My layout, in a rather convoluted fashion, describes a big loop. Basically I did this because:
1. I wanted continuous running for when I was showing it off; and
2. I didn't think I had enough room for staging at both ends of the layout... so both ends became the same end.
As a result, I have tracks that jump an aisle. The first version of these involved a major passing siding terminating in a curved switch, at which point the track continued across a rickety (1 layer plywood) side-hinged bridge spanning the aisle.
The problems with this included the curved switch (a Walthers Code 83) not being in gauge somewhere, so stuff derailed when it hit it from the siding, and the track ends on both sides of the bridge were starting to get really wobbly, hanging out like that (yes, I cut the ends in the wrong places).
Obviously an unacceptable situation. Plus I wanted to adjust the entire siding to get it closer to the main and leave me a little more room for other stuff.
So...the bridge was unscrewed from the benchwork, the turnout and siding were ripped up... and I stopped to look at it a bit.
I upgraded the benchwork and built a much stronger bridge out of some scrap 1x4 boards I had laying around from a shelving project, as well as some other odds and ends (there is a piece of 1x5 3/4 composite decking material as the "landing" on the far side from the hinges) I had sitting around.
First thought - it's a bridge, let's put a bridge on it! Um.... no, that didn't work out. I had the center section of the swing bridge all foamed in, ready for carving into a mini-gorge, when I finally faced an ugly truth: there was no way I was going to be able to fit a #6 switch into the area between the current end of my mainline and the edge of the benchwork - where the bridge would begin. The siding was going to have to go on, or all the way across, the bridge. Considering the trackwork goes into a nearly immediate 2% climb past the bridge, putting in the switch on the bridge seemed the best idea. Still does, actually. So I ripped out the foam and built a 1x4 bridge across the gap...in the bridge. Sigh.
Fast forward - I've got the mainline all the way across the bridge. The switch is in place, with a ground throw on it. The end pieces of the track have been soldered to brass screws that were screwed into the benchwork on both sides of both gaps to hold them in gauge. A system for making sure the bridge closes in the same place - and stays that way - is in place. The rails were cut with a motor-tool cutting disc.
It's time to start the test runs.... um, why are those cars derailing on one end of the bridge?
The culprit appears to be three-fold: really small flange wheels on the latest ExactRail cars, one of the rail gaps being big enough (and with just enough of a curve in it) that the flange pretty much goes into and over it instead of following the rail around, and a bit of wonkiness with vertical curves between that 2% slope and the rail ends where the bridge begins.
Older cars, or ones I've rewheeled with Kadee, P2K or Intermountain wheelsets appear to have no problems with it all.
The wonkiness has been worked out by cutting the caulk under the track between the slope and screws, allowing it to level itself, and I've just glued a very thin piece of styrene to one end of the slightly over-gapped track (it would be fine except for the curve - don't put curves where you are going to cut track... ) that when it dries I'll file down to a more rail-like shape. We'll see how that does.
Photos in a bit.