jeffshultz

... you turn on the power and they move!

Seriously... after several months (part of which I had access difficulties due to some stuff in the way), I smudged up a white t-shirt cleaning all my track (except the yard area which was full of cars) and then No-Ox'd the layout for the first time ever. Turned on the power and started guessing a what I'd made consist and loco numbers. All of them got run around a bit, except for an Atlas MP15DC that appears to be DOA at the moment. Not sure why, but it probably needs for the QSI decoder to be reset in some fashion. I put it on the Quantum Programmer a few weeks ago but it's only a Ver. 6 chip, so there wasn't much I could do to it. I also need to figure out if the chip is socket mounted so I can replace it with a Ver. 7 chip...

No-Ox does seem to have made a definite improvement in the electrical conductivity of the layout.

Now if I could just figure out why a section of several turnouts in a row (most of which are Snap Switches - it's the oldest part of the layout) cause momentary shorts... some of the time.

I'm also about to give up on swing bridges and just go with a straight up fixed duckunder. Silly thing will _not_ stay aligned.

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Ken Landaiche

Silly thing will _not_ stay aligned.

Quote:

I'm also about to give up on swing bridges and just go with a straight up fixed duckunder. Silly thing will _not_ stay aligned.

Now that sounds like an opportunity for group engineering. What is your current design? How's it failing?

~Ken

Reply 0
jeffshultz

Swing Bridge

Two hinges, connects the two ends of the layout at about a 30deg angle, with altitude change as well. Getting it to "seat" in exactly the same place is the trick. I use a sliding pin-type door latch (the type where you rotate it 90deg to get it to unlock and then pull it out of the hole) to secure it. Pin goes into a metal sleeve of just the right diameter that I found at Ace Hardware.

It had been doing quite well until I added an angle bracket to the side of the layout to support it while it was open. It stayed open for a couple weeks that way and when I closed it last night I had about a 1/8 gap _past_ the point of alignment. Looks like hanging on the angle bracket twisted the hinges or something. really annoying, since that's what it was supposed to prevent.

Oh - it's also slightly longer than 3 feet in length. Built mostly out of 1x4, so it's solid construction.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
UPWilly

Speaking of engineering - check this out

I really admired Charlie Comstock's design - it appeared to be almost "foolproof" for a swing gate.

I suggest you examine the excellent article from Charlie Comstock in the 2009 Q2 issue of the MRH mag. It has what I felt was an excellent design for a swing section.

It is in the "UP THE CREEK: Plate tectonics" article on page 100.

 

Bill D.

egendpic.jpg 

N Scale (1:160), not N Gauge. DC (analog), Stapleton PWM Throttle.

Proto-freelance Southwest U.S. 2nd half 20th Century.

Keep on trackin'

Reply 0
jeffshultz

I've swung Charlie's gate...

I've been on his op crew a couple-three times.

I have no idea how he got it to work so perfectly... other than perhaps by avoiding the whole bunch of angles I've ended up with.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
LKandO

Pics

Got any pictures of your problem child?

Alan

All the details: http://www.LKOrailroad.com       Just the highlights: MRH blog

When I was a kid... no wait, I still do that. HO, 28x32, double deck, 1969, RailPro

Reply 0
BlueHillsCPR

Pics etc

Pics would be great.

I'll have to build a gate of some kind in order to expand beyond the alcove I'm starting with.

With an idea I got from Charlie Comstock's lift-up access hatch,  I'm thinking about building a gate using double locking slides and table-leaf alignment pins to raise, lower, lock in place and align the shelf.  After reading about another hobbyists gate, I think I would also use the alignment pins for routing power to the shelf, like he did.

In my location I should be able to slide the shelf above the door opening, lock it in place and walk underneath.

Anyway, that's my take on solving the various issues of an access gate.

Reply 0
LKandO

Accurate Alignment

In the past I have used automotive valve guides and drill stock to make a precision alignment pin and receiver combination. The bench sections of my slot car track required very accurate alignment since the track slots were only 1/16" wide. With the bench sections correctly aligned, Chevy small block valve guides were epoxied into bolsters on the end joists of each section. The sections were aligned perfectly when a piece of 5/16" drill stock would pass through both guides. A zero slop alignment solution for only a couple bucks. Valve guides are essentially just hardened steel bushings that are readily available at real auto parts stores, very inexpensive, and accurately machined to within .001" as delivered.

 

Alan

All the details: http://www.LKOrailroad.com       Just the highlights: MRH blog

When I was a kid... no wait, I still do that. HO, 28x32, double deck, 1969, RailPro

Reply 0
Russ Bellinis

Jeff, you may just need to change the hinges.

If the entire gate didn't sag or warp from being left open, it may just be that the hinges were not strong enough to support the weight of the gate when left in the open position.  You may just need to install some heavier duty hinges and perhaps add another hinge to the mix to strengthen everything.

Reply 0
rickwade

Hinges

Guys,

My experience with hinges has been that the "piano" style hinge is the best when it comes to resisting sagging and staying in alignment.

Rick

Rick

img_4768.jpg 

The Richlawn Railroad Website - Featuring the L&N in HO  / MRH Blog  / MRM #123

Mt. 22: 37- 40

Reply 0
bear creek

Flooring changes?

Jeff,

I recall that you're building in a garage.  Is there any chance the floor has buckled or heaved a tiny bit under the layout (especially where the gate-way is located)?

I cut out a rather robust chunk of 3/4" plywood to make a gusset plate across the swing bridges span. The idea being to hold the two ends equal distances from each other no matter what.  It works (well mostly) - sometimes I need to apply a bit of persuasion to one of the bridge butresses to get the locking pin in or out.

I'm also using three, rather robust door hinges to attach one end of the bridge to the layout.

Finally, I use next to no dimensional lumber in the bridge or abutments. Instead I made box sections of 3/4" birch plywood with angled gussets to lock the abutments firmly in place.  I'd be a bit concerned that the 1x4 you used may have developed a bit of a warp and that might also be causing a bit of trouble (although it seems unlikely that would make the bridge shrink by 1/8" or the opening expand by that much).

If your bridge opening is going to be 'breathing' perhaps there is still something you could do about it. Can you make the bridge 'expandable'?  That is can it be made to grow or shrink by 1/8"?  Anchor the track solidly to the ends of bridge (perhaps by soldering the rails to the tops of some 1 1/4" #4 flat head wood screws). Then cut staggered gaps in the track about halfway over the bridge.  Opposite each gap add a guard rail.  Next to each gap on the flange side of the rail add a bit of styrene that's the right height for a RP25 flange to ride on - with the outer edge of the flange just touching the top of the styrene.  This will keep the wheels from falling into the 1/8" gaps when the bridge is at full extension.  By keeping the gaps (on the opposite rails) a few inches apart, you'll have one solid rail (with guard rail) holding the wheels on the track at each gap.

It sounds good (to me) in theory, but who knows how well it would work in practice?  Of course I put a lot of serious thought into this idea. Perhas as much as 10 or 15 seconds worth so caveat emptor...

Charlie

 

Superintendent of nearly everything  ayco_hdr.jpg 