RSeiler

Attached, hopefully, is a sketch of my proposed benchwork design.  The bottom is basically a table made of 1" tube steel topped with 3/4" plywood and 1" foam insulation board.  The side over by the wall is pretty straightforward, the peninsula is more interesting.  Originally, I planned to weld the steel supports in one piece from floor to ceiling.  Now, I'm thinking construction will be much easier if I make the base, then add the T-shaped supports for the second and third levels as I go.  The placement of the upper decks supports is critical to avoid track, and will be much easier to do if I have a little wiggle room, which having them sit on the plywood of the deck below would give me. By themselves, the Ts wouldn't be enough, but once they are tied into the floor joists above I think it would be pretty solid.  I would likely space them about every 18" or so.  

What do you think?  

thanks

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
Ken Biles Greyhart

Bomb Proof?

I think 1" steel will be bomb proof.

Some thoughts off the top of my head:

  • Probably overkill structurally, but we build in what we're comfortable with.
  • Expensive, unless you know a dealer that will give you a discount. You're certainly not going to find it in your local Big Box Store.
  • Steel conducts, so wiring will need to be verified that it's not shorting out on the benchwork.
  • If you change your mind at any point after the benchwork is built, it's going to be tough to make changes.

I'm not trying to discourage you from using your material of choice, I'm just thinking about some of the down side compared to wood. It may work out fabulously for you.

 

 Ken Biles

adBanner.jpg 

 

 

 

 

Reply 0
akarmani

Concur with Ken

If this is the direction you go, I would take advantage of the strength of steel and minimize the number of legs at the front of the bench work.  It is amazing how often they get in the way.

Art  

Reply 0
RSeiler

Funny about the front legs...

I just re-drew that to add those front legs. I will have to use that space as storage, so the front legs probably aren't really going to detract much from the space since other crap, er... I mean, important stuff, will be down there anyway.  I've held them back from the front about 11".  I'd prefer to keep it open, but that aint happenin'.

My reason for the steel is that I wanted to keep the thickness of the upper deck to a minimum, as well as the space between the backdrops on the peninsula.  This is 1 1/4" thick in the center of the peninsula, and in some areas between supports I plan to have the backdrops touching so that it will be only 1/4" thick there.  I don't think I could accomplish these things in wood. I work with steel every day, so no problem on that side. I like that it is immune to environmental changes for all practical purposes, if the basement gets a little hot or cold or damp, the steel won't care.   

I have been questioning the 3/4" plywood, but every time I do somebody tells me a horror story about thinner stuff.  I would prefer 1/2" plywood, but don't want something that may cause problems.  Having absolutely reliable track is extremely important to me.  

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
kleaverjr

If benchwork thickness is the issue..

then building with 2x2 (true dimension is 1 5/8" x 1 5/8") metal studs on 1" Foamular 250 foam is all you need.  That is what we are using currently on my Club's O Scale layout and will be using on my own HO Scale layout and no issues so far.  I used that set up for previous versions of my HO Layout and it never failed.

As for protecting wires, using plastic grommets would be sufficient. I don't see the need for conduit pipe. 

Ken L.

Reply 0
ctxmf74

"I work with steel every day, so no problem on that side"

If you are comfortable working with steel and know all of it's drawbacks then it might be better than wood for you. I built race cars when I was younger and recently built some racks for my truck but I wouldn't want to build steel layout benchwork., it just seems more trouble to me than knocking something out with wood, but maybe that's because I can work with either material equally well. I'd be more concerned about the design that requires such thin framing as it implies too much railroad for that space. As for the 1/2 inch roadbed it is fine if you have the framing built correctly to minimize long unsupported spans. I used 1/2 inch on my new layout....DaveB

Reply 0
RSeiler

Re: thickness

I considered foam on steel without wood beneath, but I have been told by a couple of guys that tried it that they were not happy with the noise.  I also wanted some wood base in order to easily attach lighting for the lower deck.  

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
ctxmf74

"also wanted some wood base in order to easily attach lighting"

Yeah, a layer of plywood makes it a lot easier to attach things like switch machines, etc. No reason to leave it out on a shelf type railroad where the scenery can't dip down into deep canyons and where a little extra weight won't hurt anything and might stiffen up the assembly......DaveB

Reply 0
RSeiler

Too much railroad for the space...

Of course there is too much railroad for the space.    I thought that was the idea.  

Seriously, like most folks I don't have the room I'd like, to do what I want.  If I did, I wouldn't do a triple-deck design either.  I'd have a separate staging room, and the whole railroad would be on one level with at least 8' aisles everywhere.  If space were never an issue we wouldn't have multi-deck designs at all.  A multi-deck design is quite literally too much railroad for the space, thus the stacking.  I digress. To your point:

Any space taken up by benchwork width is going to deduct from my aisle width, therefore I want to make it as thin as possible. I think steel allows me to go substantially thinner than wood.  

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
Carsten Moeller

Vertical alignement

You should put the vertical supports of the different levels on top of each other. Then all the forces go down a straight line. According you your drawing you will have problems with twisting of the levels or you will need much additional material for stabilizing triangels.

Reply 0
RSeiler

Vertical alignment...

My track plan doesn't allow for vertical alignment of those supports.  If it did, I'd just have one continuous support. Do you think I will have problems even with it attached to the floor joists above?  Those verticals will be 1" square tube steel, 11 gauge, with 3"x3"x3/16" plates attaching them to the deck below. I am hoping that by having the upper supports attached to the floor joists of the floor above that the whole structure will be pretty stable.  

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
tonka

Steel Benchwork

Here are some pictures of steel benchwork we built for an addition to Lin Young's G&G.  The parts bolted to the walls are large 'E' sections welded up with 3/4 angle and tapconed to the block, the middle peninsula is 1" square tube bolted to the floor, with one section reaching the ceiling for support.  The end of the peninsula is a lally column with angle iron supports radiating out like spokes.  It has worked very well and saved a lot of space, plus was pretty quick. IMG_9455.jpg IMG_9457.jpg 

Reply 0
ctxmf74

worked very well and saved a lot of space, plus was pretty quick

and you didn't burn the house down:> ) ...DaveB

Reply 0
RSeiler

That's it!

Thanks for those pictures!  That is very similar to what I have in mind.  I planned to take all, or at least every other, support in the peninsula up to the ceiling.  The E against the wall is almost exactly what I have in mind.  Glad to hear it worked out.  I see the angles seem to be placed leg up, at least on the upper deck.  Why is that?  Did you put 3/4" ply on top?  I'd love to see more.  

Thanks! 

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
Steves VR

Re: foam and plywood

Randy,

rather than 1" foam and 3/4" ply have you considered 2" foam glued to 1/8" ply. The 2" foam is very rigid and the ply is handy for fixing turnout motors, cable clips etc. I have used this for a yard on my second level and am very happy with it, its light and strong. Just make sure you use a sub road bed, its noisy without it. No prizes for guessing how I know this .

Cheers

Steve

Reply 0
tonka

These pictures show some more

These pictures show some more of the construction.  The layout is on three levels, with the bottom levels (along the wall and the peninsula) used for staging yards.  In the second picture you can see the layout's owner Lin Young who unfortunately passed away a couple of years ago.  Also in the second picture you can see the supports welded in place for the top level on the peninsula.  The brackets on the middle level were inverted because it was faster and easier to weld them like that, one side was going to be on a long grade and supported by risers anyway, the other side was just 3/4 plywood with homosote over top.  the last picture shows some of the under layout details.  Lin was in the mining business at one time, so the layout is wired up with about 12 miles of blasting wire.  Anyway in the last picture you can see how things were supported a little better.

 IMG_9464.jpg IMG_9788.jpg IMG_4081.JPG 

Reply 0
RSeiler

Wow, thanks.

Those are great.  Sorry to hear of his passing, he was obviously a genius judging not only by his choice of metal benchwork, but also modeling the Chessie System. I am modeling the B&O/Chessie and PC in the mid 70s. 

Thanks, it is nice to see that someone else had the same idea and that it worked for him.  

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0
jhn_plsn

Decisions; permanant or....

I like the idea of using steal as a familiar framework, but the drawing leaves out many aspects of the layout like how you intend to transition between levels. Helix? Have you experienced one in real operational activities? There should be an open bar next to every helix during sessions. Nolix? Complicates the entire set up creating tons more planning. By all means if your comfortable with the steal and have all your grades and access checked then go for it. If there are any doubts you may want to consult others in the planning community to verify what your plans/goals are before you begin. 

Foam is great for many things, OK scenery, but for track support I would be careful. Once it is compressed it does not deflect and return leaving you to correct the roller coaster like effect. 2" is tough enough, but 1"=trouble. Think about it. Steal supports with foam between them. Think weak link.

Will you finish or enjoy for many years what you start? Will you want to make changes down the road? We model railroaders always think the last decision based on the latest technique (fad or not) is best for us, but consider all the possibilities just for a moment, Funny we will defend that decision to great length too. I am guilty of it.You?

If you go forward with this build quick and be sure to have scenery and structures to support your plan. Otherwise you may lose interest and the cutting torch will have the last word.

I do hope you the best regardless how you take my writings.

This is an added section as I did not see the post with all the photos. I am sorry to hear of a model railroad buddy that had passed on. They are hard to find and I am sure Lin will remember all those involved on his project well.

 

JP

Riverside CA

 

Reply 0
tonka

G&G experience

The steel work we added to the G&G was for an expansion to an operating railroad which had been running for almost 20 years.  When the first part of the railroad was built track was run up to a wall separating rooms to connect to the planned addition.  Here is a link to the G&G website which tells more about the layout. 

http://graftonandgreenbrier.com/

When it came time to build the addition I lobbied for steel benchwork because we were trying to keep the cross section of the decks as thin as possible and didn't want to have to build out from the walls.   I believe that shelving brackets would achieve the same thing, and would give some added flexibility, albeit at greater cost.  In our case it was easy and cheap for me to weld up the brackets in my shop and then use a laser to 'paint' a line on the wall to level them, we had them installed in one evening I think.  I had predrilled all the steel so all we had to do was drill the block and run the tapcons. 

The steel work for the peninsula was all fabricated on site, a minimal task involving chop saw a welder.  I already had experience with working with metal, so this was easy for us.  If none of our group had had experience with steel I doubt we would have gone this route.  The addition is on three decks (two decks of layout and one deck of staging) connected by means of a fairly complicated helix.  Careful planing went into building the helix after a track plan had been drawn up on 3rd planit.  The helix contains two tracks going to staging, which represent different railroads going to different staging yards, and also inside the helix are some staging tracks at the top and a 'loads in empties out' coal mine/power plant combo about halfway down.  The helix was designed so that when a train enters the helix if you stand there it will come back out on the same side as it went in, so that you can easily follow your train as it heads around the layout. 

We continue to operate and build on the railroad since Lin's untimely death.  His widow has made sure that we can keep his railroad going in tribute to the fellowship and friendship that he provided many of us for many years.  I count among my very best friends those who I have made at the G&G.  If you guys want I can provide more picture of the layout as it has progressed.  Scenery work has slowed as we do not meet as often as we did, but we still have plans to try and get major scenery competed.

 

Jim Trivett

 

Reply 0
RSeiler

Love to see more pictures

Heck yeah, I'd love to see more pictures of the layout.  Fascinating stuff, especially for a guy planning a layout with two visible decks, one staging deck, a helix, and using steel benchwork supports. Its like looking into my future.  

thanks 

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 0