eastwind
My layout is double track around the walls. The room is irregular, and it ended up best that I have my one 'blob' for a reversing loop kind of sticking out from an inside corner of the room. This lets me have reversing loops in either direction, so the layout can run as a dogbone. 
 
I'm looking for the best way to set up the reversing sections so as to support the longest possible trains. Since the layout is double-tracked, I don't really have sidings limiting train length, the reverse loop section is going to be my limiter.
 
 
Here's the section of the track plan in question. The grid is 12", FWIW. Scale HO. The irregular line to the "northwest" is the room wall.
 
The idea is that the mainline is double tracked, but this is the end/beginning of the run. For coontinuous running, the mainline splits at this point, with one track taking a short-cut close to the inside corner, and the other track swinging wide around the outside of the blob. The inner track of the blob is for turning trains around. 
 
Sorry about the short lines perpendicular to the track, that's a 3rd planit thing, they show where each section of track begins/ends. I couldn't figure out how to turn them off for this screenshot.
 
The crossing is a simple crossing, not a slip switch of any kind.
 
reverse loop.jpg

You can call me EW. Here's my blog index

Reply 2
eastwind
Here are two options that I think will work (please advise if incorrect);
 
Option 1: Includes the turnout at the end up to the diverging ends of the turnouts.
 
option 1.jpg
 
 
And option 2, making the reversing include as much as possible:
 
option 2.jpg
 
(The plan shows the crossover at the bottom of the blob at about 6 O'clock. When drawing it out on the benchwork and building the custom turnoout, it moved a little. It's actually a bit farther around, more like 5 o'clock, so the reversing section is a little longer than the plan shows. )

You can call me EW. Here's my blog index

Reply 2
eastwind
The crossover itself needs two reversing sections. I've drawn the two options with one big reversion section, not counting the two included in the crossover. But if someone has a plan that would be better somehow but requires a total of four reversers (two for the crossover and two for the blob) I'd consider that, the cost of an extra reverser isn't going to kill me, and they might come in pairs anyway, depending on what I buy. Which I haven't yet.

You can call me EW. Here's my blog index

Reply 1
kenheywood
And option 2, making the reversing include as much as possible:
Option 2 ... longer trains.
Reply 1
David Husman dave1905
Option 2.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 1
anteaum2666
Another vote for Option 2.

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 1
eastwind
Alright, option 2 it is then. Thanks for the confirmation.
 
One thing I was worried about with option 2 is that the crossover has two small reversing sections that flip according to which way a train is driving through it. Option 2 means I have those small reversing sections in the middle of the larger one. 
 
The worry is that I could get a reversing storm as the two reversers battle each other. Will I be ok as long as I give the reverser for the crossover a faster trigger than the big loop reverser?
 
If not, option 3 would be to stop the reversing section short of the crossover on either side. 

You can call me EW. Here's my blog index

Reply 1
David Husman dave1905
One thing I was worried about with option 2 is that the crossover has two small reversing sections that flip according to which way a train is driving through it. Option 2 means I have those small reversing sections in the middle of the larger one. 
Explain.  How do you have two reversing sections in it?

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 2
eastwind
Ok, my wording wasn't clear. What I meant was two sections of track hooked up to an autoreverser - not that the train reverses direction.
 
Here's a picture of my crossover (from the thread where I blog my build of it):
 
20240322_011436.jpg
 
This shows the different power sections colorized:
 
edited 2.jpg
 
As trains go through the crossover on one line and then the other, the yellow and green sections need to change polarity. They will be hooked up to an autoreverser module. This is just the way fast tracks crossovers are gapped.
 
So if the black and red rails are part of the big reversing section, that is itself hooked up to an autoreverser, as a train goes through the crossing you have a situation where a wheel is shorting a gap between two sections that are each powered through an autoreverser module.
 
The question is whether in this case, that can lead to a problem, and if so, can the problem be fixed by tuning the speeds that the reversing boards recognize a short and trigger.

You can call me EW. Here's my blog index

Reply 2
David Husman dave1905
As long as the auto reverser is hooked up to the reversing section and not the bus, it ought to be OK.  Since it's buried in the reversing section you want it to reverse the frogs relative to the reversing section, not the main bus.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 1
eastwind
Will it be ok on the subsidiary reverser when it sees its input power reversed by the primary? I'm not an EE, I'm just wondering if something like that would make the reverser unhappy, perhaps over time?

You can call me EW. Here's my blog index

Reply 1
Wazzzy
If you have a reversing section within another reversing section (X-ing within a reverse loop in your case), the secondary reversing (x-ing) will need to have a trip rate faster than the primary reversing section. The 2 auto-reversers will be in competition with each other for correct polarity (phase). 
 
It might be easier to NOT have the crossing and the two branches leading away from the crossing (top right & bottom right leading towards the main line) part of the primary reverse section.  The x-ing (with its auto reverser) and these two branches can just be part of the main line power district.

Alan Loizeaux

CEO Empire Trackworks  (Empire-Trackworks.com)

Modeling ON30 DRG

Husband, Father, Grandpa, Retired Military, Conductor / Yard Master Norfolk Southern, Owner Empire Trackworks (S, SN3, On3, On30, On2, HOn3, O 2-rail & others)

Reply 1
eastwind
Thanks, that's about what I thought. The immediate need for a decision was really only to select the color of feeder wires. So I went ahead and assumed I'd be embedding the crossing in the reversing section, as per option 2. If it turns out to be problematic in practice, I can shorten the reversing section to stop just short of the crossing, and power the crossing (and it's reverser) from the main bus. 
 
I'll put in electrical gaps at the ends of the crossing shown above, where it connects to the flex track, so I can switch things later if need be just by rerouting the feeders. 

You can call me EW. Here's my blog index

Reply 1
thewizard1
Something to keep in mind if your running a lighted caboose the whole train must fit inside the reverse section.
The only thing I have mastered in life is how to spend money
Reply 1
dperry
EW, interesting topography.  I'm kind of 'noodling around' with some ideas, just to see if I can restart my brain after several years of retirement :-).  
 
I have a couple of questions about how you plan to operate.  My expectation is that through trains would be expected/required to take the 'cleanest' path: trains on the right main would not get to do a loop-de-loop on the reversing section and, likewise,  trains on the left main would not get to take a shortcut through the reversing section.  If that is the case,  do you plan to implement engineering controls to enforce the rules (interlocks on throwing switches, and such)?
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 0
eastwind
Well, I'm not big on operations, but to the extent I had a plan, there wouldn't be any through trains in this area for operations. The 'through' paths, either close to the corner or out around the blob depending on direction, would just be for continuous running / railfanning. For operations trains would start or end here, but not work through. The whole blob can be thought of as off-stage for operations, both off-stage to the east and off-stage to the west.
 
The double track goes all the way around the room, with whatever industries I put along the path, and all that is intended to be realistic as far as possible, though I'm not modelling any specific location, just trying to replicate the feel of a double-track main line with industries along it.
 
If I get to automations, the reverse loop with crossover will be granted to one train at a time, no matter which direction the train is coming from, they'd have to have the reverse loop and the crossover cleared for them before entering. So, like you thought, no train would do a gratuitous half-figure-8 and then continue on in the original direction. Logically there are three 'states' - Through, which can clear two trains at once (one on the outside, one on the inside track), reverse-east and reverse-west. If the reverse loop is allocated to a train, all other trains approaching must stop short of the first turnout they come to and wait.
 
I haven't tried to figure out if I can drive all six turnouts and the signaling for the whole ball of spaghetti from one arduino. That's long in the future.
 
The whole thing is about getting the continuous running options I wanted and not about realism or prototype, obviously.  I realized that my railfanning goals required some spaghetti, and I resolved to put it all in one blob to minimize space spent on blobs and to preserve the rest of the layout for non-spaghetti semi-prototypical track layout. I wanted to go around the room with continuous running, and I wanted to be able to turn trains around, that's about it.
 

You can call me EW. Here's my blog index

Reply 1
dperry
Thanks for that explanation.  I kind of figured that was what you intended but it is good to have it confirmed.  The rest of this has nothing to do with autoreversing, apologies in advance if I am straying too far off topic.  Or overly rambling.
 
You mention six turnouts, but I tend to think of crossovers as a single entity) as I can't think of a real good  reason to throw only one half of a crossover... ) leaving four switchable units (in my way of thinking).
 
Putting the Arduino aside for the moment (the larger Arduinos have lots of pins for control, lots of memory for big programs and I suspect they all have enough speed to run whatever you need for this area) I started thinking about how the switching could be controlled with simple pushbutton switches and a relay or two.  Or three.  Given that there are three mutually exclusive paths (I'll call then E, W and T)  involving multiple turnouts,  I'd be tempted to make the 'user interface' three pushbuttons with a light over/under each to show which path was currently set.  Simplicity of operation so I wouldn't make a mistake and, more so, if I ever had a friend over to play.
 
This would work for stall motors (Tortoises) and for servos with driver boards controlled  with a toggle switch.   Solenoids would require a bit more hardware - maybe one more pushbutton - and naked servos (no driver board) could swap the mechanical middle layer for a baby Arduino which would generate the PWM to move the servo and also implement the logic.  Same user interface in any case.
 
I think I have more thoughts but it is late and my brain is starting to fuzz.  It is an interesting control  problem and I like your solution to the train movement requirements.
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 0
kenheywood
I started thinking about how the switching could be controlled with simple pushbutton switches and a relay or two.  Or three.  
You could use a controller like QuadLN_S if you are running Loconet.
The Quad can control 4-16 servo or Tortoise turnouts, pushbutton or toggle fascia controllers, and can configure routes.
With routes running in the module, one button press could align all turnouts to a selected route.
 
I use servos for my turnouts and with that, a single port controls my crossovers.
The two crossover servos (one on each turnout) are driven by one port using a splitter cable.
My blog covers my personal turnout journey.
Reply 0
eastwind
The thread evolution is fine, I have gotten my answer for the original question. 
 
I haven't decided much yet about control, whether to run loconet for example is something I haven't thought about any. I have vague notions of wanting to automate the layout someday, but at the rate I'm going I may never even get it built, so I'm not worrying too much about that yet. 
 
I was planning on using servos. 
 
While I think the requirements could be handled in all-hardware (relays and driver boards) I think it's likely easier to use software to specify the routes and the turnout positions for each route. 
 
I should further describe my plan for this area - I'm also going to use this blob for a helix. The helix will be separate from the tracks shown above, which are all a layer beneath the helix and not directly connected to it. There will be a separate approach track to the helix from either direction that rise up above the reverse loop layer and then keep on going up around the helix. 
 
For operations, the helix serves as staging (it will be 4-track multi track). Or the train could continue through the helix (boring for operators) to the top and then once around the room on the upper layer before ending in staging in the helix headed down. 
 
So there isn't a reason for the through-route for the reverse loop to be part of operations at all, really. The main function of the through routes will be for rail fanning on the layout before I get the helix and upper layer built. 
 
I have a plan I'm working on in 3rd planit, but building the helix in 3rd planit is where I've gotten stuck, so the plan isn't complete, but it's complete enough to build the first phase of the layout.

You can call me EW. Here's my blog index

Reply 1
dperry
You could use a controller like QuadLN_S if you are running Loconet.
The Quad can control 4-16 servo or Tortoise turnouts, pushbutton or toggle fascia controllers, and can configure routes.
With routes running in the module, one button press could align all turnouts to a selected route.
 
I use servos for my turnouts and with that, a single port controls my crossovers.
The two crossover servos (one on each turnout) are driven by one port using a splitter cable.
My blog covers my personal turnout journey.
That controller sounds a good solution.  Setting routes up ahead of time so you don't have to think about them later seems like a big win.  Particularly when there are a number of turnouts involved.  Do you have a link to the product?
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 0
kenheywood
That controller sounds a good solution.  Setting routes up ahead of time so you don't have to think about them later seems like a big win.  Particularly when there are a number of turnouts involved.  Do you have a link to the product?
N3IX Engineering ... QuadLN_S
Reply 2
Reply