eastwind
At first I thought I was going to need a curved crossing at a low/sharp angle, but after doing a thread about that and then laying things out and rejiggering the plan, I've ended up with a 45-degree crossing.
 
Of course I could just buy a commercial one and be done, but I don't like the looks of them much. Too much black plastic where there shouldn't be any. The rail is the part of the model I can actually make.
 
I previously built a bunch of turnouts using fast tracks jigs, including a double crossover, and I've built a single curved crossover without a jig. Having learned some things from that, I am trying some things new to me on this build.
 
There are a couple other threads going about building crossings, but I didn't want to try using the lap method. It might be better, but I've never tried it, and I wanted to stick with doing things the fast-tracks way. So here goes.

You can call me EW. Here's my blog index

Reply 5
eastwind
First thing I did was build a jig for making the angled rail joints. I showed this in my other thread already:
 
20231220_231138.jpg
 
In making this, I used my track saw and a 90 degree attachment to get the end of the wood cut to as precisely a 90 degree angle as I could. 
 
Then I measured the width and found the center point (a small mark). Then I measured a little ways away from the center in both directions. The amount is not critical, as long as it's the same on both sides. I used 5mm, but 1/8" would have been ok too.
 
I used a cheapo carpenter's protractor to set the angle to 45 degrees.  It's not set to 45 degrees in the picture, I scarfed a pic from an online store instead of taking my own. But that's the exact same thing, they run about ten bucks and I got mine at Home Depot. One thing I don't have is a pair of dividers, that would have been handy for finding the center and matching the two sides more accurately.
 
[General_Tools_29_Image]
 
The overlapping bars let you lay one bar along the side of the piece of wood (assuming that the side is cut straight to your square end) and trace an angle away from that side. 
 
Then I drew the line across using a square and connected the 3rd side of the triangle, which should be the same angle on both sides.
 
After drawing the lines (and I tried 4 times before I got it to my satisfaction - my first attempt was on a shorter piece of wood, and that didn't work because I needed the length to lay the protractor bar along the edge), I cut some of my tie material (it's basswood that I bought sheets of in 2mm thickness and then slice into ties using a balsa wood strip cutter). 
 
I cut the ties long so they hung over the edge, glued them down with yellow carpenter's glue, let the glue dry, then flipped the jig over and cut the ties flush with one of those box cutters with blades that extend out and you break off a chunk at a time - I extended it way out of the holder so I could cut parallel to the board wihout the handle being in the way. 
 
I'll use the jig to file the ends of the rails to precise angles. I can let the rail hang over either the end or the side and file flush to the jig. I'll also use the jig to hold the two rails in position to each other while soldering a frog angle in mid air off the end of the jig. 

You can call me EW. Here's my blog index

Reply 3
eastwind
For this build I had a pre-printed template from fast tracks. In my prior curved crossover I had trouble keeping the pcb ties stuck down, so this time I did the work on a scrap sheet of drywall with the template taped to it, and the pcb ties spiked down.
 
One of my goals/requirements is to not end up with the template buried in the finished product (under the rails above the roadbed) - I don't like the idea of that. You can chalk that up to eccentricity if you like.
 
Another goal/requirement is to build on the bench rather than in-place. In this case that's because the placement would be awkward to build in place, and I want to be able to adjust the placement slightly after I get it built. There will be two curved turnouts that also have to be built and everything adjusted at once before I commit to an exact placement of anything, so it was not just a preference to build on the bench rather than in-place. 
 
Here's my progress so far, with the ties cut to length, gapped and spiked down:
 
20231223_205302.jpg
 
I posed the tools I used around for the photo.
 
Edit: updated the photo, but  the new one got rotated and under the new forum I don't know how to fix that.
 
The rest of the ties will be wood. The template calls for a wood tie in the very center, but I went ahead and used another pcb tie there.
 
The spikes are ME medium spikes, which I have stored in that little pill bottle. I wouldn't want anything any smaller or shorter. The spikes don't go through the pcb ties, I sunk them right up against the end with the spike head overhanging the end of the tie. On the layout I will use caulk instead of spikes.
 
The first tie I did I shined it up with the brush, cut it to length, filed the gaps, checked it with the meter and spiked it down. Then I realized that it was in the way of measuring and filing the second tie, so I took it off until I'd gotten all the ties ready, then I spiked them all. To someone else that would have been obvious, but I learned the hard way.

You can call me EW. Here's my blog index

Reply 5
eastwind
more later

You can call me EW. Here's my blog index

Reply 3
dperry
That is the way I held my ties down - spikes on the end.  Worked very well for me.  I spiked into soft pine but Joe F. likes drywall and he has built more than a few turnouts.  I don't have any drywall or I would give it a try.
 
I am interested to see how this method of building works out for you.  I hope that you are successful and without too much stress.
 
David 
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 3
Kevin Parson SeeYou190
I am going to be lurking on this thread.
 
If/when/ever/hopefully I get to the other side of my layout, I will need to build a double 45 degree crossing.
 
Plastic frogs will not do in this location as short wheelbased steamers will need to cross on the single track.
 
-Photograph by Kevin Parson
 
I will be appreciating learning from your experience.
 
-Kevin
Living the dream and happily modeling my STRATTON AND GILLETTE Railroad in HO scale. The SGRR is a freelanced Class A railroad as it would have appeared on Tuesday, August 3rd, 1954, in my personal fantasy world of plausible nonsense.
Reply 3
Thom
Why do I always focus on the bright yellow shiny things, like a moth to a porch light. 😉    Cool pic!                                                            Thanx Thom...
Reply 3
eastwind
I'm glad somebody is going to find it useful, I wasn't sure since we've had other threads. 
 
I didn't get anything done today, I treated myself to extra coffee this morning and was too twitchy to do modelling!
 
All I got done in the last day was to add another strip to my jig so I can solder the oblique angles. Now I have spots where I can file both the 45/2 = 22.5 degree angles and the (180-45)/2 = 67.5 degree angles needed, and I can solder two pieces together using either the end for a 45 degree or the side for a 135 degree angle.
 
20231225_234357.jpg
 
Edit: at first I was planning to just temporarily spike down the rails and solder those wide angles in place, but the place where they meet is over the tie that's in the exact middle of the crossing - which I changed from wood (per fast tracks) to pcb. I didn't think trying to solder two rails together into a point right over a pcb tie would work well at all, so I will now solder the two rails together using the jig and then try to solder the point down to the pcb tie without melting the first solder joint. If that fails, I'll pull the center pcb tie out and replace it with wood after the crossing is built.

You can call me EW. Here's my blog index

Reply 4
Andy Reichert
Another goal/requirement is to build on the bench rather than in-place. In this case that's because the placement would be awkward to build in place, and I want to be able to adjust the placement slightly after I get it built. There will be two curved turnouts that also have to be built and everything adjusted at once before I commit to an exact placement of anything, so it was not just a preference to build on the bench rather than in-place. 
 
Absolutely agree. For me that's an essential aspect of turnout and crossing building.  Otherwise you can never be sure that whatever roadbed you are building on is sufficiently flat.  Turnouts built on a bumpy or twisted surface are always going to be at risk for rough running, as wheels will not be sitting firmly  down on the rails at all points.
 
I suspect that's why turnouts built on fixtures have such a good reputation for excellent running vs. "traditional" building in place on top of hand sanded ties.
 
Andy
Reply 2
eastwind
Edit: correcting the spelling corrector.
 
I don't really follow your logic there, you have to get the roadbed flat either way, right?
 
Meanwhile, I have had some success and feel very optimistic I can complete this build!
 
20231227_121922.jpg
 
I made the oblique angle with the jig. It wasn't perfect, one rail was a hair (literally a hair's width) higher than the other. I fixed that by filing the rail head and the bottom. I've used a couple spikes to hold it in position while I was building the second piece in the above photo. I built that first by making a sharp point of two straight pieces of rails filed with the jig. Again, the solder joint  came in a hair off vertically, which I filed away.
 
The angle was also just a little too broad. I tried to bend the legs and instead broke the solder joint. So I filed off the old solder and resoldered. This time it went together without a vertical misalignment, and the angle was perfect. So I proceeded to work on the other angle in that piece, which I made by bending the straight rail leg. 
 
I first figured out exactly where I wanted the bend using the template and the NMRA gauge. I'd like to make a picture of that on the next one I do if I can (it takes 3 hands). Then where I wanted the bend I used a jeweler's saw to cut a kerf in the rail foot at the point of the bend. Then I braced the leg I wanted to bend on the jig with the point of the bend at the edge and held it down and bent the leg up. That avoided putting any strain on the solder joint. It took a couple careful partial bends to get it right. 
 
The piece is just a little too wide right now. The flangeway bumps on the NMRA jig should straddle the rails but one comes down on top:
 
20231227_142450.jpg
 
Versus my test truck, the truck does straddle the rails, but its rubbing on both sides, and maybe in this pic the flanges are riding on the rail feet. 
 
20231227_142539.jpg
 
 
But I am encouraged. If I can get this close on the first try, I should be able to make 4 of these pieces that are accurate. I may be able to rescue the one shown by filing the sides of the rail head, but I think I'll just try making more, maybe a total of six or seven and pick the best four. It's likely some of them will be a little too narrow since it's hard to get that bend precisely where its wanted. Even if the kerf is in the exact right spot the rail bend can be a little off. 
 
I also have another option, and that's to solder instead of bending the rail at that point. I'd need to make the piece a little long and then shorten it up after doing the first solder joint. We'll see what works best, but for now, this is close enough that I know I can succeed if I keep trying.
 
This particular part was the one I was most concerned about, the entire accuracy of the crossover depends on getting this piece right. The other parts are just V's. 

You can call me EW. Here's my blog index

Reply 7
eastwind
I've got all but two 'V' sections made, and then I'll be ready to start soldering the track pieces to the ties. Here is everything I have made laid out, nothing attached to the ties.
 
20231228_184956.jpg
 
I wanted to show a couple pics about how I bend those center diamond/guard rail pieces, as that's the hardest part.
 
First, I file two rail pieces to and solder them together to form a 'V'. Then, I measure very carefully where I want the bend using the NMRA gauge (and the previous similar pieces). I was scratching the point on the rail with a steel pin, but that's hard to see. A sharpie is too dull (lol). A "roller-ball" gel-type pen works better. 
 
Then I cut a kerf in the rail with a jeweler's saw. The kerf goes on the inside of the bend! Cutting a kerf on the outside of the bend isn't necessary, the rail foot stretches better than it compresses, and it looks better and is stronger without it.
 
Here's pic of a 'V' with the kerf cut. I just go halfway through the rail foot, with the saw blade at an angle so it doesn't cut into the rail head.
 
20231228_184118.jpg
 
Another of the same thing:
 
20231228_184158.jpg
 
Fast tracks recommends using the little triangular file to file a notch in the rail, that would be larger than this kerf, and work just as well, but be more visible in the final product.
 
Then I brace the rail on something with the bend point right at the edge, and hold it down with my allen wrench (it came with a fast tracks pointform). 
 
This takes two hands, which made it hard to take a pic. I sort of held things in place with the file to free up my right hand. Normally the right hand holds down the right side of the allen wrench. I don't know why I feel more comfortable doing the bending with my left hand, but whatever, you can easily do it in reverse if you like.
 
20231228_184502.jpg
 
Left thumb on top of the allen wrench, which is on top of the rail, holding both down, and left middle finger bends the rail up by pushing up on the part sticking out over the edge of the wood bloc kc. This puts no pressure on the soldered joint. A little care in bending is necessary to keep the rail in the proper plane, but it can be torqued afterwards if its a bit off. 
 
You can see on the block of wood where I traced the outline of the first one of these I did and used it to measure where I wanted the kerf on the subsequent ones.
 
Here's the result  at super-zoom (I think it was 4.3x and six inches or so away):
 
20231229_010710.jpg
 
With the camera zoom I was able to see that there is a very slight tear in the rail foot on the outside of the rail where I didn't cut a kerf. That's fine, it's much smaller than if I'd cut a kerf and isn't visible to the naked eye from six inches. Its hardly visible even in this pic due to the angle.
 
I made all these pieces a little too long on purpose, before soldering them down I need to cut the ends to length, put a very slight bend in the rail and file a compound bevel on the end. Fast tracks recommends this treatment for the ends of guard rails. A slight outward bend is sometimes prototypical (depends on the prototype). The bevel is probably not prototypical, but it's got an important practical purpose: when you clean the rails you don't want rough ends of guard rails catching on any cleaning pads being dragged along the rails. So they say.
 
That bend is slight enough to do just with fingers without any kerf.

You can call me EW. Here's my blog index

Reply 4
Kevin Parson SeeYou190
eastwind wrote: "This takes two hands, which made it hard to take a pic. I sort of held things in place with the file to free up my right hand. Normally the right hand holds down the right side of the allen wrench."
 
I understand the difficulty, and I do appreciate the effort this takes.
 
Taking this picture by myself of tapping a 2-56 threaded hole was difficult as well.
 
-Photograph by Kevin Parson
 
I had to take the picture with my left hand, and I could not even look into the viewfinder as I did it.
 
I am glad you are explaining everything so well.
 
-Kevin
Living the dream and happily modeling my STRATTON AND GILLETTE Railroad in HO scale. The SGRR is a freelanced Class A railroad as it would have appeared on Tuesday, August 3rd, 1954, in my personal fantasy world of plausible nonsense.
Reply 2
Andy Reichert
eastwind 2 days ago · Edited
Edit: correcting the spelling corrector.
 
I don't really follow your logic there, you have to get the roadbed flat either way, right?
 
This is the overlooked big hole in all of the NMRA Track Standards. There is flat in a general visual layman  sense and flat in a mechanism functioning 100% reliably  sense.
 
Gluing  say 12" of wood ties to a homasote track bed and then just hand sanding with a sanding block  until they look flat is the former case.  The flatness an NMRA HO Standards compliant  vehicle with a rigid wheelbase actually requires is < a net 0.014" range of rail flatness  side to side.  (Half the depth of the NMRA HO Standard wheel flange depth).  That's because any wheel lifting of the rail by more than half way of the flange depth is at great risk of rail climbing. Especially on a curve.
 
That degree of flatness typically requires some pretty accurate testing methods and tools. Track built on an already proven flat base on the bench is much more likely to be within that specification.
 
Andy
 
 
Reply 4
eastwind
Now that I've got all the pieces, I wonder what the best order to solder them down is going to be? 
 
I was initially thinking I'd just go far side to near side, but maybe its best to do the 4 pieces that form the diamond and then slip the four 'V's in afterwards? 
 
I could spike everything down temporarily with just a couple spikes per piece, to get the alignment perfect, then pull the spikes on a piece at a time and solder that piece down. Or just depend on the paper template to show where things go. Spiking everything would let me test with the loose truck and measure the heck out of it with the NMRA gauge before committing anything. That seems worthwhile so I think I'll try that, but there's still the question of what order to spike things down and then the order to commit the pieces in afterwards. 

You can call me EW. Here's my blog index

Reply 2
ctxmf74
 "the best order to solder them down"
 
I'd start with the running rails ,then after they are all down and tested, shape the guard rails to fit and add them .....DaveB
Reply 5
eastwind
That's good advice if I were building a turnout. Not an option here, as the shaped pieces of rails are running rails in the middle and guard rails on the legs.
 
But it did make me go back and take a look at my template and realize I was missing (hadn't built) the inner diamond of guard rails. The only way your advice applies is to build and add that after the 8 pieces I've already built, which I was doing (by accident) already.
 
I may think about it for a day longer, but what I'm considering is putting down solder paste on the bottom of each rail piece where it needs to be, then spiking the pieces down lightly using just 2-4 spikes per piece, and get everything spiked (and tested) before soldering and pulling the spikes. 

You can call me EW. Here's my blog index

Reply 3
Andy Reichert
Not from experience, but my thinking would be to use a straight edge  (or better a metal tracksetter strip) to align and fix all the dead straight outside running rails first as fixed references, then the center running rails next . That way all the running rails should be in perfect alignment before you add any guard rails.
 
Andy
Reply 5
ctxmf74
"my thinking would be to use a straight edge  (or better a metal tracksetter strip) to align and fix all the dead straight outside running rails first as fixed references, then the center running rails next . That way all the running rails should be in perfect alignment before you add any guard rails."
 
  Yep, that is the traditional way to do it. The running rails can be continuous thru the middle ( lapped)or  three  pieced ,or a combination of both(one route continuous and one three pieced)  It don't really matter which you choose ,either will work.The key is just do it.  ....DaveB
Reply 3
dperry

 

eastwind wrote:
Now that I've got all the pieces, I wonder what the best order to solder them down is going to be? 
 
I was initially thinking I'd just go far side to near side, but maybe its best to do the 4 pieces that form the diamond and then slip the four 'V's in afterwards? 
 
I could spike everything down temporarily with just a couple spikes per piece, to get the alignment perfect, then pull the spikes on a piece at a time and solder that piece down. Or just depend on the paper template to show where things go. Spiking everything would let me test with the loose truck and measure the heck out of it with the NMRA gauge before committing anything. That seems worthwhile so I think I'll try that, but there's still the question of what order to spike things down and then the order to commit the pieces in afterwards. 
I'd suggest:
 
  -spike
  -measure/test/adjust/test/adjust...
  -solder a few places (pulling spikes only as necessary)
  -pull the spikes and solder the rail firmly
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 2
eastwind
I made the piece I'd forgotten, the center diamond guard rails:
 
20231231_215517.jpg
 
I'm really happy with how that turned out. It looks perfect dimensionally, even at high magnification.
 
The way I did it was I printed out another copy of the template so I could work right on top of the paper (with no ties in between). I made two 'v's first using my same jig that I've been using all along, then trimmed the legs about one mm long, then filed the ends with the proper angle, then filed a little more until the length was right. I tried to spike one piece down and solder the other onto it, but my first two tries weren't perfect and so I broke the two halves back apart, filed the solder off, and tried again until I got it perfect on the third try. By the third try I was just soldering on a piece of wood, concentrating on getting the ends to line up with each other, holding the pieces down with my fingers.  I didn't need to spike to the paper template for that after all. But it did help to have it printed out for filing the pieces to length, I could lay them right down on top of it to check.
 
So far still using the resistance tweezers and solder paste for all joints. 
 
I'm going to start with this piece in the middle, then work away from it in all directions, adding the D-shaped pieces with their middle edge next to the diamond. Then the big 'V's that make up the running rails outside the diamond last. If they don't want to line up perfectly with the middle I can break those soldered joints apart and redo them as necessary, but I think they'll work as-is. 
 
As you say I'll spike everything, check & adjust, then start soldering (unspiking one piece at a time, applying solder paste to the bottom, and putting it back in place (maybe even respiking it in the same spike holes) then zapping the little solder spots one by one.
 
It should be a lot easier to work from the middle-out versus having to try to fit in pieces into the middle after the outside pieces are down. 

You can call me EW. Here's my blog index

Reply 3
eastwind
Happy New Year!

You can call me EW. Here's my blog index

Reply 3
ctxmf74
"It should be a lot easier to work from the middle-out versus having to try to fit in pieces into the middle after the outside pieces are down."
 
  The reason it is better to start with the outside (running rails) is they are what really matter. If you get them right the inside guard rails are mostly cosmetic and can be added in pieces gauged from the running rails.....DaveB
Reply 2
eastwind
I already understood your thinking when I chose to politely ignore your advice and announce what I had decided I would do instead. I'm not going to start over and build it your way. You can see from the pictures above that I've already built subassemblies that have connected the running rails of the diamond to the adjacent guard rails, so I can't do it your way without breaking apart things I've already soldered perfectly well together. 
 
My opinion is that your technique results in something that doesn't look good, and I decided before I started that I want to try to do better, according to my own sense of what looks good. And that includes not hacking up the rail with a dremel to make lap joints and not filling the flangeways full of solder to hold things together. And not building in place and not spiking to ties, so that the trackwork is reusable and relocatable.

You can call me EW. Here's my blog index

Reply 2
ctxmf74
"My opinion is that your technique results in something that doesn't look good,"
 
  Technique doesn't determine looks. How you use the technique is what matters. You can build it any way you want but it should not become  a lifetime project. The common proven  techniques provide a crossing( or turnouts) in a few hours then one can move on.....DaveB
Reply 2
eastwind
Your impatience with how I do the hobby is your issue not mine, you can "should" at me all you want, I'm not yours to direct. Something I'm not happy looking at in a few hours is not my goal. Having you move on would be good.

You can call me EW. Here's my blog index

Reply 5
Reply