jeffshultz

Okay, after three days of working out how the track was going to bend and cutting, laying and gluing (and sanding) cork roadbed, I got the track laid tonight. Since I'd been fussing with it all week, it went quickly with only a couple of last minute adjustments.

The view from the north end - before I'd laid (but it's not glued) the boxcar track:

_640x480.jpg 

The view from the south with the boxcar track pinned in place - since this track will enter a building, I don't want to glue it down until I've got the structures built. No reason not to keep the flexibility to adjust things until then.

_640x480.jpg 

You might have noticed that I added a tail track off the north end of the runaround. Two reasons for this - the first is that I had the switch, so making the runaround rejoin as a crossover eliminated some tedious cutting and bending of flextrack to fit. The second is that I can stick two woodchip gondolas or their equivalent down there either for "off spot" placement or in the case of a meet, I can stick a longer train on the siding than I otherwise might be able to.

The chip car track will fit 5 woodchip gondolas without a problem, but it wouldn't be very prototypical - since the woodchip dumper doesn't move, the cars must. So it's effectively a 3 car track - push them up all the way to the end and between now and the next pickup they get dragged south until they are all filled and ready for pickup.

The second door on the building will be an inside truck loading dock.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jarhead

Excellent

Jeff,

I think this came out very well. I am glad you thought of not glueing the track down to the building giving the you different possibilities  to model. A great idea !! I also love the idea of the tail track, to me that gives you more opportunities for switching plus what you said, you can stick a longer train on the siding.

Congratulations !

 

Nick Biangel 

USMC

Reply 0
Rio Grande Dan

The Top of your Layout?

Jeff is The top of your layout homosote with the cork roadbed glued to it or plywood painted lite brown or MDC it's hard to tell from the photos.

Rio Grande Dan

Reply 0
jeffshultz

Foam

My benchwork is (in that area) 1x4 lumber topped with 3/8's inch plywood with 2 inch pink foam on top. Then sort of a muddy green paint that I had was painted to the top to avoid my eyeballs ripping themselves out of my head in self-defense from all that bright pink.

Then cork on top of that. The last swich into the industry is actually on a piece of cork roadbed (one of the turnout shaped ones) that I sanded down into a slope so that the industry track itself is right on the foam.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
arthurhouston

MAN AFTER MY OWN HART

I love the logic for the switch for the tail track, outstanding.  I notice you made it to Lowes on the Friday after Thanksgiving for the shop vac special. 

All kiding aside this layout is on the its way to being an oustanding operation.

Keep the pictures comming.

Reply 0
jeffshultz

Christmas present

The shop vac was a Christmas present a couple of years back, but yes, I had asked my dad to grab it at the day after TurkeyDay sale at Lowes...

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
pdmus

Glue

Great looking layout.  What kind of glue do you use for the cork roadbed?  Do you use the same for the track?  How do you hold the track in place while the glue is drying - THANKS !

 

 

Reply 0
jeffshultz

Adhesive caulk

Normally I use transparent adhesive caulk to glue everything together, although I have been known to use white glue now and then. It tends to get brittle though, so I'm avoiding it now.

I will use anything and everything handy, from soup and paint cans to a 15+lb section of 1:1 scale rail in order to hold everything in place while it dries. If I need to spread the weight out I have a lot of chunks of composite decking material (that are pretty heavy in their own right) that are left over from a deck remodel I did a couple years ago.

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Reply