jeffshultz
PXL_20220813_185917180.jpg 
Caleb & Jon Dwiggins at the 2022 National Train Show

Jon, Caleb, Jack, and Reece Dwiggins, as Warbonnet Enterprises, LLC, have purchased the assets, intellectual property, and inventory of MicroEngineering Inc., formerly owned by Ron Rands.  In conversation with Joe Fugate and Jeff Shultz at the 2022 National Train Show Caleb and Jon indicated that they do not anticipate any major manufacturing changes. They  have about a two year backlog and filling those orders is their first priority. In response to questions regarding the MicroEngineering website, Caleb noted that all the homepage and the PDF instructions were still available, but he would be working on creating a modern website for the company.  They do not anticipate any major changes in the distribution channels,  continuing sales directly to customers, to dealers, and to wholesale distributors.  Warbonnet Enterprises, LLC is based in Macon, Missouri.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 24
Douglas Meyer
I cant image trying to build a large layout with that level of detail on the track.  I am sure it would look amazing but man the time it would take.

-Doug M
Reply 1
Ken Rice
That level of detail is impressive.
But some of the most realistic layouts around are built using flex track.  Mike Confalone’s, Lance Mindheim, James McNab, Tom Johnson, Neil ? (CP Rail thread on here), Jack Hill, etc.  Ultra detail doesn’t hurt, but it doesn’t help nearly as much as getting overall arrangement, texture, and colors right.
Reply 1
Andy Reichert
I cant image trying to build a large layout with that level of detail on the track.  I am sure it would look amazing but man the time it would take.

-Doug M


https://www.youtube.com/watch?v=AigRF2c0BxQ

Most UK  4mm scale layouts  (home and club) that use more accurate gauge track ("P4" 18.83 mm or "EM" 18.2 mm) are generally all hand laid with two individual chairs holding up the Bullhead rail per "tie".  Those gauges don't have very many options in the way of flex track or commercial turnouts.

But they are nevertheless very popular and numerous.   Just check out You tube.

Until very recently there was no mainstream chaired track in any 4mm scale gauge  choice ("00"16.5 mm  included.)

Andy
Reply 1
cdguenther
I talked to the Berkshire Valley guy at the NTS. The track sample looked great and was impressively "floppy". It assembles quickly (dots of glue), with the biggest chore being cutting the ties out of the sprues. He was hugely relieved by the MicroEngineering news. Full disclosure - I bought one of his 3d boxcars, out of pure curiosity. 
Reply 1
Alex Wood AlexW
Most UK  4mm scale layouts  (home and club) that use more accurate gauge track ("P4" 18.83 mm or "EM" 18.2 mm) are generally all hand laid with two individual chairs holding up the Bullhead rail per "tie".  Those gauges don't have very many options in the way of flex track or commercial turnouts.


I looked up EM and P4, I was not aware of them before. I thought everything was OO gauge over there. Interesting stuff, sort of like P:48 versus O scale. O scale dual gauging is another bizarre rabbit hole I went down one time, and learned about On48.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 1
ednadolski
I cant image trying to build a large layout with that level of detail on the track.  I am sure it would look amazing but man the time it would take.

-Doug M


Especially if you hand-spike everything.

One other key part is to be sure to paint the rail/tieplates in a contrasting color to the ties.   Otherwise, they blend in and it becomes difficult to see the detail that you worked so hard to create.


Ed
Reply 2
MikeHughes

There is a link in the advertising section in the September MRH that goes to Berkshire Design and they have some tutorials on how their product works.  (https://berkshiredesign.net/?cat=16).  Gluing their tie plates to wood ties, you effectively end up with a flexible piece of something resembling CVT tie strip but made from wood.  The sprue works like a jig, which is pretty clever.

One would have to see these up really close to compare against Proto:87 tie plates.  In either case, you get to glue tie plates to ties, and then rail to plate so there is no labour saving, and the join between the tie plates is going to remove daylight under the rail so if you are going for museum quality track, I think Proto:87 has the advantage.

Note the caveat in their tutorials about tie length though, they only align properly with 8’6” ties.  This would suggest they ought to work with Fast Tracks (Albert) standard wood ties.  

To use with Fast Tracks fixtures though, the tie to tie spacing would have to line up with FT straight / curved fixtures.  And of course one has to consider that  FT has different spacing for main,  branch and sidings.  If the spacing works out then one of these ties would have to be removed about every fifth tie to make room for the FT PCB tie.  Altogether complicated, and perhaps easier to just use these folks’ sprues to space ties and be done with it.

I was debating buying a box and trying them out, but they are not shipping to Canada yet.  As well, by the time one factors in typical shipping and the currency exchange, they are likely to add $3 a foot to track cost, so about the same as Proto:87.   Lots of choices.  I have a solution in mind to make my FT track look really fine but it will have to wait for a bit until I acquire a 3D Resin Printer and the Fusion360 design skills to bring the idea to life.

With ME looking secure for the future, maybe, for me, ME Code 70 flextrack is the best overall compromise on realism and ease of use.  It’s also about $3 a foot Cdn. and thats all-in.  $3 a foot for finished track, or $3 a foot for just tie plates (plus ties, rail, etc.).  Lol.  

Happy NMRA Member since 2024
Reply 1
Reply