jeffshultz

Or.... How to potentially thoroughly mess up an operating session. 

I've always had mixed feelings about the traditional 4-cycle waybill system. It does seem to work, normally, but it also seems fairly maintenance intensive - all the waybills have to be flipped between operating sessions and the like. I did not become a model railroader in order to do paperwork (which is also why I'm figuring on a TWC system instead of TT&TO). It also seemed like it had a certain lack of randomness.

I'm also not that enthusiastic about switchlists, although frankly I've not had much opportunity to use them. More paperwork... although I do realize it can't be avoided entirely. 

Continued in comments.... 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 1
jeffshultz

Random Thoughts on a car card & waybill system

My father-in-law, also a model railroader (I blame myself for that), has also stated that when it comes to computer programs, he prefers one (Ship-It, I believe) because it works on the model of industries requesting cars, rather than simply a car delivery & pickup model. "The industry should be requesting cars" has become somewhat of a brainworm for me.

My layout pretty much requires a mole type operation - I don't have enough yard room to keep all of my cars on the layout. The advantage to the mole type operation is that it means that (since my layout does not have any captive traffic) the mole can add waybills to cars as he assembles the trains and remove them from the car card when the car returns to staging. This means that effectively I only need a two sided waybill - one for the trip out to the industry, the other for the return.

Now that the philosophy (industries request cars) and the hardware (car cards and 2-sided waybills) have been decided on, how do we actually accomplish this? My answer is to use numbers. The way I see it, the calendar date will always have a last digit between 0 and 9, and if you have a fixed day of the month (say the second Thursday of the month) it's going to be one of seven digits. I checked a perpetual calendar and came up with 1,2,3,7,8,9, and 0 for the second Thursday.

Forget Saturdays, the BIG layouts in the region have all the Saturdays in a given month locked up.

What I plan on doing is setting up all my industries to request fixed numbers of cars, divided by car type, depending on the digit of the date. So on a "1" my plywood mill could request 2 boxcars, 1 centerbeam, and a woodchip hopper, on a "2" it would be no boxcars, 2 centerbeams and 2 woodchip hoppers, and so on. So that gets us cars out to the industries.

But just leaving a car there for one session/day is kind of unprototypical... and frankly, just a tad boring. Drop one day, pull the next... eh. You also can't just make the pull indicator "odd" or "even" as I just looked on the calendar and between February and May every second Thursday has been on an odd numbered day. What you can do is 1,2,3 - where if the day is divisible by that number, then the cars are pulled. So some cars will be pulled in the next op session, some will hang around for the next beyond that, and a few perhaps even for one past that.

There is probably some weird combination of dates (like Feb, Mar, and April 2017 all end up being divisible by 3) that might leave cars out too long, but if you need to declare it's an even day in order to get certain cars back, well, it's your railroad. I suspect the problem would lessen if you ran more than one operating session a month as well. It even lets you go in and run your own railroad yourself between op sessions if you want to - you don't have to worry about having all your waybills on the same cycle.

Yes, there would have to be at least some attention given to making sure that you didn't try to stuff eight cars in a three car siding. Off-spots can take care of some of that, if you have the room for them, but mostly it's going to be tracking how many cars are in an industry at a given time and possibly making some judicious swaps of waybills. 

Okay, most of the above just came out in about a two hour period - start shooting holes in it.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 1
David Husman dave1905

Comments

Quote:

I've always had mixed feelings about the traditional 4-cycle waybill system.

Nothing says you have to use 4 cycle waybills in CC&WB.  I use virtually all 2 cycle waybills.

Quote:

It does seem to work, normally, but it also seems fairly maintenance intensive - all the waybills have to be flipped between operating sessions and the like.

Only the cars that have been loaded or unloaded or are entering the layout need to be turned.  Only a very small layout where all the cars are loaded/unloaded or enter the layout in one session need all the waybills turned.

Quote:

I did not become a model railroader in order to do paperwork (which is also why I'm figuring on a TWC system instead of TT&TO). It also seemed like it had a certain lack of randomness.

TWC is way more paper intensive than TT&TO.  Regular trains only need a clearance.  Meets between regular trains and extras and regular trains don't need orders.  Only meets between extras require orders.  TWC is acutally CTC with out signals, its not a modern TT&TO.  Two completely different concepts.  In TT&TO a train always has ALL the authority it needs to complete its trip across the railroad with the trains that are on or authorized on the railroad at any given moment.  With TT&TO, at any point in time, if you pulled the dispatcher out of the chair all the trains on or authorized on the railroad could continue to destination with not a single piece of paper being issued.  With TWC, authority is incremental, issued in chunks just enough to get it to the next meeting, junction or holding point.  With TWC, if you pulled the dispatcher out of the chair, once the trains reached the end of the current limits, they would all stop and would be unable to move.

Quote:

I'm also not that enthusiastic about switchlists, although frankly I've not had much opportunity to use them. More paperwork... although I do realize it can't be avoided entirely. 

At some point you have to communicate to the crews what you want them to do.  Generally that means that something has to be written down because people can't memorize it, There are options, but none of them are paperless.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 1
wp8thsub

Time

Quote:

It does seem to work, normally, but it also seems fairly maintenance intensive - all the waybills have to be flipped between operating sessions and the like.

I have a large layout with about 450 cars, using active staging.  Flipping bills to re-stage between sessions typically takes around 20-30 minutes at most.

Rob Spangler MRH Blog

Reply 0
Rich_S

@Jeff Shultz

Jeff, Maybe I'm really tired but your system sounds very complicated. I use Ship-it car cards, I never went for the entire system, I like the car cards. When using car cards you have to think in terms of a shipping agent. It sounds like you've already figured out shipping and receiving frequencies for your industries. Now the hard part, when your industries ship, what do they ship and where? I'm going to use one of my industries as an example, my Medusa cement storage facility ships bulk cement. They have two customers, Standard Block in Buffalo, NY and Concrete Supply in Akron, OH. Each customer wants a two bay covered hopper of cement on a daily basis. So I'm the railroad shipping agent, I two way bills one for Standard Block and one for Concrete Supply. Now I need to find two covered hoppers in my yard that are empty. I then place the waybill in the car card that reads To: Medusa Cement Lading: empty and add those cars to the train that services Medusa cement. If you're using a switch list, the conductor would then go though all of his waybills and make a note of the car numbers that are going to Medusa cement. Now the cars have been delivered and the operating session is over, yes you flip those waybills to read To: Standard Block Buffalo, NY From Medusa Cement Lading: Cement. If you are using a two box system, you move the waybills into the shipping box from the receiving box and the crew now knows those car are ready for pickup. Once the cars reach your interchange yard, you remove the waybills so the car cards are ready to accept their next waybill. Don't just keep flipping the waybills in staging, the crews will learn car ABC 123 always goes to Medusa cement.

When you first get everything setup, yes it's a lot of work. Once the system is up and running, it only takes a few minutes between operating sessions to flip the cards and pull the cards from car cards that are in the interchange yard.

Like Dave mentioned above, TT/TO operations are fun. One layout I operate on, there are only 6 scheduled trains, everything else runs as an extra. You have to clear up for the scheduled trains, but meets and passes for the extras are determined by the dispatcher. Setting up your time table does require some thought, I had to revise mine several times, but it's part of the process. I used Microsoft Word to create my timetable.

Here is a condensed example of my TimeTable.

                                                                                                                                                                                                                                      

FOR THE GOVERNMENT OF EMPLOYEES ONLY

 

 

 

 

OPERATING RULES

MOVEMENT OF TRAINS

100-A1. The movement of all trains on the Long Valley Branch between Downer Jct. and Whitsett Jct. will be made by Timetable and Train Order. The Main track must not be occupied unless authorized by the Train Dispatcher.

100-A2. The movement of all trains on the Star Jct. branch between Star Jct. and Washington Mines will be by the authorization of the  Dispatcher.

100-A3. Secondary tracks, sidings and spur tracks will be used with the authority of the Train Dispatcher.

 
 ENGINE AND CAR

RESTRICTIONS.

200-A1. Do not place any car exceeding 15 feet in height from top of rail at Medusa Cement in Long Valley.

200-A2. Six axle engines must not be operated on this railroad.

200-A3. Maximum tonnage per engine is seven cars.

200-A4. Cars exceeding 85 feet in length must not be operated on this railroad.

200-A5. Cars exceeding 20 feet in height must not be operated on this railroad.

NORMAL POSITION OF SWITCHES

700-A1. The Normal Position of Switches at the Specified Location is as follows:

 

Switches Located At

 

Connecting

 

With

 

Normal Position Is Lined For

 

Star Jct.

 

Long Valley Branch

 

Star Jct. Branch

 

Long Valley Branch

 

Long

Valley

 

Main Track

 

Passing

Siding

 

Main Track

 

Long

Valley

 

Passing Siding

 

Industrial

Track

 

Passing

Siding

 

 

SPECIAL INSTRUCTIONS

INTERCHANGE TRACKS

600-A1.  STAR JCT. Branch – Midland Coal

  • Siding capacity is 7 cars.

YARD LIMITS.

300-A1. Yard limits are as follows:

Track

Between

And

 

Main Track

 

 

Star Jct. Branch

 

 

Sliding Hill Tunnel

 

Star Jct.

Switch

 

East Main Street.

 

Achenback Tunnel.

NOTE – All movements must not exceed RULE 500-A2 within these limits.

 

 

 

 

 

 

 

 

 

 

 

 

 

INDUSTRIAL TRACKS.

 

400-A1.  Long Valley Industrial Tracks.

INDUSTRIAL TRACK

 

Spur Capacity

40 Foot Cars

 

Snyder Box Company

Medusa Cement

Vulcan Scrap Metal Yard

Vulcan Metal Receiving Track

Vulcan Tank Car Track

 

4

4

6

2

3

 

400-A2. The minimum distance from a switch any car may be spotted is forty feet.

400-A3. The minimum distance from a road crossing any car may be spotted is forty feet.

400-A4. The minimum distance is measured between the frog of the switch and the knuckle of the car closest to the switch.

400-A5. When more than one car is placed on an industrial spur, the car furthest from the switch will be spotted for loading and/or unloading.

 

SPEEDS.

500-A1. Maximum Authorized Main Line Speed is 25 mph.

500-A2. Speed Restrictions.

LOCATION  

MPH

Passing Sidings, Industrial and Yard Tracks.

Sliding Hill Tunnel

Long Valley Tunnel

10

 

 

15

 

15

 

LONG VALLEY BRANCH

Downer Jct. To Whitsett Jct.

STATIONS

Distance from End of Track

Siding Capacity

40 Foot Cars

 

Downer Jct.

Star Jct. Branch

Long Valley Siding

Whitsett Jct.

 

0.0

10.5

20.0

40.0

See Rule 600-A1

7

The Direction from Downer  Jct. to Whitsett Jct. is Eastward.

STAR JCT. BRANCH

Star Jct. to Washington Mines

STATIONS

Distance from End of Track

Siding Capacity

40 Foot Cars

Star Jct.

Midland Coal

Achen Back Tunnel

Washington Mines

0.0

0.5

1.0

10.0

7

Out of Service

The Direction from Star Jct. to Washington Mines is South.

Effective 12:01 A.M. January 1, 1974 all trains will operate as extras.

GENERAL ORDER NO. 200

Effective 12:01 A.M. January 1, 1974

 

(a) TIMETABLE AUTHORITY

Timetable No. 2 is in effect. It contains all the necessary instructions issued in General Orders up to and including General Order No. 199, all of which must be removed from Bulletin Boards.

Each employee must examine each page of Timetable No. 2 to see that his/her copy is complete.

(b) This General Order is printed in Timetable No. 2 and will not be issued in sticker form.

Cheers,

Rich S.

Reply 0
jeffshultz

I should mention something else...

My railroad is set up around 2004 in dark territory, so TWC is also the prototypical way for me to go. 

Most of this was just figuring out how I'm going to use car cards. 

Or if I want to sit down, again, and figure out JMRI Ops... the problem I had with it was that I found myself creating off-layout trains to off-layout destinations to get the cars out and then turned around. I figured at that point I was probably doing something wrong. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 1
Oztrainz

Railroads are a "pull" system

Hi Jeff and all,

I think that you may be on to a way of simulating the "apparent randomness" of what really happens in industry. 

Railroads are really a "pull type system" in industrial engineering speak, where in the most simple terms, the demand from an industry is caused by the need to move "something" from "somewhere" to their customer "somewhere else". The "pull" from the customer is the sales order to the manufacturer to make the "something". Simply put, nothing moves on the tracks unless there is a "pull" that causes a need to move something from "somewhere" to "somewhere else" . Cars don't get moved on the tracks on a whim. That costs money and the railroads are in business to make money.

Now just because a customer orders "widgets" today from the manuafcturer, the "widgets" require raw materials of x number of cars of raw material "A" in "this type" car and "y" numbers of cars of raw material "B" in "that type" car.

Here's where it gets tricky, the customer needn't/doesn't order the same thing all the time from the manufacturer. And the manufacturer can have different customers ordering different products that require different amounts of different raw materials that have to be delivered in different cars. Can you see some radomness starting to come in here because of the differing demands of different raw materials to make different products and the possible requirements to use different types of cars to deliver those different products to different locations at different distances apart?

A sales order is a legal contract that the customer will buy the "something" from the manufacturer. However the trigger to cause the "pull" is the delivery date on the sales order. That's when the countback starts. What do I mean by this?

  •  If the manufacturer and the customer are in different locations and the product is to go by rail, then the railroad will give guidance on how long it takes to get the "something" from "somewhere" to "somwhere else" Lets say it takes 2 days to get there, so that the product must be made by Delivery Date minus 2 (DD-2)
  • Now assunming it takes 3 days to make the product, then the start of making that product cannot be commenced any later than Delivery date minus 2 minus another 3 days (DD-5) 
  • So all raw materials to make the product must be on site before DD-5. 
  • Now supposing that it takes 4 days to transport raw material A to the manufacturer, To get that raw material to the manufacturer on time requires that the railroad start to move that car of raw materials to the manufacturer at DD-9 
  • Now supposing that the cars that deliver "raw material A" are unique. If they have just delivered to the manufacturer, these unique cars now require at least another 8 days before they can get another load of "raw material A" back to the manufacturer because they have to get back to where "raw material A" come from, be loaded and return to the manufacturer. So we are now out to DD-13 before another lot of "widgets" can be made, assuming they don't get sidelined somewhere in either directiion, UNLESS the railroad has another set of cars thay can use to transport "raw material A" or unless the manufacturer has the capacity to store several lots of "raw material A" on its site as a "safety stock". And big qauntities of safety stock can cost big money..
  • This also assumes that nothing "breaks" in the manuacturing process that causes a different product to be made that goes to a diferent customer in yet another type of car.

Is your head starting to hurt yet? Car card systems are at best a reasonably basic approximation to what really goes on in industrry. I look forward to what you come up with.  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Neil Erickson NeilEr

Kiss?

Jeff- How about an up to date version of tab on car for a two destination railroad?

If coming from staging to an industry and back I would put a magnet in each car and a colored "tab" with a letter on it to give the location and spot the car belongs.

After delivered it could wait for an odd Tuesday to remove the tab.

Next Tuesday collect all the cars with no tabs and return them to staging.

The mole has a pile of tabs he draws at random to create a train. You will only have as many tabs as you have spots because it came off a car that is going to move now or next month.

I kind of like this concept. The tab could even be a QR code if you wanted to read more about the contents and origin/destination on a smart phone or trackside reader. Now I want some active staging [frown]

Neil Erickson, Hawai’i 

My Blogs

Reply 1
TimGarland

Waybills and Operations

Jeff,

I think I may have found something right up your alley. This could be just the type of system you are looking for to route your cars. On the web check out the following article by Ryan Kunkle. Look for Understanding Model Railroad Waybills and Operations - thespruce.com 

It is definitely a different approach and requires minimum work and is easy to understand. Plus to me it is a lot cooler than the traditional Car Cards and Waybills everyone else uses. Let me know what you think!

 

Tim Garland

Reply 1
David Husman dave1905

Pull?

Railroads are really a "pull type system" in industrial engineering speak, where in the most simple terms, the demand from an industry is caused by the need to move "something" from "somewhere" to their customer "somewhere else".

Depends on where you are in the supply chain and where you are measuring it.  All the industrial engineer and supply chain people I worked with considered teh railroad very much a Push system , especially from the consignee's perspective.  A lot of modelers think the railroad is a JIT, on demand system because "the customer orders a car and ter railroad spots it".  This harks back to the micro vs macro modeling perspective.  If you are modeling an ISL or just one town or switching area, yes, it looks like that.  If you go up a level or two, not so much.

The problem with railroads is that the time lag between the customer ordering product and the railroad delivering it is so long.  Real simple example, coal trains.  In Sept. 2008 a utility contracts with a coal mine to supply 12 million tons a coal a year for the next 10 years.  The utility then enters int a contract with the railroad to deliver a million tons of coal a month for the next 10 years.  The utility sources cars  and the railroad sources power to support a million tons of coal a month.  

The railroad gets paid when the coal is loaded into the car, so they are interested in loading as many cars as fast as they can to get their money as fast as they can.  In the dispatch office the two worst chewings out I got were delaying UPS and delaying empty coal trains.  In the dispatch system, an empty coal train was a higher priority than a manifest freight train.

The railroad is going to shove empties into the mine as fast as they can. Back in the days when coal loadings were running hot, both the BNSF and UP serve mines in the Powder River Basin and both serve some utilities.  Both railroads keep "spare" sets of empties on hand in case the other railroad can't cover a loading with a set of empties, they can call the mine and inject a spare set of equipment into the fleet to "steal" a loading.

As soon as a train (or car) is loaded the object is to get the train (or car) to the consignee ASAP.  If it was a true pull system then the object would be to get it there when the customer needed it.  That's generally not what happens.  The railroad tries to get it there and spotted as soon as it can.  If you are standing at teh unloading pit of the utility, it looks really pullish, as soon as you order in a train it comes in.  If you are the railroad it looks really pushish, there may be 5 trains backed up for the utility, sitting in sidings a couple hundred miles back or the utility might be gapped (no train) for a day or two.

If somebody orders a car of something and wants it spotted on Friday, and it arrives at the station on Monday, the railroad will spot it Monday.  If the company doesn't want it spotted until Friday, the railroad will hold the car and charge the customer demurrage and a switching fee to spot it Friday.  If you are standing at the dock on Friday it looks like a pull system, you ordered the car on Friday and it was spotted on Friday.  If you work on the railroad its a push system, you wanted the car on Friday and the railroad had it ready on Monday.

Same with empties.  If the railroad wants to be able to supply empties on demand that have to store a bunch of empties near by.  From the standpoint of the shipper its a pull system, they ordered an empty and, poof, an empty was spotted.  From the railroad's standpoint it was a push system, they were sitting on 20 empties a day for a month 1 mile from the industry.

The whole 'day minus 2" scenario you described is how it should work if it was a pull system.  It doesn't really work that way.  Transit times vary by days.  There are all sorts of interruptions and delays.  In Novembers in the northern half of the US, if there is a 50 degree swing in temperature (daytime 65 degr, night time 15 degr) when a cold front comes through, about 2 am the dispatcher's CTC display will start having track lights pop in.  Broken rails.  That will add days to the transit time of cars crossing that subdivison.  Add in engine failures, holidays, heavy rains, the list goes on and on.  The whole we order it on Moday, it gets there on Frigday thing is a cool idea, but rarely works that way.  

You also have to realize that stuff is rarely ordered on Monday for Friday delivery.  Cars are ordered weeks or months in advance,  products are projected out weeks in advance.  There is way more lead time involved (at least in successful operations).

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Benny

...

Switchlists are nothing more than a pack of waybills or car cards in a stack in order for where they get set out or picked up.  The only cars not in your hand are those that are awaiting pickup at the industries, but for those sites you have an order telling you where your service areas are, and those areas enter your mental switch list between the cars you have in your train to set out in these locations.

Out of all of these setups, it is my observation that car cards takes the least amount of paperwork preparation and the least amount of work to set up.  The cards can be recycled an infinite number of times, and the TO itself works without any input from any outside force save the clock.  Simple, easy, just go.

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
David Husman dave1905

Randomness

People seem to want "randomness" in their operations.  When you look at a model railroad from a mathematical standpoint its really not that random.  You have a fixed number of cars with specific types that go to between a fixed number of destinations on the layout and some of those destinations can accept only a fixed selection of cars.  This is true regardless of what type of car forwarding system you use.

On the other hand, "randomness of operation" is much easier with a manual system such as CC&WB or handwritten lists.  It it least facilitated by a computer switch list program.  A computer switch list program only does what the programmer enabled it to do and can only use the logic that the programmer built into the system.  If you want to do something else, oopsies can't be done.  For example in JMRI, certain tracks can only do certain things.  Want to do something other than that?  Oops, sorry can't do it, you have to create a psuedo track of a different type to do that function.  Ship-It has some of the same things, unique car types, psuedo stations and psuedo tracks built to "trick" the system into doing what you want.  Not as much with CC&WB.  A big commodity on my layout is pig iron.  The normal car for pig iron is a GB gon, general service mill gon.  If I have a stock car not doing anything and am short a mill gon, I can load pig iron in a stock car (same with lumber, hay, cotton, and a dozen other commodities).  To make this change with CC&WB takes about .5 sec.  To change from the default in a computer program takes a lot more work and may require unchanging it later.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
jeffshultz

Interesting discussion....

...I'm not sure it's the discussion I intended to happen, but this is fascinating nonetheless. 

Tim Garland - thanks for the tip to the Ryan Kunkle article, I've got it up right now. 

Benny - Your thinking and mine seem to be in basic alignment. It's just an application thing for me. 

Neil - interesting concept, but something in my head is trying to reject tab on car systems. Not entirely sure why. 

Dave - I always love hearing how it actually happens on the prototype. Perhaps I need a more random element than " x number of cars on y day." for the industries. Or, perhaps more prototypically, some industries will have fixed numbers and others variable ones. 

Oztrainz - thanks for the input, and yes, it can make your head hurt. 

I suspect that I'm going to be making a fair amount of work for a mole operator. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
ctxmf74

 "I can load pig iron in a

Quote:

 "I can load pig iron in a stock car"

That sounds like something a computer might try :> ) Would this be a regular occurrence? Unless it was somewhat common they might not have the equipment to load into a house car if they are set up to load into a gon? Perhaps they'd rather wait a day for the next gon  .....DaveB

Reply 0
Benny

...

If the customer asked for a gon, and you sent them a stock car, you'd get a notice from the customer notifying you that they are returning the stock car empty and that they want two gondolas, one ot make up for the missed day and one for the next day.

Customers should not be conflated with being the same business entity as the railroad.  Your businesses couldn't care less about the railroad, the rail road couldn't care less about the businesses, they're not working with each other, one contracts the other, the other bills the former.

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
RSeiler

Tab on car...

That thing in your head that is rejecting tab on car is in my head too. I just can't stand that, totally ruins the mood for me. 

I also agree that this in an interesting conversation. 

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
David Husman dave1905

Or not

Quote:

If the customer asked for a gon, and you sent them a stock car, you'd get a notice from the customer notifying you that they are returning the stock car empty and that they want two gondolas, one ot make up for the missed day and one for the next day.

Well you'll just have to find Mr. Peabody and borrow his Wayback machine to go explain to the customers in the 1800's (and even into the 1900's) that they were doing it all wrong and they should stop loading those stock cars with stuff other than livestock.  

Yes there are customers who have specific car requirements.  A paper mill in Pine Bluff only wanted a certain series of MP cars to load a certain type of paper rolls, that series car was just the right interior width and height to accommodate the preferred loading pattern.  On the other hand, the kraft paper would go in any boxcar available.  For local moves they would even load cars without doors (about their only requirement was a decent roof and floor that would support the forklift.)  The railroad has the authority to distribute its assets as it sees fit.  If an industry keeps rejecting cars, then if the railroad has one car and it can spot it a an industry that loads every car or an industry that rejects a lot of cars, its probably going to give the car to the industry that's a guaranteed load.

While there is a possibility that they would raise and objection its not for the reason you cited.  They would go ahead and load the stock car, but they might ask for an additional car to make up the tonnage because the stock car might not have the same weight capacity as a gon.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
TimGarland

Model Railroad Waybills in Operation

 

http://modeltrains.about.com/od/operatingmodeltrains/ss/Model-Railroad-Waybills-In-Operation.htm

Jeff,

Try the link above to follow a car on Ryan Kunkle's layout using his waybill system. The neat thing I really like about it is it designates a time when the car will become a bad order and need to go to the RIP track. Having a working RIP track on the layout gives us modelers a chance to tune up our equipment by checking wheel gauges and cleaning them or perhaps upgrading them with weathering or details. His waybill system may not be entirely prototypical but the way the cars move on them are. This includes cars moving to clean out tracks prior to being loaded by a customer. Paper service boxcars do this all the time. Something most modelers may not be aware of and is seldom modeled.

Tim

Reply 0
David Husman dave1905

Tab on car

Tab on car has its mechanical and visual problems (getting the tab to stay on a tank car, and affects the aesthetics of highly detailed cars). 

On the other hand its a really easy and quick way to set up a low impact car forwarding system.  The tabs aren't car specific, at most type specific.  Its a great system for modular layouts where the "fleet' is highly variable.  Its also very visual so its easy to 'see" where everything goes.  The limitation is how complex it can be, if you get too many codes, colors shapes on the tabs, the "secret decoder ring" to decipher where the car goes become difficult and it loses utility.  For a very simple layout, its a good starter method for operation.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
David Husman dave1905

Sequential system

Quote:

Try the link above to follow a car on Ryan Kunkle's layout using his waybill system.

Sequential systems are another oldie but goodie.  You have multiple movements in a sequence on the same "waybill" and then just move the car along the  sequence.  The concern with 4 move waybills is that a person will remember the sequence if there are only 4 moves, but not remember it if there are 10 or more moves. 

There are two basic types, the check box that Kunkle uses or else you have the sequence listed once then put a paper clipon the edge to mark teh step you are on.  My friend's dad was using this kind of system back in the early 80's using a tiny flat paper clip that librarians used to mark pages.  With Kunkle's system, the pack of cards/waybills is thinner.  You do have to reprint them every couple of years, but that's a pretty minor problem, and after a couple years the paper clip version would probably be worn out or ragged too

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Benny

...

Dave, I guess this explains why the industries mostly turned to the trucking industry, aye?

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
Virginian and Lake Erie

Benny you took the words

Benny you took the words right out of my keyboard. If someone I contract with sends me products I deem unsuitable for my use I will be buying from another supplier. You can bet a truck will have the load before the railroad can come get that car.

Many years ago I worked as a police officer and one of the other officers used to work for Conrail. He shared some info on how a certain yard operator did things till he got caught. This is in the era of private owner leased cars, which were paid for per diem to the owner of the car. The operator of the yard had his own car or owned part of the car. A local industry used this type of car, at this point I do not recall what type it was. The interesting thing was every time this particular car returned it was moved to be the next car loaded regardless of how long the other cars were there. It made a great many more revenue trips than the rest of the cars in the same class.

I always thought that was a rather interesting story. This was also the time period before the pc became the marvel it is today and the majority of things were done with a paper and pen or pencil. This may have been in the early to late 70s.

I cam not vouch for its accuracy just that it was told to me much the same way it was told to you.

Reply 0
David Husman dave1905

Dave, I guess this explains

Quote:

Dave, I guess this explains why the industries mostly turned to the trucking industry, aye?

Remember the pig iron example that started this was a load in the late 1800's, early 1900's so they would have to invent the trucking industry to shift their traffic to it, the interstate highway system is 6 decades away from being in service.  Plus what difference does it make whether its in a gon or in a stock car.  Either way your going to hire a half a dozen guys to schlep pig iron into the car and the customer is going to hire a half dozen guys to schlep the pig iron out of the car. Read some history.

Actually there is probably more tonnage moving by rail  now because the boxcar traffic transitioned to intermodal (which operates on a completely different model than the single car business) and the repetitive bulk business moved to unit trains.  Back in the 40 ft boxcar single car days, every fall there was a "woe is me" article in the papers about how the grain customers weren't going to have enough cars to handle the grain rush.  By implementing shuttle unit trains, better, bigger cars, better logistics, you don't see those stories any more.  The railroad can move more grain, faster, with fewer cars.  The cars are waiting on the grain, not the grain waiting on the cars.  Yes if you called the railroad today and told them I want a grain train this afternoon, it would still take the railroad a couple days to get power and cut of cars to the elevator, but that's NOT how things work.  The grain companies and the railroads put out loading plans weeks or months in advance so the railroad can keep cars up against the elevators.. 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
David Husman dave1905

Why?

Quote:

If someone I contract with sends me products I deem unsuitable for my use I will be buying from another supplier.

And why do you think a stock car is unsuitable to load pig iron (or any of those other commodities)?  Loading melons in a stock car was also very common.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
jeffshultz

Eras

Dave, 

Despite the hint provided by your signature line, I doubt most people don't default to thinking how things might have been done in the Victorian or early Edwardian eras... 

Not to mention the age of the robber barons. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Reply