didn't have any structures, scenery or electronics mounted in it. I also decided to remove some height from the valance and the height of the module/fascia, removing about 2 inches of "non-layout" height. At this point I also decided to redo the way I attach the backdrop, module bases, and valances together. Previously I used three 4"wide pieces of 3/8" plywood, which were glued and screwed to the module bottom, top, and backdrop. This resulted in a rather flexible module that had to be transported as a single assembly. I decided to use 3d printed brackets that slid onto 2020 extruded aluminum bars to replace the plywood.
20230328_110620.jpg
20230327_161822.jpg
20230327_161831.jpg
Reply 7
Ivan I
I also took some time to print some knobs for the connecting bolts that hold the modules together. The goal with these was to remove the amount of tools necessary to take the modules apart. Parts were printed in ASA and are quite strong:
20230329_223550.jpg
 
At this point I was able to hang the modified Module C to visualize how much space I was gaining with my modifications in the last post.
20230328_202115.jpg
20230328_202139.jpg
20230328_202157.jpg
 
Overall I'm very happy with how things are looking - There is a minimal loss in space for trains and scenery, but the rest of the layout has a more slim and streamlined look, drawing more attention to the modeling area with a smaller fascia and background area. The extruded aluminum + 3d printed mounting solution is much stiffer and helps keep everything from sagging under its own weight, and I'm hoping the easy of assembly/disassembly will help with the upcoming move. Now I just need to do the modification to the rest of the modules.
Reply 12
Reg Hearn Rhearn4
I am so glad there are no moves in my future...
Reg
Reply 5
Ivan I
I am so glad there are no moves in my future...
I feel like they're just a fact of life for me (and many others who don't own their home/apartment) - In hindsight, moves are great for thinning out the accumulated junk, and using lessons learned from the last living situation to improve your next one, but they are quite stressful in the moment.

Speaking of lessons learned, the grout mix I put down in the marina parking lot dried into a crackly, bumpy mess. Instead of figuring out what I did wrong, I scraped it off and just used what I already knew worked: a thin layer of sheetrock putty. Once it dried, I applied a thin layer of grey/black dye and some tan and grey ballast around the edges:
20230331_093707.jpg
 
The rest of the progress was made in slimming down the other modules in the layout. Module A with the yard was pretty straightforward, though I did have to carve out a channel in the roadbed foam to put in the return loop of the "hidden tracks" that used to run behind the backdrop.
20230416_204704.jpg
 
The curved corner module was a bit less straightforward - I had to move a bit of the track coming up the ramp to the bridges in Module B to fit the new, smaller radius of the corner module. I was never really satisfied with the curved wooden bits that made up the back walls of the corner module so I opted to 3d print them out of PETG. I added integrated channels for aluminum extrusions and mounting points for the wire organizing bits:
20230516_175706.jpg
20230516_222154.jpg
20230517_123126.jpg
20230517_123724.jpg
Reply 5
Ivan I
The most complex module to slim down was Module B, mostly due to the existing scenic features. I had to carefully cut off the back 1.5 inches using a combination of circular saw and Japanese pull saws - I didn't feel like ruining my circular saw blade with the combination of wood-plaster-nails-rocks-cork in the channel structure. You can see the 3d printed guide I made for the circular saw to make it easier to do the repeated cuts across all of the modules.
20230521_171806.jpg
20230521_175734.jpg
 
I glued the back panel after making some cuts to accommodate the channel cutout and carved out some space for a masonite panel to seal off the back of the channel. This area needed to be epoxy-tite for when I eventually do the water pour.
20230522_190104.jpg
 
With that finished, the layout was back together, for the last time in this apartment. I personally really enjoy the newer, slimmer profile. It just seems more proportional with the shorter fascia panels, and the shorter height of the backdrop panel directs the viewer's focus to the small details close to the ground (pretty much everything in n-scale falls into this category)
20230527_225419.jpg
20230527_225450.jpg
Reply 6
Ivan I
The move wasn't that long - only about 7 miles from one end of Boston to another, but it took all day. I had spent quite a few hours modeling the new apartment in CAD so I knew exactly where things would go. The model railroad was fated to live in the third bedroom, which is also going to be my workshop. None of the other rooms had a continuous run of wall long enough to support the layout, and the workshop (although possibly dusty) was a logical place for it.
20230603_192359.jpg
 
I mounted the layout above my worktables using a 3d printed French cleat style mount. The top surface where the models run is almost 6 feet off the ground to provide clearance over the workbenches for my big head. This wasn't ideal, but nothing that a small stepstool couldn't solve. I actually prefer the higher mounting location since it gives a more realistic, lower vantage point of the trains and scenery that is tough to encourage in N-Scale.

I spent a lot of time working on house projects so the layout sat idle for the better part of the year. I finally got around to updating the reversing loop section of the end modules:
20240603_210916.jpg
 
Then I knocked together some curved end modules from lighter plywood to round out the appearance of the layout.
20240604_180519.jpg
20240604_181621.jpg
20240604_214001.jpg
Reply 3
Ivan I
After seeing all of the modules assembled for the first time in this layouts (almost 10 year!) history, I finished up the new track work in the end module. First I tested the new, tighter radius of the loop with some of my largest rolling stock and locomotives to ensure things would run smoothly.
20240606_153513.jpg
20240606_155934.jpg
 
I filled in the old channel with some plaster/newspaper mix and then painted the tracks
20240607_160617.jpg
20240607_184019.jpg
Reply 7
Ivan I
Over the years of working on the layout, I had always struggled with the concept of a backdrop. At one point I considered painting a monotonic blue sky and then adding some light fading towards the horizon, but I could never find an appropriate color of blue to start out with. Then I pivoted towards a printed backdrop, using images I found in Google Earth and Streetview and stitched together in Photoshop. This ended up being tricky, since the photos were distorted, had lens flare and other aberrations, and didn't always match up very well. The most success I had using this method was with the oil refinery located behind my bridge scene in Module B:
bridgeSample.png
 
While working on another project, I recently had the opportunity to try out the Photoshop generative AI feature, which creates (reasonably) realistic images based on a text prompt and adjusts them to seamlessly fit into an existing scene. It took a few hours of finessing the prompts and selecting the appropriate base images in google streetview, but the end result looked good enough to test print. I would start with several base images as shown inside the orange rectangles, and then had the AI generate scenes to fill in the gaps between them. The seed images were laid out at specific distances in order to coincide with the industries and geographic features of those parts of the module. If you look close enough, you'll see the details are a bit blurry and some of the shapes/structures don't quite make sense, but this level of accuracy is perfectly suited for a backdrop.
Screenshot 2024-09-01 153713.jpg
Screenshot 2024-09-01 153758.jpgScreenshot 2024-09-01 153833.jpg
 
I printed out the image onto 9"x14" legal sheets on my home printer and then carefully trimmed them to size and used spray adhesive to glue them to the masonite backdrop. I did make a few mistakes in alignment so there were some wrinkles, but I can confidently say that it is a significant improvement over what was there beforehand.
20240606_112528.jpg20240606_112515.jpg
 
The layout is slowly starting to resemble the miniature world that I had first envisioned when I started.
Reply 10
RedDogF5
That looks awesome!
Reply 1
Ivan I
That looks awesome!
Thank you! I'm really happy with the backdrop - After making the changes, I spent a lot of time just running trains in the yard and enjoying the scenery, even in its rudimentary state.

With that said, I did have a few scenery improvements in the pipeline. First, I needed to redo the track running along the back of Module A (used to be hidden, now connects reversing loop to the twin bridges in Module B). It runs the full length of the module and is at a slight incline as it comes from below the roadbed (to hide the track s from view) and meets up with the grade leading up to the bridges. I chose to 3d model the ramp and print it out overnight instead of doing it by hand, since I didn't feel like messing around with the angles and easement so far back in the module.
20240606_104129.jpg20240606_113811.jpg
 
With the ramp glued in place, I decided to try my hand at making sidewalks. This process would need to be repeated a lot in this layout, as almost half of the surface area is a paved road. I used two layers of gaffers tape to mask off the road surface, then cut the shape of the sidewalk into the tape and slightly into the existing road. This would help make a nice, crisp edge for the curb. I applied more sheetrock compound with a sharp, thin putty knife and let everything tack up before removing the tape.
20240606_201910.jpg20240606_203521.jpg20240606_211111.jpg
 
I think the sidewalks will be more prominent once I color the road surface and add some concrete details and weathering. I find it tough to strike a good balance between having things done to scale, while still remaining visible as recognizable features in a scene - a lot of commercially available solutions for lights/roadways/signs are just too big/bulky and break any hope of having a plausibly realistic scene.  
Reply 9
Ivan I
I switched back to Module A to continue working on more ground cover and scenery. I brought up some street view photos on my ipad to help me mimic the grass/weeds typical around that area of the port:
20240609_222627.jpg20240610_002745.jpg
 
While I was in that area, I spread out some ballast and sand/dirt in the yard tracks. I've come to enjoy the process of ballasting, though I'm still a bit impatient when it comes to waiting for the glue to dry.
20240619_144730.jpg20240619_175944.jpg
 
I had recently gotten my hands on a handheld Dymo label printer with a set of different colored label spools. One of them was white on a clear background so I figured I'd try to make some rudimentary decals for the SW1200 I had repainted and detailed a few years ago. I started just by printing out the numbers, but those turned out well enough that I also added the PHL markings.
20240821_145018.jpg20240821_145413.jpg20240821_145435.jpg
 
There's no arguing that proper waterslide decals would be better - but I haven't bothered finding the PHL font, let alone making the designs and ordering them from an online service. These will do just fine for the time being. I will not add any dulcote or clear covering since I want them to be easily removable when I do finally get the real decals, so I'll just have to squint my eyes and pretend the stickers aren't glossy. At least now I know what number to pull up on my throttle when I want to run the switcher.
Reply 11
Ivan I
Looking back at the past few years of progress posts, I noticed that I tend to jump around a lot with that I'm working on. Part of that is likely my undiagnosed ADD, but it's also due to the fact that I'm only working on the layout for a few hours at a time once or twice a week. I also don't have any sort of deadlines or goals for the layout, so I don't feel pressure to finish one thing or another - I just work on whatever strikes my fancy that day.  

This past summer, I got a computer controlled embroidery machine and decided to make my first project a PHL patch. It took me a few days to digitize the design, and then about 45 minutes to do the actual embroidery with all of the manual color changes.
20240618_114439.jpg20240618_155235.jpg
 
There is definitely plenty of room for improvement - I didn't use any backing or pull compensation so the fabric moved around and stretched a bit as the design was being embroidered causing gaps in the final design. Still, I'm happy enough to have it hanging on the door to the layout room.
Reply 13
Thom
Ivan~,
                   Absolutely stellar construction, modeling, and I'm a fan of your backdrops. This is one great and fun thread to read through. I'm thinking of starting a small shelf diorama early next year and your backdrops just gave me the industrial theme I want to par-take in brother. Thanks! 👍
                                                                                                                                                                                                                                                                                     Thanx Thom...
Reply 4
Ivan I
Ivan~,
                   Absolutely stellar construction, modeling, and I'm a fan of your backdrops. This is one great and fun thread to read through. I'm thinking of starting a small shelf diorama early next year and your backdrops just gave me the industrial theme I want to par-take in brother. Thanks! 👍
                                                                                                                                                                                                                                                                                     Thanx Thom...
Thank you Thom! I definitely could do a better job of documenting my changes in a timely manner (instead of once a year) but I'm both glad and humbled you could take some inspiration from what I've posted.

At this point I'm more or less caught up to within a week of where the layout is in terms of progress. One of my recent changes was an upgrade of the layout electronics. I had been running everything with a NCE Powercab, JMRI on a Raspberry Pi 3, with turnout control accomplished using several of Mr. Bunza's SMA20 decoders running modified arduino code. There were several things that bothered me with the setup:
- The RPi would take a noticeable amount of time to start up and launch all of the servers necessary for JMRI to operate the layout
- A short anywhere in the layout would take all modules offline and reset the turnout controllers (without updating JRMI states)
- I never really used the NCE throttle, but it would still need to be plugged in to power everything
 - I felt dirty hardcoding the turnout settings into each turnout controller
- Sending turnout, signaling, and other non-locomotive information over DCC/tracks seems silly

With all of these shortcomings, I made a few upgrades - I replaced the NCE Powercab with a TCS CS-105. I 3d printed a set of mounts that allowed me to mount the enclosure to the underside of the layout:
20240822_084835.jpg
 
I also replaced the RPi3 with an RPi5 that boots and runs from a NVMe PCIe SSD instead of a SD card. This combo reduces the issue that people see with SD Cards failing in RPis, and also allows me to turn the layout on an run a train via WiThrottle within 25 seconds of flipping the power switch.
20240826_141020.jpg
 
I reorganized the mounting of the components underneath Module B:
20240826_144337.jpg

I also added a PSXX Circuit Breaker board to each module to isolate any shorts that occur from affecting the rest of the layout. I was a bit surprised by how massive these things are, compared to something like the Tam Valley Dual Frog Juicer. I printed mounts that would allow me to screw the boards to the underside of the modules.
20240828_085308.jpg20240827_212359.jpg
 
I also added a Dual Frog Juicer in autoreverse mode underneath the reverse loop section of the end module - this used to be in Module B, supplying power to the double truss bridge tracks, but it makes more sense in that section of track now that I've removed any sort of "reversed" section in Modules A and B. I'll probably add an electrical diagram to explain this later.
20240822_181105.jpg
 
I also have a few ideas about replacing/phasing out my DIY turnout controllers to something that works with LCC and has both servo and frog juicing contained on one PCB. I plan to post more info on this and opening the design up for others to make their own once I'm sure it works as I want it to, but here's a quick sneak peek at the board:
Screenshot 2024-09-03 212000.jpg
Reply 8
Ivan I
I revisited the corner module and removed the experimental grout mix ground cover base I had put in about a year ago. It was quite easy to chip off, which was one of the reasons I was removing it.
20240823_094745.jpg20240823_100215.jpg
 
I replaced it with the same mix of woodland scenics ground cover and light grey ballast I had used in other areas of the layout. The unfinished road leading to the left through Module A is an access road to the engine repair facility, which was the next target of my attention. I noticed the surface around the tracks appeared almost paved in the prototype - definitely neglected and with plenty of varied ground cover on top, but it was flat enough to warrant me laying down a base of sheetrock compound between the tracks:
20240826_231052.jpg20240829_125803.jpg
 
Since the reference photos showed no sleepers visible in the yard, I had to lay on the sheetrock compound fairly thick, in several layers. I would sand out any imperfections between layers with a foam sanding block. Once I was happy with the thickness of the pad and access road, I trimmed it and filled in the empty areas around it with ground cover and ballast.
20240903_083936.jpg
20240903_222223.jpg
Reply 9
Reply