Dave O

I have recently purchased an Atlas O-scale SW9 (2-rail); which (assuming it survives the overseas shipment) should be at my door in 3 weeks or so.  O-scale has always been my scale of choice; however, until recently obtaining equipment has been a show stopper.  Now that it seems I have the motive power on its way, it is time to plan a little layout for it.

[Update: The locomotive has arrived; so, game on!  ]

Living in Sri Lanka, model railroad materials are not easy to come by; everything must be ‘imported’ so it is subject to shipping fees and then customs/duty on top of that.  With that in mind, any potential layout that has a remote chance of becoming “operational”, must be small.  This leads to:

Givens:                                            Druthers:

- O-scale                                            - SW9 locomotive (44')

- #5 min. frog                                     - 40’ freight cars

- 36.5” min. radius curve                    - 12’ max. length

Following are some ideas that I’ve come up with.  Critiques/criticisms are welcome.  Love to hear your ideas ...

edit 1 ... Here is what I've decided to run with: Professor Klyzir's Chicago Fork.

04_final.jpg 

edit 2 ... I changed the blog title to better reflect the subject matter; hopefully didn't confuse anyone ....

Reply 0
jarhead

Passing Sidings

BOK,

I have contemplating the idea of putting a passing siding to move the engine from the front to the back of the train. To me that is a big plus. On my home layout which is a small O scale layout I have a runaround track at each end of the layout. It gives you more options to switch. But on this to keep the real estate to a minimum and using #5 turnouts you are limited to what you can do.If you extend the modules from four feet each to a 6 footers each making it a 12 ft long instead of an 8 footer it would be possible. Again when it is time to transport two four footers modules compared to two six footers is quite a difference.

Nick Biangel 

USMC

Reply 0
Dave O

Thanks for the suggestions ...

Alco251 ... I have looked at many layouts using sector plates and transfer tables; they are wonderful space savers.  I especially like them when they are "hidden" behind the scenery as is the example you linked to; although it does require access from the rear or side.

Materials from the UK or USA or Australia even.  In general terms, it has been my personal experience that I can usually find the same thing in the USA far cheaper than in the UK or AU; often the difference is as much as a factor of two (2) for the typical commercial products (i.e., those not specifically manufactured in either the UK or AU).  Now, having said that, shipping from the USA is often double the cost of shipping from either the UK or AU and can often exceed the cost of the part itself.  Size and weight are issues as well ... anything over 5 lbs. becomes an issue from the USA (thinking Atlas SW9 here); and don't even think about 36" pieces of flex track or rail ... but cut those rails in half (18") and it isn't so bad (and FastTracks will do that for you ... smart folks!).

Barry ...

Multiple car industries.  Both the first layout (NNSY) and the third layout (Chicago Fork) use a variety of cars: boxes, gons, flats, tanks.  The second one (Hartford Inglenook) is only served by box cars (per the prototype); of course these box cars will not likely be all the same, so even then you could have a great deal of variety, color, style, road names, size(?).  Obviously, being a transload facility, you could substitute any commodity that you like?

Run-around track.  Yep, they are useful and certainly add a lot to operational variety; but (as the Professor alluded to above), they do have a large cost in terms of space.  So, if space (length) is available, a run-around is well-worth considering; however, a run-around is not a required element for many prototypical operations, and if space is a consideration, it may be better to leave it out and design the operations such that one is not needed (i.e., avoid facing point spurs).

Now then, in the first plan, I alluded to a "shipyard" off scene to the right.  This shipyard, if it were added, would very likely include a small run-around track and both trailing and facing point spurs.  The Hartford Inglenook as it is shown is at the end of the line ... another section to the right would likely include a runaround (which was used to get the locomotive behind the incoming loads to service the facility).  I've actually put together a sectional HO layout comprised of four scenic elements such as this and the section before this one does in fact include a run-around.  If you are interested in these types of things let me know and I'll post them up in another "blog".

Chicago Fork (as I've described it*) is also at the end of the line.  In this particular case, at one time it was located in the middle of a branch line; however, the line to the left of this industry has now been abandoned (I was thinking a washed out bridge would be an interesting scenic element to better convey this fact to the operator; perhaps another 2' or so ...).  As in the case of the Hartford Inglenook, if this were to be located in a series of modules, a run-around would be nice to allow the locomotive to get behind the incoming loads.

Transfer tables and sector plates can also be used to simulate a run-around while saving the 2 units of length required for the turnout and clearance track.; but again, if the operations don't demand a run-around (per design), there is no compelling reason to add one in my opinion.

"A bit more thought" ... actually quite a bit of thought went into these little guys ....  

Damin Keenan has put up some shots of his O-scale switching layout that he took to a show.  It is based on a "Time Saver" and includes a run-around track in a 12' layout.

https://forum.mrhmag.com/post/now-ive-done-it-12191970 and  https://forum.mrhmag.com/post/photos-of-my-o-scale-switching-layout-at-the-rpm-meet-last-weekend-12194914

He also figured out how to control it with a Rail Driver ... way cool!  (I'm looking for one of these ....)  

And lastly, just for clarification, I did desire 12' as max length; however I did not put a limit on depth.  I've used anything from 18" to 30" thus far ... thinking 32-36" may be as wide as I'd like to go ... and only if necessary.

Cheers.  Dave O

* In Professor Klyzir's original design Chicago Fork is located at one end of a passing track; the main track continues on in both directions, the passing track continues on to the left, eventually connection to the main again.

edit ... Nick summed it up well, if portability is desired, (saving) space is very high on the priority list.

Reply 0
ctxmf74

Small space and run arounds

"So, if space (length) is available, a run-around is well-worth considering"

   For those with a space problem it might be worth looking into S scale. 12 foot of length is 576' in O scale or 768' in S scale so one would gain 192' or the length of a run around by switching to S scale. The scale width would also be proportionally wider for more switching and scenic possibilities.  SHS makes a sweet little switcher that's almost a smaller clone of the Atlas O switcher and there's a nice range of S freight cars from steam to modern era...DaveB

Reply 0
Dave O

But if it were S-scale ...

I could make the 8' Chicago Fork 6' long; and the other's would come in at 9' ....  

However, per the opening post, O-scale is a "Given" in this thread ...  

I have considered S-scale in the past; but it seems to be harder to come by and more expensive than O-scale when you do find it.  But again, for this one, will be focusing on 1:48 standard guage.

Reply 0
jarhead

Okay..." In the Beginning..."

Here they are... the two modules for the Chicago Fork. A little too hot to work outside, 90 degrees but it was good. Tomorrow or Monday I will do the top and shall return and report with info and more photos.

As of now each module came out to be a little less than $15.00 a piece in materials. Not shabby at all.

 

  

Nick Biangel 

USMC

Reply 0
jarhead

Different Scale

Of course if we use a different scale it will be different to a point. The beauty of this is we are using O scale in a very limited area AND that what makes it unique and very interesting. That's what keeps our curiosity and motivation flowing. What a great concept to be able to do a switching layout in a such small area, AWESOME !!!

Nick Biangel 

USMC

Reply 0
ctxmf74

the two modules for the Chicago Fork.

Those look a lot like the modules I build. Did you happen to weigh them? Someone was asking about lightweight benchwork and I didn't know how much this type would weigh compared to more complicated methods. I've never bothered to weigh mine as they are light enough for my purposes and my back :> ) ......DaveB

Reply 0
Prof_Klyzlr

The Weight...

Dear Chicago Fork fans, FWIW, the 1250 x 350 x 600 scenic module on the Carl Arendt-shown "Chicago Fork" weighed in at just-under 4 kilos (9 pound). (Confirmed using 2 different bathroom scales, and the loadcell at work ). Said weight/module included: - a _Full Proscenium_ Foamcore module with integrated roof/backdrop/lighting valence (For comparison purposes, keep that in mind when quoting figures for "domino" or "flat" modules!) - Qubelok aluminium exoskeleton Inc alignment and joining systems - Track - Wiring - Structure + "first pass" scenery (inc 0.7 kilos of rock ballast!) - Wiring + control gear (NCE PwrCab or homebruise analog walkaround throttle) - 3x 20W halogen lights + PSU (Permanently mounted on the module) - carpeting and fascias Had it been build as an 2x 4'-module "all track/scene" layout (instead of using a sectorplate module), I have no reason to believe it would not have ended up well under 8 kilos (18 pounds) in total weight. BTW, that 4-kilo module easily supported a 4-kilo Sunset brass UP challenger without flex or warpage. Which prompts the question Re common benchwork technique, "Overkill much?" Happy Modelling, Aim to Improve, Prof Klyzlr
Reply 0
jarhead

Weight

I was going to wait until I put the top. I will let you group know. I can't remember if it was mention here but what type of legs you recommend or do they just sit on top of a tables ???

Nick Biangel 

USMC

Reply 0
Chris Monje steamhog

switching layout simulator

The Skowhegan & Athens simulator provides a tricky challenge to efficiently switch the cars in the rail yard. 

two virtual switching layouts:
Riverside Yard   
http://www.precisionlabels.com/shunt/jpage330.html
Skowhegan & Athens    http://www.precisionlabels.com/shunt/jpage320.html

Skowhegan & Athens - Operating as a switching puzzle
The challenge is to swap the three cars in the train with the three
cars in the sidings in the minimum number of moves. To simplify this
the three cars to be removed are all boxcar red (or as near as you get
using MS paint), the cars to replace them with are other colours. Also
the spot for each car has a coloured band alongside corresponding with
the colour of the required car.
Each siding is 2 cars long. The loop is 2 cars long, the right hand
end run round is one car long. All cars, and the loco, are the same
length.

The challenge is complete when all 3 cars from the train are spotted
correctly, and the 3 cars that were previously spotted are in the
train ready to leave, with the loco at the head.

Chris

Reply 0
Dave O

Thoughts on "Legs"

Back on page 3, I provided a couple of links to Damin Keenan's O-scale "show" layout.  On page 2 of the first link, he shows his design for a "Layout Stand"; basically a collapsible support, topped by L-girders including a shelf for the controller.  It breaks down flat for ease of transportation and looks good when assembled.  I'm thinking I'll borrow from that (but will only have a shelf on one side of the stand).

Reply 0
Prof_Klyzlr

Chicago Fork Legs

Dear CF-support curious,

The original CF was not built with layout-specific legs. The mission parameters were to work with whatever supports were available. As a result, and with the knowledge that a higher-track-display-level was preferable, both CF outings were:

- Trestle table (30"/750mm tall)
- topped with the 2x 50L crates that carried the trains, throttles, layout skirts, and sundries required for a show.


_support.jpg 

cf-o_03.jpg 

(Look carefully and you can see the shadow of the crates thru the skirts. The Red LED display is on the borrowed mobile roadcased NCE ProCab system running the layout for this show...)

SO, if you have a shelf or some form of support for home use, the linked moduels can easily support themselves on top of whatever you might place them. (For show work, if the venue will supply 1x 6' trestle table, this also significantly reduces the ammount of gear you need to haul!)

NOTE! Having the horizontal table space under the layout, accessible via the split in the layout skirting is Invaluable in terms of having a ready place to stash/access spare equipment, tools, throttles, cups of coffee, paperwork, graphite sticks, etc etc!!!

However, should the venue not supply tables, and you be forced to provide your own legs, I would suggest considering something like this...

(a plank, narrower than the ID of the module frame, with collapsible trestle legs bolted to it.
Extend for height using conduit extensions. Believe MR used similar systems for it's 90's era project layouts?

NB that the "narrow plank" support is seperate from the module proper, and simply indexes in position using indexing blocks on the module frame)


_at_1400.jpg 


tensions.jpg 

 

Or maybe a solution like this?


cious_01.jpg 


lh_front.jpg 

Built from the same aluminium "Qubelok" as the module framing, they fold down into a 4' x 1' x 1" nest-able rectangle, and easily fit in the otherwise-useless tall skinny triangular space over the wheel-tubs (between the module and the angled interior wall/door surface) in the back of my Subaru Outback...

I know, I was concerned about the stability of a 1' deep module, standing 4' up in the air, supported by a 1' wide footprint too. However, there are solutions:
- add a strip along the bottom member of the A-frame, resulting in a widened footprint
(Pro : Simple.
Con : means the legs are no longer a consistent 1' wide for packing/transport)

- carry small builders "lead bags" or old-skool "sandbags" to lay over the A-frame feet
(Pro : allows the legs to stay at known packable dimensions
Con : means extra weight and discrete components to carry to/from the show)

In my case, I deployed neither solution, simply "taking it to the show and running it". Despite many bumps, leans, pushes and prods, not a hint of capsize or catastrophic collapse was detected...

4_skirts.jpg 

oorong11.jpg 

Happy Modelling,
Aim to Improve,
Prof Klyzlr

PS if you are forced to carry your own legs, it's highly reccomended to obtain and bring a collapsible standard 30" card table to the show. (Cheap, vinyl-covered, folds down to a 30" x 30" x 1" square for transport). This "mobile backstage workspace" will Save your Life...

 

Reply 1
jarhead

Power Source

I've noticed that you used a NCE ProCab to run the CF, will the NCE Power Cab will it be sufficient to run the CF ? I am not too familiar with the NCE system and it seems a big plus to have it with the CF since it is compact and easy to carry. At my home layout I have the Digitrax Chief system.

Nick Biangel 

USMC

Reply 0
Prof_Klyzlr

Zephyr for "one loco on a CF proto-nook" should be fine...

Dear Nick,

With one loco on a CF-esque proto-nook layout having possibly the easiest assignment ever given to an O 2R switcher, a PowerCab should IMHO be fine.

I've run both CF layouts (O and HO scales) with a PowerCab,
in the above pic CF-O just happened to be running a ProCab that day...

Given that a Zephyr Xtra is rated for 3Amps, 
(and assuming you're powering it with a power-supply capable of providing what the Zephyr can pass/deliver),
it should be well-capable of running a CF-type layout without fear...

Of course, if you start racking up more than 1 loco on the layout simultaneously,
(and on a CF-type protonook, why would you?)

a quick check to confirm the cumulative load of all locos simultaneously would be well-advised.

Happy Modelling,
Aim to Improve,
Prof Klyzlr

Reply 0
BOK

I think, Mr. Keenan got it

I think, Mr. Keenan got it right with his layout by combining a runaround track with three spurs one of which is a facing point one. Looking at the pix of his operation it would be very easy to use thin industrial structures for background industries, with maybe three to the left, one or two to the right and a team track in the front which would give hours of satisfiying operation. I see this as more fun beyond shuffling cars on a pair of tracks like cards. This would make a neat layout whether for exhibition or home with an easy to add extension of a 6' board for off-scene staging in O, or any scale.  

But this is just one opinion and I know you guys are pros building small detailed and ingenious layouts. Anyhow, no matter the plan, you can't go wrong with an SW locomotive and smaller cars which I Ialways enjoyed running/handling as an engineer. Keep the ideas coming

Barry

Reply 0
Dave O

Run Around ...

OK ... here is a layout based upon Damin Keenan's O-scale shelf layout.  He used a GP38-2 and what look like 60' cars, so he added an 18" cassette on the end of the 12' module for the show (bringing the length to 13 1/2').  Using my shorter loco and cars it fits inside the 12' length requirement without a cassette ... (sort of).  Here is what I came up with:

d_Of5_01.jpg 

Note that this plan uses five sets of points (switches); while all the earlier plans shown used two.

I added a couple of industries where it seemed they would fit.  Up on the right is a bakery.  It receives plastic pellets in covered hoppers (which must be spotted in the last spot, near the storage bin); corn syrup in tanks (hose connections at the last spot of the building); and sacks of flour/sugar that arrive in box cars (which can be unloaded at any of the three building spots).

Down on the left is a scrap dealer, which receives gondolas.  (You may freely substitute pipe dealer, lumber yard, etc.,)

The spur to the upper left is basically a switch back for the bakery ... no industries here.

The main track runs through the middle.  The run-around holds 2 cars; the main to the left will hold a loco + 1 car and the right will hold a loco + 3 cars.

Now then, the "problem" that occurs is that I'm not sure how to "operate" this layout in a prototypical manner; i.e., determine what cars the customer wants removed and replace them with incoming cars if available.  Not only is it difficulty to swap out all the cars (perhaps even impossible in this particular scenario); but there is really no good "off-spot" track available to hold incoming cars that the industry is unable to accept just now.  Assuming 3 of the 4 cars spotted at the bakery are ready for shipping and an inbound train brings in 3 more (note that they may not necessarily be the same type as those departing); how does the train service the industry using the available tracks?

As a "puzzle" where one is simply moving cars around from spot to spot without regards to serving an industry, this type of layout can be a fun "game".  But when you try to operate it in a prototypical fashion it often breaks down.

One "easy" fix to help alleviate the congestion would be to place the industry on the unused right side of the run-around track (eliminating the switchback).  The switchback could then be used as another industry or perhaps even better an off-spot track to store inbound cars until the industry can receive them.

Going back to the original track diagram, when I look at it, I'm thinking I don't like switchbacks, especially if they are not really needed.  By moving the bakery to the switchback spur and eliminating the spur currently serving the bakery, one set of points can be eliminated (bringing the total down to four).  But now, all the points to the two industries are facing the same direction ... so I really don't need the run around anymore ....  Eliminating it, removes another two sets of points (bringing the total down to two); but wait ... what is left is an Inglenook (a 6-5-5 one in this particular scenario).  Cutting off 4' of length and re-centering (and flipping top-to-bottom), I'm back to a Chicago Fork, and as shown earlier, this one CAN be operated in a prototypical fashion.

I am not understanding Barry's comment(s) about the "shuffling of cars like cards".  Operating Chicago Fork is a little bit more involved than pull them all out and shuffle them back into the industry in the proper order ... for one thing, there is only room for the loco +2 cars on the right end of the main track ... so two is all you can pull at once from the industry.  The main and passing tracks only hold two cars each ... so you have to think a bit to get the cars sorted in the right order ... just like the prototype.  

XTrackCAD allows "running" the trains to test/verify operations.  The software is free (these track plans were drawn using it); so I'd suggest any who are interested download a copy and give it a try.

http://www.xtrkcad.org/Wikka/HomePage

Reply 0
crrcoal

Don't understand....

....why you think operating this plan prototypically breaks down. Plenty of real world examples out there (present day) of the prototype using a switchback to service an industry. One such example is NS near Hershey PA. There is also another example of a switchback through a building! I have screenshots of it from bing maps but the location escape me at the moment.

Reply 0
AlanR

Isn't this just a Timesaver?

Dave, this last plan is really just a Timesaver in disguise.  Quite frankly, i think your last version of the Chicago Fork will provide more visual and operational interest than this will.

 

Alan Rice

Amherst Belt Lines / Amherst Railway Society, Inc.

Reply 0
jarhead

Track Planning is like a wedding...

You want to start small and then you begin adding this and then that and then we loose track of the original plan and the reason why.

Nick Biangel 

USMC

Reply 0
jarhead

Module with top

Here is one of the modules with the top. Tomorrow I need to get a sheet of cork to cover the plywood. I will be using the cork sheet instead of cork roadbed since any of the track will not be laid on road-bed. After I am done with the top, I will start the cosmetic portion of the fascia board to have it ready so when I do the electrical/power portion of the modules the fascia will be done.

The module is heavier than I expected...18 lbs but it is built heavy-duty to put up with the punishment of the transportation.

Simplicity of this project has brought the "magical" back. K.I.S.S. Keep it Simple Syndrome, to say the least.

The link that Alco251 shared with us on this thread is really interested. It is a very formative blog how this modeler started this small, O scale layout and showing from the beginning to the end. His 12.5' x 18" layout. Very interested and very enjoyable to read and see the progress. I want to thank Alco251 for sharing that with us, I am putting the link again just in case some one missed it.

http://www.rmweb.co.uk/community/index.php?/topic/15931-bury-thorn-sons/

 

Now, time to eat supper.

Happy Memorial day

God Bless Our Men and Women in the Arm Forces

 

 

Nick Biangel 

USMC

Reply 0
Prof_Klyzlr

"Built heavy for transport"???

Dear Nick,

Um, my carpet-wrapped "Foam+Qubelok" modules have survived a trailer rollover with no damage.

(Speaking to "punishment of transport", although such a situation is hopefully the exception and not the rule for touring layouts. If you layout is regularly subjected to such abuse as part of "normal careful touring" procedures, then can I respectfully suggest your "touring procedure" and possibly touring/loading/setup crew may need some tweaking? ).

Peripheral analysis suggests the ultra-light (and yet more-than-sufficiently rigid/strong) construction meant that inertia and momentum factors were minimised,

to the point that, despite the trailer being fairly violently thrown around and ground-up as it came to a stop roadside, the actual "collision speed"/"impact force" between the trailer internals and the modules was nowhere near enough to cause damage.

Said another way, with no significant "mass-moving-at-speed" inertia to "hit with",
the modules harmlessly "bounced" rather than "impacted".

I'm sure the wood-domino modules will serve you well. However, I can't help but feel a touch of overkill?
(Must note however that it's still better than the 60-odd Kilo 6' x 2' 6" x 2' 6" steel-framed plywood "enclosed-box" modules that formed the basis of "Red Stag" and "Muskrat Ramble". Those were simply money-makers for the local chiropractors!)

Happy Modelling,
Aim to Improve,
Prof Klyzlr

 

Reply 0
ctxmf74

The module is heavier than I expected...18 lbs but it is built

Thanks for the weight info. That's about what I guessed my modules weigh. Plenty light enough for a couple of old folks to move if ever necessary. Hopefully mine won't need to be moved often, not because of weight but because moving is a big distraction and setback for layout completion......DaveB

Reply 0
Dave O

Run-around ...

... Not exactly a "Time Saver", but obviously influenced by one ... it is based on Damin Keenan's O-scale shelf layout (as stated earlier).  I provided it simply because Barry had mentioned (twice) including a run-around; I am interested in learning how it would be operated ....

crrcoal ... you say it can be operated prototypically ... there is the plan; tell me how you'd operate it, I'm listening.  Base it upon the Hershey, PA example if you like.  Remember the rules though,  including the 12' length, O-scale, 40' cars.

Alan ... yes, the Chicago Fork is still my favorite and the one I'm aiming for.  I may make some minor tweaks as I "see" this layout being part of a slightly larger "home" layout (the 8' section being portable); so want to be sure I've gotten the module "ends" sorted out, before I put the saw to wood (and while material is still in transit). 

Nick ... I'm choking on all the dust!  But it is all good.  

Right.  Have confirmed the loco is actually moving this way, hopefully it will survive the trip (generally 2-3 weeks).  Time to get some track pieces and parts moving this way.

I finally "saw" the number for the foam core thickness, the Professor used ... 3/16"!!!  That is quite a bit thinner that I had thought (was thinking ~3/8" or so).  That (or something similar) is available at the frame shops ... not sure how large a sheet I can get it in ... but I'm also concerned (a bit) about structural integrity for something that will hopefully be moved on occasion to show it off.  I have never seen anything like the the self-locking aluminum framing pieces that Prof used on his Chicago Fork; so thinking there will be plywood in mine.  I can go with 6mm cabinet grade (perhaps even smaller, will have to look).  Can use some tricks from the amateur astronomers who drill lots of large holes in structural members to save weight.  Dave O

 

Reply 0
Prof_Klyzlr

Foamcore sheet dimensions

Dear Dave,

Common Foamcore (US) / Kappaboard (UK) sheet sizes are based of divisions of 60" x 40" 

IE:
60" x 40" x 3/8" (1500mm x 1000mm x 5mm)
30" x 40" x 3/8" (750mm x 1000mm x 5mm)
30" x 20" x 3/8" (750mm x 500mm x 5mm)

Given that the previously noted Proscenium and even Domino designs rely on continuous long elements/"strips" for their box-girder longditudinal strength, I would certainly reach for the 60x40 sheet.
(The 60" length becomes your ruling dimension for max module length,
as it is the longest single continuous length piece you can get from a stock sheet).

It is technically possible to join foamcore members together with a splice-plate.
However, to assemble, let's say a 10' module,
thus requiring 2x 5' long strips to be end-joined for each "long member", 
we'd be talking about laminating a minimum 2' long splice-plate,
would be relying on perfectly assembled lamination,
and still would have concerns about flexing...
(See my earlier comments RE Qubelok and Not Cutting The Main Frame Members!!!)

If one insisted on building excess-length modules, by offsetting the splice-joints between the long members,
one could counteract the added-weakness to-a-degree (Not perfectly resolved, but a lot stiffer than if all of the weak spots co-incided at a given location L<> R accross the module. Can you can "Folded in half"?)

However, reality kicks in:
- a 5' x 2' (x2' tall) module is about as large as a single human can easily carry thru a stock single-person 30" doorway
- my Subaru Outback can handle Qty 3 4'x1'x2' modules between the cargo-area wheel tubs

Therefore, 4', or maybe 5' long modules area about the max I would be comfy reccomending.
(for all manner of reasons, even if they were built out of something other-than foamcore)

Happy Modelling,
Aim to Improve,
Prof Klyzlr

PS Who said modelling materials and techniques didn;t have real-life application? After some major window work to our house, the bedroom window pelmet didn't fit over the curtains any more. 90-minutes and one sheet of foamcore later, and we had a custom-fit "temporary" 12' window pelmet (I remembered, because that's where I really first pushed myself to do a "more than 5' in one length, with laminated splice plates" assembly... ).

 

Reply 0
Dave O

Thanks Prof.

... so 3/8" is the thickness I am looking for?  Thinking I saw 3/16" in one of the CF articles ...

[Found it ... in the first link you provided Small Layout Scrapbook page 97a lists the fomecore thickness as 3/16"; is that an error?]

Without the aluminum frame ... is foamcore a non-starter (although the 3/8" thickness may be for me).

I would definitely use two 4' modules for the 8' portable section.  Thanks.  Dave O

edit:  To help alleviate any confusion ...

5 mm = 3/16", which is the thickness Professor Klyzir used on his modules.

Reply 0
Reply