Pull?
Railroads are really a "pull type system" in industrial engineering speak, where in the most simple terms, the demand from an industry is caused by the need to move "something" from "somewhere" to their customer "somewhere else".
Depends on where you are in the supply chain and where you are measuring it. All the industrial engineer and supply chain people I worked with considered teh railroad very much a Push system , especially from the consignee's perspective. A lot of modelers think the railroad is a JIT, on demand system because "the customer orders a car and ter railroad spots it". This harks back to the micro vs macro modeling perspective. If you are modeling an ISL or just one town or switching area, yes, it looks like that. If you go up a level or two, not so much.
The problem with railroads is that the time lag between the customer ordering product and the railroad delivering it is so long. Real simple example, coal trains. In Sept. 2008 a utility contracts with a coal mine to supply 12 million tons a coal a year for the next 10 years. The utility then enters int a contract with the railroad to deliver a million tons of coal a month for the next 10 years. The utility sources cars and the railroad sources power to support a million tons of coal a month.
The railroad gets paid when the coal is loaded into the car, so they are interested in loading as many cars as fast as they can to get their money as fast as they can. In the dispatch office the two worst chewings out I got were delaying UPS and delaying empty coal trains. In the dispatch system, an empty coal train was a higher priority than a manifest freight train.
The railroad is going to shove empties into the mine as fast as they can. Back in the days when coal loadings were running hot, both the BNSF and UP serve mines in the Powder River Basin and both serve some utilities. Both railroads keep "spare" sets of empties on hand in case the other railroad can't cover a loading with a set of empties, they can call the mine and inject a spare set of equipment into the fleet to "steal" a loading.
As soon as a train (or car) is loaded the object is to get the train (or car) to the consignee ASAP. If it was a true pull system then the object would be to get it there when the customer needed it. That's generally not what happens. The railroad tries to get it there and spotted as soon as it can. If you are standing at teh unloading pit of the utility, it looks really pullish, as soon as you order in a train it comes in. If you are the railroad it looks really pushish, there may be 5 trains backed up for the utility, sitting in sidings a couple hundred miles back or the utility might be gapped (no train) for a day or two.
If somebody orders a car of something and wants it spotted on Friday, and it arrives at the station on Monday, the railroad will spot it Monday. If the company doesn't want it spotted until Friday, the railroad will hold the car and charge the customer demurrage and a switching fee to spot it Friday. If you are standing at the dock on Friday it looks like a pull system, you ordered the car on Friday and it was spotted on Friday. If you work on the railroad its a push system, you wanted the car on Friday and the railroad had it ready on Monday.
Same with empties. If the railroad wants to be able to supply empties on demand that have to store a bunch of empties near by. From the standpoint of the shipper its a pull system, they ordered an empty and, poof, an empty was spotted. From the railroad's standpoint it was a push system, they were sitting on 20 empties a day for a month 1 mile from the industry.
The whole 'day minus 2" scenario you described is how it should work if it was a pull system. It doesn't really work that way. Transit times vary by days. There are all sorts of interruptions and delays. In Novembers in the northern half of the US, if there is a 50 degree swing in temperature (daytime 65 degr, night time 15 degr) when a cold front comes through, about 2 am the dispatcher's CTC display will start having track lights pop in. Broken rails. That will add days to the transit time of cars crossing that subdivison. Add in engine failures, holidays, heavy rains, the list goes on and on. The whole we order it on Moday, it gets there on Frigday thing is a cool idea, but rarely works that way.
You also have to realize that stuff is rarely ordered on Monday for Friday delivery. Cars are ordered weeks or months in advance, products are projected out weeks in advance. There is way more lead time involved (at least in successful operations).