jeffshultz

So this all started about a month ago when a message was left on my voicemail at work by the owner of what was the best hobby shop in Salem, OR before he retired and closed it. We also have a relationship through my current job as well. Suffice it to say, he knew I was into model railroading. 

He had gotten a call from the lady who was the Events and Activities person at the Turner Retirement Homes, a local Christian retirement community in Turner, OR - they get a lot of retired pastors and the like there. This lady, Shelly, knew that November was Model Railroading Month and thought it would be a fun idea if we could bring some layouts down to the Retirement Home for the residents to see. 

I put out an all-call for portable layouts to my local NMRA division via e-mail and got a few references to local modular clubs, who I was reluctant to call on because it was only going to be for a couple hours and also the Great Train Expo is the following weekend - and most of them would be participating in that. I also got a reply from a member named Dale who mentioned that he had a dual gauge Sn3/On30 circle of track on a 4'x4' benchwork. Basically a test loop with ground foam on it. He was willing to run an On30 set he had picked up at a swap meet on it (at the time we thought we might be giving the residents the throttles, which didn't happen). 

Seeing no real alternative, two weeks ago I started building the Portable Display Layout, now known as the Lone HIll Park RR (LHP RR). I finished it (with the addition of recommended here crossbucks) about an hour before we had to pack it up to leave. 

So I pack up a bunch of HO equipment, including three locomotives (1 Athearn Dash-9 BB, 1 Athearn Dash-9 BB Dummy, 1 Bachmann GP30) that hadn't seen much light since 2004 (they're all DC), some of my newer rolling stock that would fit in the box I'd found, and some track, and then pack in another box all the removable items from the LHP RR. And discover as my wife and I lifted the layout off the table that some of the glue I'd been bathing the ground foam in had gotten past my tape and the garbage bags underneath and was quickly drying into my dining room table (eh, it's white glue, easy clean up). But first we grab the other half of the 2'x8' foam board that was sitting nearby (thank goodness I hadn't used it for scenery) and placed the layout on top of it, effectively making it twice as tall and eliminating the possibility of smearing glue on anyone else's tables. 

We get to the retirement home, go through some shenanigans due to some unforeseen complications (like the death of Shelly's mother the day before), meet Dale and his wife, and get our two layouts and static displays set up. 

Continued in comments.... 

 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

And in come the people...

Dinner there is about 4:30-5pm, and we were set up and ready to go by 4pm, easy. Dale had, in addition to his test loop, a static display of some Sn3 equipment and some G scale cars:

e_shrunk.jpg 

And the 4x4 On30 setup as well (which was nice since the residents could see it clearly):

e_shrunk.jpg 

 

I set up my HO scale stuff as well as an N scale American Freedom Train model loaned to me by a friend and a P2K PS-2 Covered Hopper Timesaver Kit that I had lying around as well:

e_shrunk.jpg 

We got both trains going, both of which, after a couple of setup issues, performed flawlessly the entire time we were there - I'd like to thank the person who reminded me to put up crossbucks here - they're  a Pikestuff kit of unknown age, but they went together perfectly:

e_shrunk.jpg 

 And the visitors stopped by - this gentleman was very interested, liked to talk, and basically hung around until they started serving dinner:

e_shrunk.jpg 

Laura was having fun explaining how HO scale was the most popular scale, as well as showing off the American Freedom Train - a train that many of the residents remembered seeing in 1976. Of course, the locomotive is the SP4449, which is currently in it's new home in Portland - only 65 miles away: 
e_shrunk.jpg 

e_shrunk.jpg 

This lady (in the pink scarf) ended up being one of those people that simply radiates the feeling of "grandma!":
e_shrunk.jpg 

 Her eyesight is such that she has this massive magnifying glass (It could have slagged a Z scale train in direct sunlight) to see detail with - and yes, we stopped the train for her:

e_shrunk.jpg 

e_shrunk.jpg 

And the little On30 train (purchased at a swap meet for $40) keeps going:
e_shrunk.jpg 

e_shrunk.jpg 

Continued...

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Finishing up...

This lady had the biggest smile on her face as she saw my layout:

e_shrunk.jpg 

e_shrunk.jpg 

And then a lady walked up that I had no idea I was going to see - the widow of the pastor of my church for the first twenty-something years of my life. She'd moved out to Turner only a couple of months previously:

e_shrunk.jpg 

I might not ever succeed in turning Laura into a model railroader, but she's certainly picked up a lot of information via osmosis:

e_shrunk.jpg 

And then it was about 5:40pm, everyone was eating... and it was time to pack up and head home. It was pretty well agreed that for the size of the crowd, our two layouts and the static displays were just right - enough different stuff that people didn't pile up at any one thing (well, not much), without being so much stuff (or so many people) as to be overwhelming. 

Now... what do I do with the Lone Hill Park Railroad???? 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Joe Brugger

Nice job. Looks like everyone

Nice job. Looks like everyone is having fun. And you finished your $500 layout.

Reply 0
Donald Dunn don_csx

This is Great!!

This is great that you guys took time out to do this. I know they had to enjoy this. I commend you all for doing this for the elderly.

Take Care, Stay Safe, Happy Modeling & God Bless. 

Donald Dunn

http://www.trainweb.org/kvo/

http://www.trainweb.org/ddminingsteel/

 

Reply 0
Dave K skiloff

This sounds

like something more of us should look into.  What better way to leverage our hobby for the enjoyment of others.  Good stuff, Jeff.

Dave
Playing around in HO and N scale since 1976

Reply 0
LPS L1

what to do with it...

how mush would you part with it for? I am very much interested.

or, if you want to keep it around cut a slot in your layout the size of the base of the that "layout" and add that in as a park layout (wow, me suggesting to use something how it was intended)

SKOTI

Building a layout featuring a "what if" L&PS railway and any other shiny/grimy trains I can get my paws on.

lps_hea2.jpg 

 

Reply 0
jeffshultz

No room on the layout for it....

I would love to be able to slot it into my existing layout - as is, there is a Z scale loop of track (this one has a turnout that is trailing to the normal direction of traffic) on my layout that directly inspired this. But it's much smaller - no room for Lone Hill there! 

I think I'll be keeping it - there have to be more opportunities of this sort out there - but my actual issue will be finding an adequate storage spot for it. Likely all I will be storing is the base - pretty much everything else is removable and intended for use on my main layout. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
nscale4years

Good Job, Jeff

I volunteer two nights a week at a local senior citizen center here, Its just an hour and a half from 6:30 pm to 8:00 pm. We call Card Bingo on Tuesday nights and just play cards with the seniors on Thursdays. You cannot believe how much they appreciate our (my friend John and I) coming out to spend a little time with them. (Our wives also appreciate the fact we are out of their hair a few nights a week.)

 The best part is the sitting around and having coffee and snacks from 8:00 'til 8:30. The seniors tell the best stories and one of the old gentlemen actually worked on the Kettle Valley Railway out of Nelson in British Columbia in the late 50's to early 70's. Great stories.

Reply 0
CM Auditor

Take it to a preschool

Jeff, I suspect you will generate similar interest if you take to some place where you can show your display off to youngsters.  It might be a chance to let the kids view and operate the trains.  You might set them off on a great hobby for the rest of their lives. 

We have one modeler here in Colorado that allows the younger kids to operate different items on his layout at some of the train shows.  Some of the kids get to operate the trains, others can change the traffic lights.  or turn on the crossing lights.  What we have found is that the kids love to be able to push a button and see something happening on the layout that they controlled.  You will find yourself opening the hobby to the kids.

CM Auditor

Tom VanWormer

Monument CO

Colorado City Yard Limits 1895

Reply 0
Reply