jeffshultz

Okay, the "Portable Display Layout" now has a name - the Lone Hill Park RR. 

Once I decided to build a portable layout like this, I also decided that I was going to use it to do a few things I've not done before - such as making a major terrain feature out of foam and Celluclay. 

I've used Sculptomold before but have been told that Celluclay is superior - it does appear to be more fine grained a product. However, I've also discovered that at around 65-69deg F. it also takes forever to dry/cure. 

So what I've got now is the track laid, including the power wires (just one set, hope the rails will conduct!) soldered to the rails with some of the finest soldering I think I've ever done, and all the base vegetation on the outside of the tracks done. The tracks are glued down as well, as much by wandering dilute glue for the ground foam as anything else. The parking lot is in place and the tan area is a "woodchip" path - it will get a lot narrower on the other side of the tracks. 

3_resize.jpg 

I also built (no photos yet) a set of New Rail's HO Scale picnic tables that will go in here as well. Also - see that shaker canister above on the near side? It was full when I started this.... 

So, here is Lone Hill - complete with a walking path to the top (my wife's idea, it makes it look less like a pimple in the field):

1_resize.jpg 

Obviously there will be a lot of work done to blend it into the surrounding terrain a bit more. But first I have to actually get the thing to cure - and that's why there is a small space heater pointed at it right now. 

Here is is from another corner:

5_resize.jpg 

It's definitely interesting to create something that is pretty light (the hill end is going to be a lot heavier) and will still be durable enough to take places. Now for a trip to the train store for some more supplies! 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
LPS L1

photos

i can't get the photos to upload, sorry.

the only thing yours layout is missing is a "station" for offices and ticket sales, as well as perhaps part storage.

I would say get a pikestuff "yard office" for the office/storage and a SYLVAN union station for ticket sales. here is the SYLVAN station in case you did not know (neat eh?)          

SKOTI

Building a layout featuring a "what if" L&PS railway and any other shiny/grimy trains I can get my paws on.

lps_hea2.jpg 

 

Reply 0
jeffshultz

Station/platform

A station or platform is definitely in the plans. That is one of the reasons I am heading up to the train store tomorrow.

 

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Reply