Ken Rice
After waffling on what to model next for the last 6 years (yikes!) I've finally settled on an interesting prototype with a (deceptively?) simple track arrangement for a switching layout and nice scenery possibilities which I believe is within my skill and time limitations to get to a state the casual observer might mistake for "finished" before the sun burns out.  My plan is to build it more or less on the TOMA approach.
 
The prototype is the East Penn Railroad's Bristol Industrial Track in Bristol, PA.  The East Penn RR operates a number of unconnected shorelines in Pennsylvania and Delaware.  The Bristol Industrial TrackAll told from the far end of the interchange track to the far end of the customer siding it's about 1.2 miles long.  There's a single customer with a double track warehouse with a runaround at one end, and a single interchange track with CSAO (Conrail Shared Assets Organization) with no runaround at the other end.  They do their shuffling at the customer end to get ready, run light to the interchange and come back with the inbound cars, then shove the outbounds out to the interchange and come back light.  Somewhere in there they do the spotting.  Trips to/from the interchange I've seen on railfan videos range from 2 cars to 16 cars, recent typical seems to be around a dozen.
 
The long time power for the Bristol job is PRL 81, an NW2 (PRL is Penn Eastern Rail Lines, a predecessor of East Penn RR).  When the NW2 has problems ESPN (East Penn RR's reporting marks) 52, an SW900, or ESPN 1800, a GP18 takes over while it's being repaired.
 
Google Maps pin to the customer end of the line: https://maps.app.goo.gl/Z4jqZwHUsMSZugaq9
 
I'll end this first post with a video that shows the character which attracts me to the line in the first place.  Trackplan, construction photos, etc. coming soon in a following post.
 

My Bristol Industrial Track blog: https://forum.mrhmag.com/post/east-penn-rr-bristol-industrial-track-construction-begins-13769392
My blogspot blog (older layouts): http://rices-rails.blogspot.com/

Reply 14
Ken Rice
The track plan matches the prototype exactly, and keeps the sizes and distances of the prototype pretty exactly, except for the stretch between Airport Road and the Bristol Pike on the way to the interchange, which I cropped out a bunch of keeping only the scenically interesting bits.
 
[259338%2F9629494%2Fmceclip0]
 
I think it will make for a nice switching operation, with a range of difficulty from a 3-4 cars in and out (easy peasy) to 12-16 cars in and out (maybe getting closer to the 15 puzzle end of the spectrum).
 
Initial power will be my Athearn CSX MP15 fitted out with a loksound and a protothrottle.  I won't worry about finding and painting appropriate locos for the line until there's enough scenery and structures completed that the wrong loco seems like the biggest visual problem.
Reply 17
laming
 
ANY modern day railroad short line that uses a 1st Gen EMD switch engine already has my attention!
 
Best of luck on getting it finished before the sun burns out! (LOL! That was funny.)
 
Andre
Reply 3
Ken Rice
Construction is underway, the first module is in place and ready for some roadbed and track as of yesterday.  All the benchwork is 15.5" wide except for a bit at the interchange end.  I choose 15.5" specifically because it lets me get a 4x8 sheet of plywood cut into three equal size pieces at Home Depot and have enough margin to trim up any rough edge and get it exactly to size.
 
First, a pic of the completed module in place, then I'll go back over some of the details.
 
[259338%2F9629498%2Fmceclip0]
 
OK, so, back at the beginning of construction, or rather just before it, here's the "empty" layout space.  On the right wall is my little test switching layout which has kept me entertained while I've been planning and waffling.  It will get moved once I get the Bristol Industrial Track around that far.  Off to the left is workshop and project space.
 
[259338%2F9629500%2Fmceclip0]
 
My original plan was just shelf brackets attached directly to the wall.  One problem with that is studs are not always where you want a bracket, but the worse problem turned out to be the flimsy steel studs in the walls.  The walls can flex a bit when you lean on them.  The walls are of course also not flat, vertical, or straight when you look closely.  So I decided to add some stiffness to the walls in the form of 1/2" plywood around the band where the layout will be attached, which also gives me infinite flexibility in where I can put brackets.  There's also a 1x2 across the top of the plywood stiffeners to give a little more meat to screw brackets down into.  The 1x2 is glued and screwed to the plywood.
 
Mounting the first couple stiffeners using a laser level.  Everything is better with lasers.  Or least more fun.
[259338%2F9629512%2Fmceclip0]
Reply 15
Ken Rice
I'm going to need a lot of cross pieces for benchwork either 15.5" or 14" (15.5" - two 1x4 thicknesses) so I made a jig to get quickly repeatable cuts with my tracksaw.  As is you get 15.5", to get 14" you stick a couple stubs of 1x4 in the left end to shorten up the stop.  I have a table saw and a chop saw in the garage I moved from my old house, but they both spew sawdust all over the landscape and take up more space than I like, so I'm going tracksaw only in my new shop.
 
[259338%2F9657014%2Fmceclip0]
 
The pieces for the first couple 15.5" 6' long modules ready for assembly.  Well except for the holes I forgot to drill, and the pieces I forgot to cut.
 
[259338%2F9657016%2Fmceclip0]
 
First frame assembled.  Joints glued with gorilla glue and screwed with GRK R4 #9x2 screws.  All ready for the plywood top.  Except wait a minute, I was going to round one corner, and add blocks to stick adjustment feet in...
 
[259338%2F9629527%2Fmceclip0]
 
So I added a 45 brace across the corner in question (also glued and screwed) and cut off the corner of the framing.  Just for grins I took the screws out of the chopped off corner and tried to break the glue joint with reasonable force - nope, gorilla glue does its job well!  That's a 5" radius curve on the corner, which will work well with either 1/8" or 1/4" MDF fascia, I haven't decided which yet.  I've curved both around a tighter corner than that before so I know it can be done well.  The top is on with glue (tight bond) and brads - a brad gun is an incredibly useful thing for benchwork.  The adjustment feet are also on, and now it's ready.  Except wait, I was going to make a provision for lightly screwing it to the brackets to keep it from sliding around...
 
[259338%2F9629534%2Fmceclip0]
 
I added another layer of 1x3 inside the layer for the feet for the screw.  Also glued, pinned in place with the brad gun, and then screwed.  So here's an upside-down view of how it's going to work.  The horizontal 1x3 is the shelf bracket top piece.  The feet sit on it, and can be adjusted to correct for any imperfections in my carpentry.  There's an almost as big as the screw head hole through it for the cabinet screw shown propped in the hole.  Once the module is in the right place and adjusted, that screw will be screwed in just tight enough to stop the module from sliding around or bouncing when bumped.  There's one of those screws front and back on each bracket.
 
[259338%2F9629545%2Fmceclip0]
Reply 13
Ken Rice
 
ANY modern day railroad short line that uses a 1st Gen EMD switch engine already has my attention!
 
Best of luck on getting it finished before the sun burns out! (LOL! That was funny.)
 
Andre
Thanks Andre!  I have yet to get a model RR anywhere near close to "finished", and it's something I want to do at least once in my life.
Reply 3
Ken Rice
At this point it really was time to get the module installed.  The packets are 1x3's.  The top one is 15.5" long, the angle brace is just shy 18" - that's not critical except it has to be short enough to clear where the screw hole is in the top piece.  First the top piece gets screwed to the stiffener.  The I used the laser level and a bubble level to check level while adjusting with the Bessey clamp which has a gizmo to switch between clamping and jacking.  Once I got it level I fiddled the angle brace in so the bevels had full contact, and pinned both ends of the angle brace with the brad gun so it would stay put while I drilled and screwed.  No glue on these joints, just in case I end up needing to move the brackets a bit one way or the other for some reason.  Two screws at each end holds them quite securely though.
 
[259338%2F9629563%2Fmceclip0]
 
Here's an end view after the first module after it's installed so you can see all the parts in play.  I only put in the front cabinet screws for now, but it seems secure enough that the rear ones might not be needed at all.  Once the other two modules to the far corner are in this one will probably need to slide toward the corner about 1/8 - 1/4", which will also allow for the fascia to not stand out from this corner.
 
[259338%2F9629566%2Fmceclip0]
Reply 11
Ken Rice
The first module all ready for roadbed and track.  I got ahead of myself and drew the track lines from a small scale drawing - they're off by 1/4".  Not a big deal but I'm going to erase and draw them in the right place - no sense in starting off wrong!
 
The layout surface is 43.5" above the floor at this point.  That's a pretty nice height for working on, and not bad for operating.  I also got an adjustable chair adjustable through a higher range than normal so it's more like a stool, and put really good casters on it.  It's easy to scoot around on at heights that put eye level 10 or so inches below standing eye level, which is a great viewing and operating height.
 
[259338%2F9629572%2Fmceclip0]
Reply 13
tp
That's quite interesting.. adjustable feet..
Reply 5
Joseph Toth Jr.
Ken Rice
 
Looks like a great project. Best of luck gettin' it finished before the sun burns out* though.
 
*Hey dude, do you know somethin' the rest of us don't? All I get on TV Breakin' Neck News is about wars and rumors of wars as predicted in the last book of the Bible e.i. Revelation.
 
Like Mr. Ming says , any shortline (...regional too for that matter) that incorporates first generation power nowdays is MY kind of railroad!
 
What's with all the BKTY boxcars? Looks like the East Penn is doin' good bizz. I won't mention the ugly boxcars other than to say they are a turn off in my book.
 
Thanks for postin'! Lookin' forward for the next update.
 
Joe Toth Jr.
Reply 2
RicharH
I like the  way the shelf can be leveled after installing! Great idea. I have literally built shelves with levels in place and somewhere in bradding and screwing it in place, lost my level.
Reply 3
Ken Rice
That's quite interesting.. adjustable feet..
 
I like the  way the shelf can be leveled after installing! Great idea. I have literally built shelves with levels in place and somewhere in bradding and screwing it in place, lost my level.
Thanks guys!  I’ve had my share of “how the heck did that end up not quite level” moments in the past, I really wanted to leave myself an easy way out of them this time.
Reply 3
Ken Rice
What's with all the BKTY boxcars? Looks like the East Penn is doin' good bizz. I won't mention the ugly boxcars other than to say they are a turn off in my book.
Judge apparently warehouses and distributes beer and wine from this location, and wherever it’s coming from seems to use a lot of TBOX/RBOX/ABOX, and a lot of BKTY (which is now owned by GATX), plus a few other reporting marks.  I’m going to aim for a similar mix of rolling stock.
Reply 3
musgrovejb
My favorite saying is “Model based on the real world”.    Your layout plan is a great example.  Looking forward to seeing the progress!
 
Joe

Modeling Missouri Pacific Railroad's Central Division, Fort Smith, Arkansas

https://youtube.com/playlist?list=PLENIMVXBDQCrKbhMvsed6kBC8p40GwtxQ

 

Reply 4
Ken Rice
My favorite saying is “Model based on the real world”.    Your layout plan is a great example.  Looking forward to seeing the progress!
Thanks Joe.  I figure if I’ve got the same track as the prototype, I should be able to easily adapt anything new I learn about the operation after building the layout.
Reply 5
Joseph Toth Jr.
You're welcome Ken
 
How did you come to choose the East Penn for your layout theme railroad?
 
What's the chance of Conrail CASO motive power showin' up on the interchange?
 
Thanks for sharin'!
 
Joe Toth Jr.
Reply 2
Ken Rice
How did you come to choose the East Penn for your layout theme railroad?
YouTube railfanning I came across videos of it, and was intrigued.  So I found it on google maps an was more intrigued.  It seemed like a good fit for a switching layout with a nice scenic setting.
 
What's the chance of Conrail CASO motive power showin' up on the interchange?
Zero.  The in and outbound interchange cars are always spotted at the CSAO end, if not hanging over onto the CSAO lead (if there’s more than 10-12 cars).  The CSAO power never gets more than a few feet into the interchange track.
You’ve got to draw the line vigorously somewhere, otherwise these things tend to mushroom 🙂
Reply 5
Joseph Toth Jr.
I hear you Ken.
 
I've finally made the decision to go 1:48 acct. limited space in the attic. Will freelance an x-Katy branchline that operated from Greenville to Mineola, TX. My Mineola & Greenville will just have a small terminal and fuel rack. Local industry will be switched with a Trackmobile (if ones been made in O scale?) with GP7s used for power. They'll be spotted on the fuel rack for show is understood. Just a plan in my 79 year old worn out brain for now, but like an engine foreman I worked with when I switched for the ATSF in Dallas back in the late 60s/mid-70s once told me: "Son, you bgotta plan your work and work your plan!" You wanna know somethin'...he was right on!
 
Joe Toth Jr.
Reply 2
Denny99
Very nice subject and interesting track plan. I like its simplicity, yet it provides a good deal of operational possibilities.
I also like the finely built benchwork!
Following with interest.
(HO Scale Freelanced Short Line, Montana, 1985)
Reply 3
Ken Rice
Very nice subject and interesting track plan. I like its simplicity, yet it provides a good deal of operational possibilities.
I also like the finely built benchwork!
Following with interest.
Thanks!  I do have high hopes for the operating possibilities.
Reply 2
Al Carter tabooma county rwy
Ken, that is some very fine looking benchwork and supporting structure that you have built. Your carpentry skills sure put mine to shame...
 
Al Carter, Mount Vernon, WA
Reply 2
Ken Rice
Ken, that is some very fine looking benchwork and supporting structure that you have built. Your carpentry skills sure put mine to shame...
 
Al Carter, Mount Vernon, WA
Thanks Al!
Reply 1
Ken Rice
Tonight I put together a second 6’ module.  I had all the pieces already cut out and one end glued on, so it was just a matter of adding the rest of the cross members, the other end, and the top.  This one was a little bit of an experiment to see if I could get away with using lumber with a bit of a bow (slight curve side to side) and a very tiny twist for the sides.  I put the bow in the two sides opposite so they’d cancel out, which helped a lot but left the complete assembly with a very slight S shape - by a bit less than 1/16”.  Even though all the angles were 90 as I assembled somehow the whole thing ended up parallelogrammed by a little under 1/16”.  I was able to correct both while adding the top though.
 
In order to make sure the two side rails are perfectly lined up I assemble one end first, then add the cross braces down the middle, then add the other end.  I’ve got a pretty good system to make it easy now:
 
[259338%2F9631126%2Fmceclip0]
 
To get a little extra space to lower in a cross piece with glue on the ends without scraping all the glue off, I clamp across the previous cross piece (or first the first one a temp cross piece next to it) to avoid messing up joints I already screwed before the glue dries, and use a second clamp in jack mode to slightly spread the sides on the other side of where the new cross piece goes.
Then I’ve got a set of red plastic 90 degree clamping aids.  I clamp one to the cross piece so it’s easy to keep it perpendicular to the bench.  And I clamp another one to one side so that when I hold the cross piece against it it’s square with the side and in the right place.  Then add the glue to the cross piece ends (wax paper to catch the extras already in place), hold the cross piece in position, relax the jacking clamp so the sides squish onto the cross piece, drill, and screw it in.  Easier to do than to write or read the description of.
 
I corrected the very slight parallelogram with a couple clamps pulling just a very little bit diagonally.
 
[259338%2F9631128%2Fmceclip0]
 
And then run a bead of Titebond along the each piece of the frame, plop the top on and nail it at a couple corners with the brad gun, then across the ends, then pulled/pushed the slight S straight while nailing along the length of it.  The brad gun is an incredibly useful benchwork tool!
 
Next up is adding the blocks for the feet, and the feet.
 
[259338%2F9631131%2Fmceclip0]
Reply 9
Ken Rice
A couple extra zesty weeks at work and a bit of a cold stymied progress, but I got back to it today to get the second module finished and installed.
 
I decided to try a cross piece  for the feet instead of blocks on the side, so there would be something to put a single cabinet screw through in the middle instead of one at each end.  I used 1x3 glued and screwed, in retrospect I think 1x2 would have been better - easier to get my fingers in to adjust the feet.  Ignore the hole in the middle of the foot support cross piece - that was a screw up.  The diagonal brace on the shelf bracket has a hole through it at the right angle and position to line up with the hole through the horizontal piece of the shelf bracket so I can get a 6” driver extension up through it to run the cabinet screw that will hold it in place.  I think one screw in the middle of the bracket will still add enough friction to hold things in position just fine and be easier to deal with than a screw at the front and back.
 
[259338%2F9647700%2Fmceclip0]
 
The second module in place, with both of them leveled out and lined up.  The ends of the modules will eventually be held together with two bolts - a T-nut in one side, bolt going through an over sized hole with a fender washer in the other.  The idea is not to force alignment, it’s to clamp them together once they’re aligned with the adjustable feet.  For now I just have a couple clamps.
 
[259338%2F9647701%2Fmceclip0]
 
The light switch will be inside a warehouse which will be 6” deep by 33” long and roughly 4.5” tall.  I’ll leave a hole in the roof big enough to easily see and flip the switches.
 
Next up for the 2 already built modules is to get cork roadbed down.  I’m using 1/8” thick sheet cork I got rolls of from Amazon, I’ll cut 3 3/4” strips for the double track warehouse spurs and glue them down, then get the track centerlines transferred to the cork and lay the track.  I also want to get crude mockups of the two warehouses in place, with doors marked, so I can get a better feel for what it’s going to be like.  The second warehouse is 6” deep by 66” long and a just a little shorter than the first one.  I need to find some better photos to scale the heights off at some point -the lengths are easy to get from satellite photos, but for height all I’ve got so far are a couple not so great photos.
 
Next up for benchwork is the corner module, which is going to be a bit trickier to make since there’s a lot of 45 degree cuts.  The main diagonal frame is my standard 15.5” wide, but the ends are kind of bent around 45 degrees.  The feet will be on the main frame, and rest on angled shelf brackets.  I got a full sized benchwork “blueprint” printed for it at Staples to make it easier to get all the pieces right.
 
[259338%2F9647703%2Fmceclip0]
Reply 9
Nsmapaul
Found a track chart for that area that may help you. 537FDF69-14D5-4F05-B13E-0A814230606B.jpeg

“0” track on the bottom now goes off to a rock salt distribution facility(at least that’s what I think it is). They definitely offload 2 bay covered hoppers there.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

 “If it moves and it shouldn’t, use duct tape. If it doesn’t move and it should, use WD40.”

Reply 8
Reply