Hmm, maybe not.
Hi all,
In response to
Quote:
And finally if the load for some reason is allowed to completely cool, the bottle itself is ruined. Trucks and such are recycled and the bottle is cut up..
My rely is "Maybe not". Back in the mid-1970's, a friend of mine was the ladle trainee for the 2 blast furnaces I was working on when he had a ladle go totally solid. I saw part of what followed as he went about salvaging the stone-cold solid torpedo ladle.
When solid, these beasts are way unstable when you try to tip them because the centre of mass of the solidified lump is higher than the centreline through the bearings as designed for with a liquid load. This centre of mas gets way outboard when you try to rotate the barrel. And the torpedo ladle will simply fall over on its side. So the first step in salvaging the ladle was to chain it to the track beside a sandpit on the opposite side to the sandpit.
The barrel was then rotated through about 120 degrees so that the lower edge of the spout was over the sandpit. For about the next day, a 6" gas line was flared inside the mouth of the torpedo ladle. This was to heat up the top of the solidified lump.
Then it was time for the oxy-lance. Over the next several shifts a hand held oxy-lance was used to melt/cut out lumps of formerly solidified lump. The big gas line continued to bore the heat into the top of the solidified blob. This provided the heat to allow the oxy lance to work faster. The process continued 24/7, regardless of the weather, until there was a significantly large sized hole in the top of the solidified blob. This took several days worth of continuous work on the oxy-lance.
When the hole in the solidified blob was big enough to take probably 50 to 80 tons of hot metal, then the process described by Bessemer Bob started. Here's what happened in a bit more detail.
The torpedo ladle was assigned its own dedicated locomotive. The locomotive's job was to shuttle this ladle ONLY between the steelmake shop and the blast furnaces 24 hours of the day. Crew changes were done where convenient. If the dedicated locomotive had to go for daily servicing (fuel, sand, brake travel shoe checks etc,) then another locomotive was assigned to take over its job until it got back from servicing. EVERYTHING got out of its way.
At the blast furnace, the loco on the furnace at the operating cast house would pull the torpedo ladle from the next spot to be cast and be clear by the time the loco arrived with the "hot ladle", and the shuttle locomotive would spot the torpedo ladle in that spot. As soon as the torpedo ladle was "full", the metal flow would be diverted into the next torpedo ladle. The locomotive would head of the the steelmaking shop. When this process was happening, sometimes the furnace had to be gunned back up before being fully "dry", because the full capacity of the torpedo ladle wasn't available for the amount of hot metal being cast.
At the steel making shop, the ladle would be emptied into the next available charging ladle. And the loco would head back to the blast furnaces. The difference between the "full" and "empty" weight at the pouring station told you whether you were winning or losing.
Each visit to the steelmaking shop should show a bigger difference between the "full" and "empty" weight as more of the solidified blob was melted. As more of the blob melted, more surface of the blob was exposed to the liquid iron, more heat got into the blob, which allowed more of the blob to be re-melted, and the weight of molten metal able to be fitted inside the torpedo ladle gradually increased. It took about a week or longer of the "shuttle" before the torpedo ladle was back in service at full capacity
The dedicated crews were probably on overtime and you also had the running cost of the "spare" locomotive that probably would have spent most of the week spent on the ladle shuttle shut down in the Loco Shed area, Yes the process was VERY expensive but it worked, and it was a whole lot cheaper than getting a new torpedo ladle made (even if it was actually possible to get a new one made to replace a torpedo ladle that was scrapped). These torpedo ladles are specialised rolling stock and only one firm in Australia had the capability to make them. If that plant was fully booked out and busy doing other stuff, then your chances of getting a replacement torpedo ladle any time soon weren't good, even if you could get the money for it.
Also the amount of capital money needed to buy a new torpedo ladle would probably have needed Board approval and may been above what the Works General Manager could authorise to be spent as a capital expense. However you could spend a LOT of money on the "maintenance" of a torpedo ladle gone solid to get it back into service without too many questions being asked by the corporate "bean counters" at Head Office.
I hope that this saga has been of interest,