I've included both names as I have seen folks address them with either name. I think what I am trying to create is principally a viaduct, but yesterday I inserted a bridge in a portion of it. I did it in a straight track portion, so I could alternately allow for it to be included in the final trackwork, or perhaps not.

The bottom deck of my layout is to represent principally the city Baltimore, home of America's start with the railroad industry. There is a neat stone arch bridge there in the suburbs, the Thomas viaduct that is even more famous as I read more about it. I wanted to include such a viaduct on my layout as a landmark representative of Baltimore.

I recently became aware that I had several photos I had posted of this viaduct that were not actually the Thomas viaduct, even thought they look very similar. One was a double track affair, the Thomas one, and one was a single track affair located in another state. I'll get into that later.

Turns out I have need of both a single track portion and a double track portion. How to construct them is another big question mark for me. I am making a mock-up using foamcore board right now, and it is presenting even more challenges than I originally anticipated.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

building of a stone viaduct in England

My 'British' neighbor send me a video reference on several historical RR reconstruction projects. I excerpted this portion referencing the building of a viaduct,..
https://youtu.be/u5HBgmsOY0U?t=1061

Reply 0
railandsail

City backdrop images

I believe I need to visit this discussion when I get ready to create that Baltimore City backdrop
https://forum.mrhmag.com/post/background-buildings-landscape-files-12215999

 

Quote:

And those sheets of foamcore standing vertical are no where near correct,...just spare pieces thrown up to approx the outer reaches of the Balt city scene. And that viaduct there is an older plastic one I happen to have laying around.

(I was originally planning on letting the Balt property line come out and cover that curved track exiting/entering the back wall. but there were some problems there with incorporating the viaduct directly into that 'property line' with the city, so I thought it best to put the city line in back of that curved track. I think I will now let that curved track behind the viaduct be one that is exciting/entering the 'harbor tunnel' of Balt)

 

DSCF4441.JPG 

 

 

 

Reply 0
railandsail

Cork Roadbed on Bridge

I am finally starting to lay track on the main deck of my layout, and I particularly wanted to settle some questions with items on my main deck before I reinstall the staging deck layers below it (better access for wiring, and try to limit the amount of drilling trash clogging up the finished staging tracks.

The stone arch bridge is one of those items in particular. I don't know that I will have time at this moment to fully finish the stone bridge, but at least I want to get the cork roadbed and track installed on the basic structure, and the feeder wire holes drilled and preliminary wired (creates sawdust trash, etc).

My dilemma,...my steel bridge portion, and the entry tunnel to the helix are all dimensioned to accept normal 3/16" thick cork roadbed. But when I went to look at the situation in a closer manner I was not real happy with that thickness being added to the top surface of my cellular PVC substructure,...what was I going to do mask the edge of that cork roadbed,...try to hide it with some sort of railing??

Here is what the prototype bridge ballast appears like,..


 

 

 

Maybe I need to think about raising the arch structures like this image?,..
-800x600.jpg 

Reply 0
railandsail

Shape of Arches, reminder

I'm revisiting this subject as I got to lay cork and track on the structure's base.

I need to remind myself of this interesting posting,..

Quote:

construction consideration

Fri, 2019-08-30 06:05 — prrfirefighter

If you look closely at the last color photo of the prototype that was posted, you can see that the arch structures themselves are all the same vertical height.  It is the base supports that change height.  You can cut the arches themselves using a master pattern since each one will be the same size.  You then only have to cut different height bases to match your grade.

i%20arch.jpg 

Reply 0
railandsail

Modifications

Yesterday I was asking for help to get some of these arch images to a correct size, and some of them at a reduced size as they descend the grade. I needed to determine how many, and how small these arches needed to be,...so I could go back and redo those vertical supports of the frame structure.

I've now chosen to utilize 6 inches wide for the upper arches, then two 5.5 inchers, then two 5 inchers, and finally two 4.5 inchers. 

I also determined that I want to utilize that second choice of a 'image master' that emerged after I first did these mock-ups,...this image
0posting.jpg 

I also like the stone post sticking up from the roadbed,...like the prototype viaduct.

25402-1.jpeg 

25615-3.jpeg 

In this view I've cut out all the interiors of the arches.
25709-4.jpeg 

And here you can see a few of those vertical supports that need moving
25803-5.jpeg 

 

Reply 0
Russ Bellinis

If you want the roadbed on the via duck without being

too high above the arches, remove the subroad bed that you put on the bridge, and put your ballast and roadbed directly on the bridge with just a single piece of styrene in place below the ballast to bridge the arches.

Reply 0
railandsail

3-D appearance

I believe this concrete 'curb' will mask the edge of the cork roadbed on the deck of the viaduct.

I also think I will try to make some sort of 3-d casting of those stone columns and glue those over the joints between images. That might make things appear more 3-d overall?

(3-D columns: maybe just paper copy bend over and glued to partial round of wood/plastic dowel?)

mage(69).png 

Reply 0
railandsail

(3-D columns: maybe just

(3-D columns: maybe just paper copy bend over and glued to partial round of wood/plastic dowel?)

That might make the upper stone post a rigid affair that could support real wire handrails strung between them??

https://forum.mrhmag.com/post/stone-arch-viaduct-bridge-12213517

Reply 0
railandsail

Video Ideas

Not sure that I ever posted these, but very interesting videos,..

https://youtu.be/5W4_n8HfSjc
 

 

 

 

Reply 0
railandsail

another video

https://youtu.be/4xAYjT9FJOM

Reply 0
railandsail

New Double Track Bridge

As I recently documented over here, https://forum.mrhmag.com/post/atlas-curved-cord-bridge-12217237  , I've had to construct a new slightly wider bridge for this viaduct structure. Luckily I had already planned a 2.5" C/L spacing for my 2 mainlines entering the ramp up to this bridge structure.

I've even been able to eliminate solid piece of pvc core board I had included under the original bridge idea. Now I can actually see thru the bottom deck structure as one might be able to do with a prototype structure.
01634-1.jpeg 

 

Now I want to thrown in another little curve ball idea. What if I made that bridge structure span one less arch structure,..like this
mage(71).png 

 

75340-1.jpeg 


When I was originally developing this combination of viaduct and steel bridge span idea, I approached it as though the viaduct was the original structure on this site,...ALL viaduct. Then industry and the future came along and needed a track passing under this viaduct,...one large enough to allow double stack container trains to pass under it. My steel bridge was going to have to replace some set number of full arches. The 18 inch span of that plastic bridge could replace 3 arch structures if the arch structures were 6" each,....thus my choice of 6" wide arch structures.

Now what if in this make-believe world the planners set their plans on a 3 span affair, and started construction on that steel structure,....BUT then decided that they really only needed to span 2 arches of the viaduct. Why couldn't that longer bridge be set down on the smaller cut out span in the stone arch structure??


Edited: Maybe I need to leave a little gap between the steel bridge bottom beams and the top of the stone arch structure (where it was 'shaved off') ?

Reply 0
Russ Bellinis

I'm not sure your back story would fit with reality.

I think it would take much longer to build up the stone arch than it would to weld up the steel bridge, so I think the viaduct would already be completed before the bridge was built.  However, who ever said we need to pay attention to reality?

Reply 0
railandsail

Stone Viaduct built first, then Steel bridge added

Russ,   I believe that was what I was trying to say,....

 

Quote:

I approached it as though the viaduct was the original structure on this site,...ALL viaduct. Then industry and the future came along and needed a track passing under this viaduct,...one large enough to allow double stack container trains to pass under it. My steel bridge was going to have to replace some set number of full arches

Reply 0
railandsail

Free bridge

If someone finds a need for it I am willing to offer that black dbl-track one for free,...just pay postage. (postage might be more than expected as bridge is 18" long)

Reply 0
railandsail

For now I have dropped the

For now I have dropped the idea for that extra span of the stone arch under a portion of the steel bridge.

I went back to determining the exact segments I wanted to divide this viaduct up into,.... then reconfirming the exactness of the grade, ....then laying cork roadbed on it. The desire to divide it up into segments was two-fold;   make it easier to handle on and off the layout,...and permit a portion(s) to be removed to get at that back corner in the future. So it shakes out like this:

90951-1.jpeg 

91042-2.jpeg 

1) the segment that connects the viaduct to the back wall (tunnel to helix). It also contains the 'wye' turnout, and the branch off to the other portion of the viaduct. It will have full depth cork on the 2 tracks leading to the helix as that's the dimension I already cut that hole/tunnel.  On its other leg leading to the single track portion of the viaduct, it will taper down to half that thickness cork roadbed.

2) the double track bridge itself that mounts into recesses at either end.

3) the top portion of the long run out that consist of stone arches. This portion's cork must taper down to zero cork height utilized on the final run out. This was a messy job, sanding that cork down to zero. Thank goodness i was able to do it outside on my work table.
91752-3.jpeg 

91832-4.jpeg 

 

92021-5.jpeg 

 

4) Then the final portion which will have a crossover set of turnouts mounted on its flat smooth surface.

Reply 0
railandsail

Locating Pins/Dowels

Up till now I have had the paper pattern handy to locate the portions of the viaduct legs, but that is soon to be cut away. I wanted to have a 'repeatable way to position the portions of the viaduct. At first I thought of steel pins, but then said why not wood dowel pins. I only need a few at the end of each span, and they only need to stick up a little proud into the viaduct legs,..
93206-1.jpeg 

 

93259-2.jpeg 

 

93337-3.jpeg 

Reply 0
railandsail

Grade Transistion Dilemma

I am working on transitioning one side of my stone viaduct down to mainline track level,...and it is very close to a turnout on the mainline track,..

94644-1.jpeg 

 

94957-1.jpeg 

 

The long Peco turnout belongs to one of the 2 mainlines, and is located right at the bottom of that fairly steep ramp at the end of the viaduct. As I was laying cork on the viaduct in preparation to lay track, I became very concerned about this grade transition,....was it too steep, was it too abrupt, was it too close to the turnout.

I went looking thru track design books this morning, then this discussion contribution by John Garaty,...
https://forum.mrhmag.com/post/turnout-on-grade-12216338
I was getting ready for some pretty hefty discussions to work this thing out, particularly as I had in the past on my old layout (Central Midland) experienced considerable grief with 'dips' and 'prouds' in trackwork. I DID NOT want problems here as a considerable number of my trains will be using this ramp, both going up it, and running down it.

I started out trying to lay straight edges across very track sections of this transition zone, and it was going to be difficult to photo potential problem areas. I subsequently decide to just try and run some locos thru it and see what happened. I got out a selection of 6 axle diesels that I figured would have problems here. The first one was a CSX Spectrum that I often used to find trouble spots on my old layout. Its trucks are NOT articulated, and its wheel flanges are real small. NO PROBLEMS
01019-2.jpeg 

01115-3.jpeg 

01150-4.jpeg 

 

Okay lets try a recent acquisition, a Genesis FP45
01345-5.jpeg 


How about this selection,....and MTH NS, a Proto DL109, a std Athearn,...etc

01535-6.jpeg 
 

01621-7.jpeg 

 

None of them experienced problems either climbing nor descending. I'm going to leave well enough alone for now, and move on with laying the track to the upper connection,...no radical transition there.  

Reply 0
railandsail

Laying Track and CUSSING !!

 
For the past several weeks I have been working on another portion of my layout, and I was fortunate to be able to work on that portion out on my carport work bench. We've had a real cold snap here in FL, so I decided to retreat into the warmth of my train shed and work on getting the tracks, turnouts, feeders, and segments of my stone arch viaduct sorted out.

I had mentioned before that I was dividing up my stone arch viaduct into 3 or more sections such that some sections could be moved out of the way to access spaces behind them. I was still unsure as to how I would be providing feeder wires to which sections, and where that would be specifically. I also needed to provide power to the solenoid on the Peco 'wye' switch up on the viaduct. Well I decided how I was going to do that, so now I needed to get busy laying that track across the bridge and into the tunnel leading to the helix,...should be pretty straight forward,...right??...not exactly !!

I believe I may have invented some new cuss words, or perhaps I just recalled some I had forgotten. At any rate I used quite a few.

One of the major problems is this opening in the back wall to the helix out back is about 40 inches across the deck from the edge of the aisle.
 


I needed to get two non-kinked tracks into the 'wye' turnout and get that short piece of track to mate up with the derailer located in the tunnel. Then i needed to get that all soldered together,...lots of fun...NOT. Trying to get nice flowing curves into short pieces of flex track is not that much fun,..its not like bending longer pieces of flex track. I ended up having to eliminate the two isolation joiners on the frog rails of the Peco turnout,...they were just to flexible. I finally went with metal joiners to get some rigidity. Then I can get the track glued down into nice non-kinked joints. If the insulfrog Peco presents any shorting problems then I will dremel cut an insulation joint in there.

It was also a chore to get those joints of the 2 tracks soldered up in that tunnel entrance. Finally had to give up for the day before I tackle other problems in this corner.
Reply 0
railandsail

Back to this Viaduct Project

I need to get some trains running,...at least on my lower deck,...for my sanity.

And for that I need to get that single track portion of my viaduct operational      (oops have to run an errand.....to be continued)

Reply 0
railandsail

Continued,...I need photo-shop help

Following my crude interruption yesterday here is a brief explanation of were I'm at this moment.

That single track portion of the viaduct at the rear of the layout is all one glued together structure that has one end up at its joining to the double track portion, and the other end down at it joining to one of the mainlines. It presently lifts off the layout deck as one piece,....BUT it is soon not going to be able to do that when I get the roundhouse and other items installed in front of it. Its time to get my stone wall facings installed on it, (and to get it be an operational track on my lower deck).

I've chosen to go a fairly simple route of having the images photocopied onto stiff hardstock paper, then cutting the individual arches out and mounting them onto my PVC foamboard substructure. Most of these arch images are going to be about 6 inches wide, with some a bit less as they reach lower heights. The methods are very much like that of the British fellow's videos I referenced not long ago in this subject thread.

I have at this time at least 2 images I would want to utilize as originals for the photocopying. ( I may have a 3rd or 4th if this one gentleman has offered to supply). I wish to make some slight modifications to both of these images,...to make them side-by-side compatible you might say.

I need someone with good knowledge/skill of photo shop editing to please give me a hand with these modifications, ...that I can then take to local Staples and get photocopied onto cardstock ??  Any volunteers?

 

 

 

Reply 0
eastwind

What's your best offer?

What's your best offer in dollars per hour?

I think you should start at least at $50/hr for what you're looking for in terms of expertise and skills unless it's someone doing charity or mercy work.

You can call me EW. Here's my blog index

Reply 0
railandsail

Avoid Duplicate Photos of

Avoid Duplicate Photos of Arches

Quote:

Maryland is coming off of house arrest in a few days and I'll want to head out with the camera again soon so if you have some particular views you're looking for I can see if I can get those for you.
Roger

Thanks for that offer. At the moment what I believe I might have need of would be several more variations of those 2 direct flat profile views I have listed as possibilities to paste on my cardstock,...such as that one that was just sent to me.  As Mark has said,...
 

Quote:

While that color picture may be great, making a dozen copies or more of the same one won't look so great. That photo has very distinct color markings on it, and if every arch had the exact same markings, it wouldn't look very good

 

I've been rereading this subject thread and ran across this offer of yours,...wondering if offer is still good?

I'm thinking it might be a good idea to have several different 'original images' to make copies from......whether they are several different photos, OR several different photo-edited photos??

 

 

Reply 0
bno4333

Offer

Sure. I plan to be in the area in early September, but I could make an earlier visit if I get a chance

Roger

Reply 0
railandsail

I am working on transitioning

Quote:

I am working on transitioning one side of my stone viaduct down to mainline track level,...and it is very close to a turnout on the mainline track,..

94644-1.jpeg 

 

94957-1.jpeg 

 

The long Peco turnout belongs to one of the 2 mainlines, and is located right at the bottom of that fairly steep ramp at the end of the viaduct. As I was laying cork on the viaduct in preparation to lay track, I became very concerned about this grade transition,....was it too steep, was it too abrupt, was it too close to the turnout.

I went looking thru track design books this morning, then this discussion contribution by John Garaty,...
https://forum.mrhmag.com/post/turnout-on-grade-12216338
I was getting ready for some pretty hefty discussions to work this thing out, particularly as I had in the past on my old layout (Central Midland) experienced considerable grief with 'dips' and 'prouds' in trackwork. I DID NOT want problems here as a considerable number of my trains will be using this ramp, both going up it, and running down it.

I started out trying to lay straight edges across very track sections of this transition zone, and it was going to be difficult to photo potential problem areas. I subsequently decide to just try and run some locos thru it and see what happened. I got out a selection of 6 axle diesels that I figured would have problems here. The first one was a CSX Spectrum that I often used to find trouble spots on my old layout. Its trucks are NOT articulated, and its wheel flanges are real small. NO PROBLEMS
01019-2.jpeg 

01115-3.jpeg 

01150-4.jpeg 

 

Okay lets try a recent acquisition, a Genesis FP45
01345-5.jpeg 

How about this selection,....and MTH NS, a Proto DL109, a std Athearn,...etc

01535-6.jpeg 
 

01621-7.jpeg 

 

None of them experienced problems either climbing nor descending. I'm going to leave well enough alone for now, and move on with laying the track to the upper connection,...no radical transition there.  

 

Wouldn't you know it , I ran all those engines above thru that transition portion of track,...and had NO problems. Yesterday when i was finally able to run some trains around this entire bottom deck, I had one loco that came to an ABRUPT stop. It was a Athearn genesis SD70MAC that keep hitting its snow plow on the transition joint. I've got 2 of these locos, and it looks like the snow plows are just too low??

(I even tried shimming the joint a little, and still CONTACT!)

 

Reply 0
jeffshultz

Sandpaper

Simply sand the bottom of the snowplow up a bit. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Reply