jeffshultz

This year's NMRA Convention and National Train Show are being held in Grand Rapids, Michigan, which is north of Chicago and just enough east to be in the Eastern time zone instead of the Central, as Chicago is.

Getting here was a comedy of airlines that I won't go into, aside from saying that I spent 20 hours Monday and Tuesday in airports and on airplanes and I was very happy to be reunited with my luggage when I returned to my hotel this evening after dinner.

MRH Advertising Director Les Hamos and his friend Jean-Francois came down from Quebec as well (Joe and our new Advertising Assistant Daniel Navas will join us on Friday) and we all went to visit what is probably the most famous model railroad in Grand Rapids, as well as one of the most famous in existence: Bruce Chubb's Sunset Valley Lines.

Featured in Model Railroader within the past couple years, the Sunset Valley Lines is a group project on a grand scale. The basement it is housed in is actually larger than the house it sits beneath, extending beneath a porch and the driveway. I believe I heard one of the operators mention that it has 8 levels - I know there are at least 5. And it does this without a helix in sight.

The Sunset Valley Lines models Oregon and Northern California from Portland in the north (with connections to the north and east to staging) and Dunsmir in the south, including branch lines such as the Coos Bay Branch of the Southern Pacific and the Sunset Valley Oregon System, based on a planned but never built prototype railroad to Crescent City, California.

It is big. It is run by CTC (at least two panels). It has it's own phone system. And since Bruce is the inventor of theC/MRI (Computer/Model Railroad Interface) system, it is completely wired for detection and signals.

And for the week of the National Convention, pretty much any conventioneer could drop by and pick up a throttle. I manned a helper run between Ashland and Siskiyou in order to get a passenger train up the hill (Bruce, in passing, "You know it's illegal to have helpers pushing on the back end of a passenger train, don't you?"  Well... I do now.).

Here's some photographs of the layout and the people running it. (Note: uploading will be slow, I'm on a hotel connection and I'm still editing photos)

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Sounds like a new thread...

Rob,

I think you are right - this probably isn't the thread to discuss that - but since model railroad photography is definitely a popular subject it's appropriate for this site - so go ahead and open up a new topic. I think you might even have the start of a good "Reverse Running" column there.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Benny

...

I pray Chubb's House becomes a museum... I'm taken aback by jsut how much work has been done - and by how much work Remains To Be Done!

Quote:

So do you think we lost any thing from poor quality capture methods in the past during the transition from Film to Analog tape and into Digital capture?

We have lost the inhibition to carefully decide what pictures to take because there's only 32 pictures on the roll. we no longer carry a bag full of film, we have lost this too.  Heck, i no longer carry my camera in the bag, I just carry the camera - it's a Rebel XT.  Now we just take everything we can, and by golly, Ain't it AWESOME??!!!

As the cameras get better, we just get more to see...I'm ok with that!!

 

 

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
steamrailroading

CMRI

Doing CTC with less hard wire? What the switches just magically tell the system how they are set? And does this mystery system run the signals without wire as well? There is NOTHING on the market that can do all the stuff that CMRI can. To do a fully prototype CTC machine with route locking, traffic locking, and time locking. The Only answer is CMRI. And it can't be done with less wire.
Reply 0
mecovey

SVL fan

I've been a fan of the SVL since the 70s. this picture:

0_resize.jpg 

is astounding and impressive. It also explains why I can't wait for battery powered radio controlled trains.

 

 

20Avatar.jpg 

Reply 0
proto87stores

A bit misleading interpretation of the wiring picture

Probably 80% of that wiring is the connections between the CMRI micro computer I/O cards (2nd row down center left) and the various track occupancy detectors, signals and switch machines.

The throttle to track wiring for DCC is minor by comparison.

Andy

Reply 0
jeffshultz

That odd building in Grants Pass

Bruce Chubb explained it to us when we went back Saturday night - it's the Harry & David plant, which is actually in Medford, but which isn't modeled on the layout (it would be between Grants Pass and Ashland). 

It was a major rail shipper, especially around the holidays. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Peter Pfotenhauer

Amazing layout for sure. Was

Amazing layout for sure. Was looking at it in MR and MRP the other day for the umpteenth time.

 

You didn't by chance capture Albina Yard or the Steel Bridge from Bruce's layout did you?

Reply 0
Bill Sharp

Electrical Panel

That electrical panel is very scary to this old-timer.

Reply 0
jeffshultz

Albina & the Steel Bridge

I may have some photos of Albina Yard, but I don't believe I took any of the Steel Bridge (which is still under construction) directly.

Okay, just did a quick scan of my photos... and that corner of the layout, other than the Portland Union Station, I pretty much missed taking any photos of. Weird.

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
dpharris

NMRAnet, was: CMRI is just an early implementation of an ongoing

I, too, got to see Bruce's layout last week. My visit was all too short, but I was amazed. So many excellent scenes, functional operations, lounge, 'the woiks'. The pictures here are the best I have seen. I am from BC Canada, so the scenery certainly looked familiar to me, especially the big trees and logging scenes I was also impressed by the high-standards of the wiring -- obviously a very well organized layout.

I am a member of the OpenLCB / NMRAnet team, and want to say that the effort is (volunteer) modelers designing for modelers, in an open forum. It is meant to be the next generation network, hopefully useful for many years, using modern techniques, and transport independent so it can use future technologies. Most focus has been on using CAN (the bus system used in cars and industry) and Ethernet, but Zigbee and other wireless technologies are on the drawing boards. It includes assigned serial numbers to every node and support for both small layouts and beginners, and large layouts and experts, including museum and modular meets.

JMRI's relationship to NMRAnet is very much like its relationship to CMRI. While NMRAnet can talk to JMRI, and JMRI is useful for set-up, debugging and even operations, JMRI is *not* required for NMRAnet use.

Have a look at both openlcb.org and nmranet.org for more information.

David Harris

OpenLCB dev team

Reply 0
arcadia logger

Last of Grand Rapids Layouts

Jeff:

You ended your tour of Grand Rapids Layouts by saying that you would post the grand finale, Skip Luyk's logging layout but that would have to wait for tomorrow. Did you get them posted? I missed them.

Skip

Reply 0
Reply