eastwind
Well now I've done it...
 
I wanted a drill press, and not just a mini hobby one, but one that could drill holes in 14 gauge steel, for steel benchwork and other things. I read reviews, and I think got a bit dragged off of what I really needed by the marketing, and bought something that turns out to be bigger and heavier than I expected. But I'm not sending it back...
 
I got a 12" Bucktool drill press. It's supposed to weigh 90 pounds. Seems like more than that in person. I had had notions of using it on my workbench, and moving it bakc and forth to the floor when I didn't need it. That's not happening, I don't think I'd be able to get it back on the workbench once its on the floor. I don't want to eliminate my ability to carve up 4'x8' sheets on my existing workbench, so I'm going to have to build a stand for the drill.
 
At first I was thinking that such a stand would have to be the size of the base of the drill press, with legs that splayed out a bit for stability. Now I'm thinking that as the head of the press extends back from the column, which is toward the back of the base, I need the table to extend back from the base as well, and maybe I should build it with a larger top and straight legs rather than the angled legs I'd imagined at first.
 
So what do you people think about the design of a table for a drill press? Unless steered otherwise, I'd use 3/4" plywood for the table top, and dimensional wood for the table top rim and legs. Shouldn't be too hard to knock something together. Maybe I want to use leg-levelers on the bottoms of the legs to be able to get the top perfectly flat? I don't know how close to perfection I'm going to need the leveling to be.
 
And what height? I figure I should pick a comfortable working height for the press's table when the table is all the way down, maybe 30" off the floor? Assuming me standing (I'm 5'10" and shrinking). The tabletop would have to be a good bit lower than that, I haven't measured the distance from the press table to the base when it's all the way down the column (because I haven't assembled the press yet) but probably about 12" plus or minus a few.

You can call me EW. Here's my blog index

Reply 3
eastwind
I got out and bought wood today. It's hit or miss whether I can find good dimensional lumber but I was in luck. It's sort of a 'thing' in Mexico that if a city has several identical businesses they tend to cluster together in a zone rather than spread out. Most of the lumberyards in Cancun are on this one  street in north Cancun. It does make shopping a little easier if you end up going from place to place, so I like it.
 
I usually start at this first lumberyard, because that's where I initially found what I wanted several purchases ago. But they seem to have ceased buying first quality dimensional lumber. They have unfinished construction grade only, but lots of good plywood sheet choices. Next door (literally) is the place that I've been having good luck buying dimensional lumber lately. Today they were flush, with pallets of 1x2, 1x4, 1x6, 1x8 and 1x10, all 'primera'. Amazing. 
 
Lumber is sold here rough cut, then all these places have planers and table saws and will fix you up for just a few pesos more. So I got 5 1x4's at the one place and a sheet of plywood at the other. 
 
I don't worry too much about the price if I can find good quality stuff, but I paid 530 pesos for the 5 1x4s. The price was 92 pesos plus tax, and that includes the planing, so I don't know how much that was (VAT tax here is 16%).
 
The other place I got a 4x8 x 18mm sheet of oak plywood. They had other choices as well, poplar, pine of course, and parrot wood. It's just the outer plys, who knows what the inner plys are, but whatever, it was beautiful looking wood. Too nice for a workbench, but I didn't want knotty stuff. 
 
I had them cut it into 4 pieces. Rather than giving measurements, I just drew a sheet and 3 lines across it to make 4 pieces of 2'x4' roughly, and said '4 pieces the same'. The guy with the table saw set it, cut off 3 and then shaved a kerf-width or so off the edge of the 4th to make it identical. They charged me for 3 cuts, even though he really did 4. At 2.5 pesos per cut that's around 15 cents per cut. Can't beat that, and it made it easier to carry.
 
I plan to use 3 pieces for the top and 1 for a lower shelf (might as well), and make runners out of the 1x4, upper and lower. 
 
The guy running the planer did a crappy job, there are spots where he didn't set it to take enough off and the surface is still rough. I think I can deal with it, though I don't have a belt sander, I'll have to use a drill with a sander wheel instead. For a workbench it will be ok.
 
The sheet of plywood cost me just over 1000 pesos with tax. , it was 867 before tax. 
 
Last week the peso was at 16.5 to the dollar, but it had a mini crash this week and is now 17.5, so all this represents about $90 worth of wood, give or take.
 
Which as some of you will point out is a lot more than the cost of a pressed-aluminum stand from harbor freight, but it's also going to be a much more solid workbench 2'x4' and 24" legs plus the thickness of the top (3x18mm).
 
Here's how I plan to construct it: Just like one I've already made for the laundry room, except I'm not going to paint it this time. 
 
I'll have to cut down one of the shelves to fit inside the legs for the bottom. If it turns out that the 4 pieces aren't all exactly the same, I can use the smallest one. The legs on the laundry-room table are not 1x4, they're 1x3. I will need to do a little ripping with my track saw to get the 1x4's I bought to an equal width, but the result will still be somewhat wider pieces than the one below. The one shown doesn't flex when I sit on it, and I weigh far more than 90 lbs...
 
20230702_222434.jpg
 
I'll try to remember to post a pic when I'm done.

You can call me EW. Here's my blog index

Reply 7
eastwind
The table saws at these places, though, give me the heebee jeebies. They run them with no blade protection, and the blade up around 4-5 inches. They don't turn them off when adjusting the fences. They are huge table saws, designed to easily slide a 4x8 foot sheet through with an 8 foot wide sled. But for that last trim cut, the guy was sort of reaching over the blade with his arm above it, because his standing position is to the left of the blade (with the fence to the right). Yikes. Hard for me to watch. And he wasn't using any kind of a pusher stick, either. Do that all day every day for years and it seems to me you're sure to lose something, like half a forearm plus the hand, not just a finger or two.
 
The guys each have a helper to catch wood coming off the other end, which I hope improves safety. That guy also carries your pieces out to your vehicle for you (and you tip him a few pesos). It kind of bothers me how much risk they are taking and how little they charge for the cuts. The place I got the plywood had four big table saws going. The one next door was selling less plywood, and only had one table saw, run by the same guy who did the planing for me.

You can call me EW. Here's my blog index

Reply 4
Virginian and Lake Erie
EW, if possible I would add some leveling feet to that bench so you can get it level regardless of your floor situation. Not sure if you can find them but you might also be able to find some leveling casters with brakes so you can easily move it around when needed and lock it in place. The added benefit is it will help prevent the end grain of the legs from drawing moisture and rotting.
Reply 3
Kevin Parson SeeYou190
eastwind Wrote: "The table saws at these places, though, give me the heebee jeebies. They run them with no blade protection, and the blade up around 4-5 inches."
 
I belonged to a woodworking club in Fort Myers for a few years. Their table saw was similar, and I never used it.
 
-Kevin
Living the dream and happily modeling my STRATTON AND GILLETTE Railroad in HO scale. The SGRR is a freelanced Class A railroad as it would have appeared on Tuesday, August 3rd, 1954, in my personal fantasy world of plausible nonsense.
Reply 2
ICtom
20231206_082943.jpg
 
We had some cabinets left over from our kitchen renovation (warped or damaged in some way), so I installed them out in the garage as a drill press station.  A warning to some of you mentioning plywood as a top - glue two sheets of 3/4" together!  I just have a tiny drill press (10-inch Delta DP-200) and believe me, single 3/4" - even this cabinet grade stuff - is not enough for the long haul, IMHO.  Even with two glued sheets at 1-1/2" total thickness, the force and vibration that runs through this table top while the press is running is impressive, to say the least.
 
I saw some pics here where a 3/4" top was supported by 2x4s.  Maybe the 2x4s support the load a lot better, but cabinetry has very thin edge work upon which to mount the top.  I used glued and screwed gussets all around on each of the three cabinets shown here and like I said, the force running through the cabinet while the press is running is impressive.
 
There's nothing out of round on my press, either.  The power switch is a little whopper-jawed, but that's because they stopped making the switch housing for these Delta drill presses.  For years, I carried the press around from one concrete pad to another for work, often grabbing it by the switch box on one end and finally ripped it off one day.  I finally found a replacement at a metal working supply shop, but the mounting holes were ever so slightly off.  
 
The plywood resting on the drill press table was my start at making a drill press fence.  I finished it and will be using it with a stop block to drill the wiring holes in all my benchwork's cross-members.
Reply 3
porthos
Try Craigslist for your area or see if Habitat for Humanity has a Re-Store. Both are good options for finding odd cabinets and the like.
Kris
It's not denial. I'm very selective about the reality I accept. -- Calvin (Calvin & Hobbes)
Artificial Intelligence is no match for natural stupidity
Man will occasionally stumble over the truth, but most of the time he just picks himself up and stumbles on. -- Winston Churchill
Tardis Express: When it absolutely, positively, has to be there yesterday.
Reply 2
eastwind
EW, if possible I would add some leveling feet to that bench so you can get it level regardless of your floor situation. Not sure if you can find them but you might also be able to find some leveling casters with brakes so you can easily move it around when needed and lock it in place. The added benefit is it will help prevent the end grain of the legs from drawing moisture and rotting.
I will look into that. The L-shape of the legs makes it a bit harder than if I used a 2x4 or 2x2 for the legs. Maybe I can attach blocks to the inside of the 'L' at the bottom of the legs to make them rectangular. Not sure that would take the weight well though. Maybe I need to change my design.
 
My other workbench needed to be mobile, so I ordered some lifting casters from amazon. They have a foot pedal which you press down to lower the wheel and raise the leg off the floor a quarter inch. So I could get something like that, but there's no levelling feature in those. 
 

You can call me EW. Here's my blog index

Reply 2
David Emery deemery2
I will look into that. The L-shape of the legs makes it a bit harder than if I used a 2x4 or 2x2 for the legs. Maybe I can attach blocks to the inside of the 'L' at the bottom of the legs to make them rectangular. Not sure that would take the weight well though. Maybe I need to change my design.
 
My other workbench needed to be mobile, so I ordered some lifting casters from amazon. They have a foot pedal which you press down to lower the wheel and raise the leg off the floor a quarter inch. So I could get something like that, but there's no levelling feature in those. 
For a small stool I did for my wife, I put square blocks at the bottom of the L shaped plywood pieces.  That provided rigidity and a good base for the slider pads I put at the bottom of the 4 legs.  
 
dave
Modeling 1890s northeast US
Reply 3
Virginian and Lake Erie
EW , you might wish to add a 2x4 between the legs front to back and drive some screws through the legs into the 2x4. This will do two things, give you a strong and stable base when moving and make it easy to attach the casters or leveling feet which ever you decide to use.
Reply 3
eastwind
Thanks Rob, I am going to have a shelf just above floor level (see the pic of the red/white one above). In that one, the supports under the shelf are 1x3's. 
 
I have been planning to do the same with the one I'm building, but you're making me think about using 2x4's instead. I'd have to go buy them, but that's not a big deal. 

You can call me EW. Here's my blog index

Reply 3
eastwind
I decided to go buy more lumber, looking for 2x4's for the table frame instead of 1x4's for a beefier heavier table. The lumber shop didn't have prime quality 2x4s, unfortunately. They were sold out, except for one leftover piece I saw stacked in a different pile. They did have 2x6's and 2x8's and 2x12's. The quality was marked prime, but not really as good as their prime 1x4's, it had a few knots or bark edges on all pieces that I could see.
 
None of the prices were marked, and since I only needed two 2x4's, I decided just to buy one of their 2x8's and rip it with my track saw. I found a decent piece, only a couple knots and one corner of one end was bark for about 2', but I figured I could trim that off - the boards are actually 99" x 8 3/4" or so rough cut. I had them plain it and the guy did a better job with the planer than my previous batch from the same lumber yard (different planer operator). After planing the board was an inch and 9/16ths thick. 
 
But they charged me about US $20 for this one board with the planing. Don't want to do that too many times. I think two 2x4's would have come out cheaper if they'd had them, but maybe by only two or three bucks.
 
I got it home and have been having trouble with the weather. There was a tropical depression that came through here and just wouldn't leave. It sat around in the gulf of mexico off veracruz for a couple days before turning into tropical storm Alberto and heading off toward Texas where it's caused lots of coastal flooding. Finally today I chanced moving my cutting table out onto the balcony to rip the 2x8. Shouldn't have tried. I ended up getting the table wet (the top is MDF, so that's not good)
 
I did get one edge trimmed, the center rip done, and the edge on the offcut side of the center rip trimmed, but I didn't get the final rip cut that would set the width of the second piece.
 
This is the first time I've wished I had a riving knife on my track saw. It bogged down and I got some kickback a couple times (not enough to lift the saw blade completely out of the cut, but enough to lift it an inch off the rail). I ended up taking the dust bag off and letting the sawdust blow all over the place, that helped me avoid further kickback. The kickback and some starts/stops along the way that made the cut uneven was why I had to shave another 1/8" off to clean up the edge. I had measured for 10cm wide. With the design of the table the width doesn't really matter, as long as it's consistent. I may need to trim the other edge of the center rip when I get another chance to move my cutting table outside again.
 
We've had windy, rainy weather for over a week from this one storm and I'm totally ready for it to go away. The main road into town has sprouted a ton of new potholes and mosaic sections from the super-saturated ground giving way beneath it.
 
Prior to going back for the 2x8 I had made the legs out of a pair of 1x4's. I trimmed the edges on those so one piece was exactly 4" and the other had whatever extra the board allowed still attached. Then I used a 4" piece and a wider piece to make an L with the wider piece overlapping the end, so the L is 5" by almost 4 1/2". I have four of them all 2' long made from the two 1x4's, all screwed and glued and ready for assembly with the rest.
 
Once I get the 2x4 ripping done and the pieces cut to length the assembly will go fast and not depend on the weather. I need just a few minutes where I can get outside and work. Not going to happen today, maybe tomorrow.
 
Admittedly this thread has veered off the original subject to a mini blog on building this table, which probably won't be of interest to everyone, but whatever. Some people seem to dig the amateur carpentry threads.

You can call me EW. Here's my blog index

Reply 3
David Emery deemery2
What kind of blade did you use to rip the 2x8?  (Years ago I invested in a high quality rip sawblade.  I vaguely remember it cost me $80.  But on many projects over the years, I've gotten my money's worth of good quality rip cuts in pine and even 5/4" hickory on a project for my wife. )
 
dave
Modeling 1890s northeast US
Reply 2
eastwind
I just have the one blade for the track saw that it came with. In my reading on woodworking forums about track saws, I have not read people talking about using special-purpose blades for ripping. 
 
We got a half hour or so of clearer weather so I dragged the table out and did the last two rips this afternoon in spite of my former expectations. I trimmed the side of the off-cut from the first rip, just letting the blade turn the uneven part of the edge into sawdust without any offcut, then cut off about 1cm from the other side  to get rid of the bad edge with the bark. That was a true rip cut. I left the dust collection bag off, went slowly and smoothly, and had no stalling or kickback.
 
a 48 tooth track saw blade with a 2.2mm kerf. 
 
When the blade was binding on the earlier cut I noticed that the cut was closing behind the blade - just the wood being ornery, a clear use-case for a riving knife. I don't think a specialty rip blade would have made any difference, except maybe having a wider kerf and thus more room to close, but requiring more power to do the cut.
 
The track saw is the Makita SP6000J, a corded model. In looking up the power (12A) I noticed it says it's variable speed. I have no idea what speed I have it set at - whatever it was set when shipped. That might be a factor. I'll have to figure out where the adjustment knob for that is, lol.
 
Anyhow, I got the job done. I turned the 2x8 (nominal) into a 1 9/16 x 10cm and a 1 9/16 x 9cm and an offcut piece that's about a half inch square but only good for 6 feet of its length. I can find some use for that, scenery risers maybe.
 
I have to do the cross cuts to make the long boards into the frame pieces.  If the weather doesn't clear up I'll do those cuts inside, they won't be making near as much sawdust as the rip cuts.

You can call me EW. Here's my blog index

Reply 2
Virginian and Lake Erie
One issue that sometimes rears it’s head when ripping dimensional lumber is massive amounts of warping as soon as you try to cut it down. 

A good tip to help prevent kickbacks is to cut a short distance and put a wooden wedge in the cut. It will keep the kerf open while cutting. 

Reply 8
eastwind
One issue that sometimes rears it’s head when ripping dimensional lumber is massive amounts of warping as soon as you try to cut it down. 

A good tip to help prevent kickbacks is to cut a short distance and put a wooden wedge in the cut. It will keep the kerf open while cutting. 

Tip noted! Thanks. My plan to avoid warping is to get things put together as quickly as possible. It seems to me that the rough-cut lumber I am buying does pretty well. If it has a bit of crook from the pile, when I rip it to clean up the edges I just take off enough to get a straight piece of lumber out of it. If it's not bowed off the pile it stays that way after planing. I check the end grain so I don't have much trouble with cupping. It just helps loads to be paying up for what they call 'primera' (first) quality. Getting straight lumber is more important to me than being knot-free. 
 
I made some more progress today. And realized that somehow I brain farted on how much 2x4 I'd need. I need 12 feet per shelf, not 8, but only got 16 feet out of the 2x8 I ripped down. So I'm going to use 1x4's for the 2' cross pieces and the 2x4's for the long pieces. Because if I go back they won't have any more 2x4's than they did earlier in the week, and I don't want to buy another big 2x8 and spend too much and have a full 2x4x8' left over. It will be a while before I need more lumber, and they'll have a different selection then, no use buying ahead and having stuff laying around warping.

You can call me EW. Here's my blog index

Reply 1
eastwind
All done! Here's the finished table - I had a thought about staining it but decided it was too much trouble.
 
I bought a set of adjustable height levelers for the legs, but then decided not to use them as they'd concentrate the weight on four small points rather than spread it out the way the L-shaped legs do. In the first pic the table had a little diagonal wobble, and I thought I was going to have to shim one leg a millimeter. But when I moved it into the corner shown in the second picture and loaded it with the drill press that wobble disappeared. The floor isn't perfectly level, so I think it's that more than the weight.
 
20240725_180357.jpg
 
 
20240726_183757.jpg
 
I need to look up in the directions what that piece of metal with the hole in it to the right of the drill press is for.

You can call me EW. Here's my blog index

Reply 5
ChuckS Chuck Stuettgen
Looks great, EW!
 
Chuck S.
"It's a hobby not a race."  What I tell people when I'm asked when my layout will be finished.
[GFRR_Logo_small]
Reply 1
Virginian and Lake Erie
looks nice EW hope it works well for you
Reply 1
Edmund gmpullman
I need to look up in the directions what that piece of metal with the hole in it to the right of the drill press is for.
 
Some chucks are secured to the spindle using a Morse Taper. That wedge tool looks like it is the drift key to tap the chuck out of the spindle. See if there is a slot that it fits into above the chuck. There are other machine tapers but Morse is one of the more common.
 
 
Great looking table! Better than my living room furniture 😝
Good Luck, Ed

Travel and Sleep In Pullman Safety and Comfort!

Reply 1
dperry
Looking very good.
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 0
Bernd
Nice job on that table EW. That looks to be expensive plywood you used. That part on the right is known as a "drift". You'll find a slot in the spindle that it fits in. It used to knock out the drill chuck from the Morse taper shaft and insert other Morse taper tools into the spindle. Enjoy your new piece of "furniture".
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 1
Ancientmariner
Very nice, EW! As a life-long machinist, I am confident that you'll never find a machine base that is too heavy or rigid. At least, I never have. It makes a huge difference in the way a machine performs. If you get the opportunity, enclose that base and store as much heavy stuff there as you conveniently can. Also, there are YouTube videos showing how to build retractable casters from common hardware items, that I'd expect you can find locally.
Well done!
 
 
R/ Tony Anderson
R/ Tony Anderson
 
Half of what I know is wrong. Bear with me while I figure out which half.
Reply 2
eastwind
I need to look up in the directions what that piece of metal with the hole in it to the right of the drill press is for.
 
Some chucks are secured to the spindle using a Morse Taper. That wedge tool looks like it is the drift key to tap the chuck out of the spindle. See if there is a slot that it fits into above the chuck. There are other machine tapers but Morse is one of the more common.
 
 
Good Luck, Ed
That's the answer, I had to tap the chuck and tapered metal piece into the spindle during assembly, so it makes sense there would be some way to get it bac k out.
 
It was nice plywood, but not super expensive, around $50 or $60 IIRC for one sheet. It has a red oak veneer (both sides A). The veneer looks to have been spiral cut. With the dimensional wood, I probably spent $100. It's cabinet-grade, I'd say - no indication that it's marine grade or baltic birch or anything like that.
 
The horizontal pieces running across the front holding up the bottom and top shelves were ripped from a 2x8, they're 1.5" x 10mm and 1.5" x 9mm for added weight and strength. The corresponding side runners are 3/4" thick, as are the legs. Two layers of plywood for the top as many suggested.

You can call me EW. Here's my blog index

Reply 3
ChuckS Chuck Stuettgen
 
EW,
 
If you are still thinking about having it be mobile, you might consider getting one of these kits.
 
Bora Portamate Mobile Base kit.  https://a.co/d/8Au0AtQ
bora_portamate.jpg
 
You'd just need to add a block to the bottom of the legs to provide a solid surface to mount the casters.
 
I used them when I built a cabinet to hold my Miter saw, so it could be stored underneath the layout. You simply press the orange lever down with your foot and roll it to where you need to use the bench.  
 
PXL_20220328_223230172.jpg PXL_20220328_224445026.jpg
 
Chuck S.
"It's a hobby not a race."  What I tell people when I'm asked when my layout will be finished.
[GFRR_Logo_small]
Reply 2
Kevin Rhodes krhodes1
What I have is a 3-drawer Husky rolling tool cabinet from Home Depot. They sell hardwood tops for them, and I have my bench drillpress bolted to the hardwood top. Works great. Normally the whole thing sits in and under some IKEA IVAR shelves, but if I need more space I just roll it out into the garage.
 
I would imagine you could get something similar in Mexico. I bought three of these rolling cabinets when they were on sale, about $129 each and I think the tops are <$20. And of course, they are nice storage too. Pretty heavy duty, nice ball-bearing drawer slides.
 
Kevin Rhodes
Kevin Rhodes
Port Charlotte, FL / Westbrook, ME
Modelling the Maine Central and Portland Terminal Railroads
Reply 0
Reply