eastwind
At first I thought I was going to need a curved crossing at a low/sharp angle, but after doing a thread about that and then laying things out and rejiggering the plan, I've ended up with a 45-degree crossing.
 
Of course I could just buy a commercial one and be done, but I don't like the looks of them much. Too much black plastic where there shouldn't be any. The rail is the part of the model I can actually make.
 
I previously built a bunch of turnouts using fast tracks jigs, including a double crossover, and I've built a single curved crossover without a jig. Having learned some things from that, I am trying some things new to me on this build.
 
There are a couple other threads going about building crossings, but I didn't want to try using the lap method. It might be better, but I've never tried it, and I wanted to stick with doing things the fast-tracks way. So here goes.

You can call me EW. Here's my blog index

Reply 5
Kevin Parson SeeYou190
I hope this thread continues without all the noise.
 
I think your efforts look great, and I hope to see more.
 
-Kevin
Living the dream and happily modeling my STRATTON AND GILLETTE Railroad in HO scale. The SGRR is a freelanced Class A railroad as it would have appeared on Tuesday, August 3rd, 1954, in my personal fantasy world of plausible nonsense.
Reply 3
eastwind
Thanks very much for the encouragement, I worked on it some tonight, but got a bit shaky with the hands. I was trying to pull a spike that I had in that wasn't put in well and it wouldn't come and suddenly did come and in my muscle reaction to the sudden upward movement I drove the spike into my left index finger pretty good. So I took that as a signal to stand down and come back to the computer.

I have been checking the parts I make to make sure they are in gauge as I go, and discovered I needed to rework one part tonight, so that's what I got done before I spiked myself.

I guess 'spiked' is apropos for new years day.

You can call me EW. Here's my blog index

Reply 5
eastwind
I spent a while trying to use spikes to fix the location of parts temporarily, and gave up. I soldered down the central diamond, and then the first 3-leg piece making sure the flangeway between them was exactly what the gauge says it should be, and the edges were lined up with the sides of the diamond.
 
I put down all the solder for the first 3-leg piece, then realized I hadn't trimmed any of them or put the final bends and angles in their ends. So I wiped up the solder I'd put down and started to do that for all four. After doing one I thought, well, I'll just get this one soldered down and put the solder back down and so I at least got one of them stuck down.
 
It doesn't look like much progress, but I spent a half hour or more doing it, and shining up the top of the rail and cleanup afterwards. 
 
20240103_032501.jpg

You can call me EW. Here's my blog index

Reply 4
Bernd
Came across this while surfing the internet. It may help those who don't want to try EeastWind and Mike Huges method of making crossings. Never knew the prototype had this type of frog. The most interesting name for it was "leap frog".
 
 
Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 5
dperry
Hmmm....  "flange-bearing".  Could be tricky to implement with the eclectic mix of wheels we typically have on our model railroads. 
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 3
eastwind
I started adding the 3-leg pieces going clockwise around the diamond.
 
20240104_012550.jpg
 
 
20240104_032709.jpg
 
Doing the 3rd one it moved on me while I was doing the first two tack-down solders. I had to reheat that tie, then file it down and start over. Fortunately the pcb tie didn't delaminate.  
 
20240104_041043.jpg
 
I kept bumping the end ties that aren't soldered to anything yet and knocking them out from under their spikes, so I added two spikes more on each near the middle, but as you can see from the left one, it's not working. Probably really need 3 spikes at each end (one off the end and one on each side) to make a U-shaped holder to keep each end from moving. The problem will go away with my next solder step anyway.
 
Maybe I'll finish up the soldering tomorrow.

You can call me EW. Here's my blog index

Reply 4
eastwind
 
 
That's all for tonight:
 
 
20240105_003151.jpg
 
Left todo:
 
unpin it
wash it
cut gaps
fill gaps with nonconductive material
paint
place
 
I'm not sure if I want to do anything more before I unspike it or not. For example, I could add extra pcb ties further out if I thought I wasn't just going to cut those rails off. Picture doesn't show it, but I've 'wasted' about 6" of rail in all directions. The idea was to allow some later choice in where it attached to the track it attaches to, to avoid having to lay little sections of flex. So maybe if I'm going to follow through on that, I want to not put in any more ties yet. OTOH, I could put one in at the limits of the template to set the spacing for the wood ties. Even if I ended up cutting off the rail that would only waste one tie. There are about 5 tie outlines on the paper, a reasonable distance to go between pcb ties. I'll take suggestions that aren't "throw it away and start over doing things completely differently."
 
I could probably do a little more solder-blob filing now. 

You can call me EW. Here's my blog index

Reply 8
MikeHughes
Looks to be coming along very nicely. 
  • You're better at this than I would be in getting that inner diamond perfect, and I think it would need to be to get the outside rails perfect. 
  • Well done! 
So long as you have plenty of solder bonding the tips of the inner diamonds to the ties and all parts to each other, they should be safe when cutting isolation gaps (my downfall, but mine is curved and not symmetrical, which has been my achilles heel).
  • Based on my own distrous results, I would get in there with a magnifying glass and be sure that the yellow circled areas are absolutely rock solid bonded to the ties and each other.  My assumption is that the red lines are about where the gaps are going.  From this vantage point, it looks like you need more solder, unless it is really well bonded under the rail bases.
  • [Photo Updated]
EW Crossing - Mod 2.jpg
Happy NMRA Member since 2024
Reply 4
eastwind
Thanks for your kind words. It's not perfectly perfect, but I'm pleased with how it came out, very good for first attempt. I think it's going to operate smoothly.

If I had it to do again, I'd do the inner diamond before the 3-legged pieces, then use the diamond as a reference in building the 3-legged pieces, matching them up against the diamond as I figured the place to do the bend.

If you decide to try to build one this way, you'll definitely be well-served to make a slot-jig in aluminum for getting the frog angles perfect. The key to the whole thing is being able to make 8 identical frogs. My wood one was barely adequate, and I'd certainly make a slot-one if I had the mill to make it.

For curved, I dunno. Definintely more difficult. I guess what I'd do is make the frog angles all the same (including the two that fit together to make the diamond) and then try to curve the legs appropriately.

You can call me EW. Here's my blog index

Reply 2
dperry
MikeHughes wrote:
Looks to be coming along very nicely. 
  • You're better at this than I would be in getting that inner diamond perfect, and I think it would need to be to get the outside rails perfect. 
  • Well done! 
So long as you have plenty of solder bonding the tips of the inner diamonds to the ties and all parts to each other, they should be safe when cutting isolation gaps (my downfall, but mine is curved and not symmetrical, which has been my achilles heel).
  • Based on my own distrous results, I would get in there with a magnifying glass and be sure that the yellow circled areas are absolutely rock solid bonded to the ties and each other.  My assumption is that the red lines are about where the gaps are going.  From this vantage point, it looks like you need more solder, unless it is really well bonded under the rail bases.
EW Crossing.jpg
EW, looks really good from what I can see.  If you are happy with the way it works then that is a complete win for you!  I agree with Mike (and based on my experience) - make sure that the yellow-circled areas are very well bonded before you cut the gaps.  I lost a tiny piece on my first one and had an 'interesting' time getting it back in.   The crossing functioned, but it did not look as good post-repair.
 
Since you have the extra rail, consider attaching some flex to the legs and testing the heck out of the crossing with short strings of finicky cars.  Maybe even ones with slightly out-of-spec back-to-back 😁.  Cut the gaps when you are satisfied with the performance.  Just a suggestion.
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 1
ctxmf74
"make sure that the yellow-circled areas are very well bonded before you cut the gaps."
 
  The best way to ensure that is to cut the diamond gaps right down the centerline of the tracks, leaving equal sized pieces on each side of the gaps. .....DaveB  
Reply 0
eastwind
I think you know this but, for anyone else, the gaps don't get cut all the way top to bottom as shown by Mike's red lines, only the inner rails attached to the yellow-circled areas.
 
I'll have a look at it with a magnifying glass before I do the cuts. With the resistance unit and paste, what I do is put paste down on the ties first. The paste is gooey, and wants to stick to itself more than anything else, and doesn't want to stick to the ties, so it's hard to measure it out. What I do is get a blob on the end of my steel needle probe tool and then spin the tool slowly to get the solder off the tool tip and onto the tie. It's time consuming, I spend longer doing that than the actual soldering. When I have blobs on all the ties I put the rail down on top. It squishes the blobs, and if I've used a lot the solder gets pushed out on the side. 
 
When I zap the joint with the resistance unit, I only give it a second. That's enough to make the solder under the rail flow and bind. It's often not enough to make the blobs to the left and right flow (they are just sitting on the tie and not really touching the rail, which is what's getting hot), and I can clean off the unused paste. Sometimes I zap a little too long and I get sort of round solder balls on each side, but not over the rail foot. Those I file off.
 
On the rail closest to you in the edited pic above, to the left of center, you can see a few blobs that I haven't filed off yet. I'd need to use the file left-handed or rotate the whole thing and lean over it to get at those, which is why they are still there in the photo. I will do that filing before I cut any gaps.
 
But this is a long story to say that there should always be solder under the rail, and not just a thin wicked amount, but maybe a bit more than that. It's a feature of the way paste is used with resistance soldering that you don't get solder up over the rail foot.

You can call me EW. Here's my blog index

Reply 1
eastwind
Another thing is that I plan to use my usual technique of having the jeweler's blade in the saw backwards, i.e. with the teeth pointing forwards, and I plan to use only pull strokes (so the teeth are being dragged backwards across the metal, and not in the 'cutting' direction. This makes the saw much less efficient, but much smoother. Less efficient I can deal with by being patient.

You can call me EW. Here's my blog index

Reply 1
MikeHughes
Right you are on the gaps - diagram updated here and up above.
EW Crossing - Mod 2.jpg
Happy NMRA Member since 2024
Reply 0
Kevin Parson SeeYou190
So, thinking this through, it looks like in my double crossing I intend to build I will need three of the diamond pieces.
 
Ugh.
 
-Kevin
Living the dream and happily modeling my STRATTON AND GILLETTE Railroad in HO scale. The SGRR is a freelanced Class A railroad as it would have appeared on Tuesday, August 3rd, 1954, in my personal fantasy world of plausible nonsense.
Reply 0
John P
I'll repeat a picture that I posted last year. If it's a crossing that would be used on light-duty track, you might choose not to have guard rails going all the way through. That would mean that the amount of accurate fitting could be a lot less!
diamond_sawyer.jpg
Reply 1
eastwind
SeeYou190 wrote:
So, thinking this through, it looks like in my double crossing I intend to build I will need three of the diamond pieces.
 
Ugh.
 
-Kevin
In making the center diamond, I used the jig to file the rails for the sharp points to create two V's. Then I trimmed the V's legs to length, just a little long, and then kept filing on them to shorten them to the exact length. The angle needed on the ends of the V's legs I just eyeballed because the completed V wouldn't fit in my jig, that didn't prove to be a problem. What was hard was keeping the two pieces lined up while I soldered them together - it took more than one try. And then it turned out I'd measured a little bit wrong and the V was too large for the gauge and I had to break it in half again (not difficult, it snaps at the solder joint), file a bit more (again by eyeball for the angle) and solder it together again. 
 
The good thing is you're just working with rail, no ties, and you can solder and resolder rail as many times as you need to. If it takes you a lot of tries you'll probably end up with a lot of solder in the web, but that's very difficult to see and doesn't affect operation. And if you end up throwing away a try and starting completely over, you're only tossing two inches of rail, it's really a low-risk thing to just keep trying.

You can call me EW. Here's my blog index

Reply 2
eastwind
edited.jpg
 
So in addition to the places Mike marked above, where there's danger of the thing breaking apart when the gaps are cut, there also need to be gaps cut at the ends as I've shown above.
 
With those cuts, I'm a bit worried because after the cut the inside running rails will only attached to one tie. So I'm thinking to add some more pcb ties now while I've got it still pinned down. 
 
I'm not really sure, though, how to transition from the long ties at an angle to the rails to the short ones that are perpendicular. The template has the pcb ties laid out as I have them, and the two ties that I point to with red arrows are just as you can see - they end half way across. 
 
While there's a prototype for everything, that particular trick looks unlikely to me - unless there is meant to be some kind of plate joining the two ties where they come together to make a Y-shaped tie. 
 
If I didn't have the diagram, what I'd do is make a sort of fan shape out of multiple ties, with the ends rubbing at one end and then fanning out at the other to go from being at an angle to perpendicular with one or two ties in between. If that's what I'm ultimately going to do, then I think I'd like to make those fan ties out of pcb and solder them in now. 
 
Or if I should fashion some kind of plate to make a Y-shaped tie that would be easier to do if I make both parts of the Y with pcb ties and the plate soldered to them. Except I can't think how to make the metal plate. 
 
I decided to stare at the crossing for a night while I wait for people to post suggestions and ideas. I'm not in a hurry to ruin it...

You can call me EW. Here's my blog index

Reply 1
eastwind
I realized I have plenty of off-cuts of pcb tie that are too short for a regular tie, so making one as per the template wouldn't cost me anything.
 
So here it is, but it's not attached yet in any way, just filed at an angle and slid under the one rail:
 
20240105_231259.jpg
 
It doesn't seem to me it would do anything in the prototype unless there was some way to anchor the angled end to the long tie. I suppose I could lay down a solder blob bridging between the two ties (I'll need to file an electrical gap if I do), but will that really buy me anything in terms of holding things together?

You can call me EW. Here's my blog index

Reply 1
Popcorn Thad
eastwind wrote:
I'm not in a hurry to ruin it.
That's a good idea; take your time. Looks good so far. I'm tempting to try and build a crossing or two someday. Not in a hurry and ask for tips and suggestions are wonderful way to do things enjoyable.
Thad
Reply 1
ctxmf74
" what I'd do is make a sort of fan shape out of multiple ties, with the ends rubbing at one end and then fanning out at the other to go from being at an angle to perpendicular"
 
 That would be the common way to do it. Normally the fan out would start a bit closer to the center of the crossing , maybe two less long ties would be used....DaveB
Reply 1
Andy Reichert
ctxmf74 wrote:
" what I'd do is make a sort of fan shape out of multiple ties, with the ends rubbing at one end and then fanning out at the other to go from being at an angle to perpendicular"
 
 That would be the common way to do it. Normally the fan out would start a bit closer to the center of the crossing , maybe two less long ties would be used....DaveB
These prototype diagrams may help:
 
diamonds vs angles-700.jpg
 
Andy
Reply 2
eastwind
Thanks very much to both of you for that info!
 
The long ties do look funny to me, but I laid them down under the assumption that fast tracks knew what they were doing, so I followed their template. I can see why they did what they did, those long ties have to be one long piece given where the electrical gaps are going to be cut to isolate the frog - if adjacent pcb ties just join two rails and you cut a gap in one that's unstable.
 
I could, if I wanted to, desolder the last long tie and replace it with two short ties at an angle to the next-to-last long tie in order to start the 'fan' one tie sooner. If I do that, I would move the outside electrical gaps further away from the frog, after the fan is finished, and use a gapmaster to preserve gauge and alignment where I cut the electrical gap. It would take four gap masters. 
 
But I think at this point I should probably just finish this one off and see whether it holds together, and leave the alternative tie layout for the next iteration, if there needs to be one. I can maybe cover up the middle of those long ties with some dirt or something. 
 
I might add the 'fan' ties tomorrow using pcb ties for that, without messing with the long ties that I already have.

You can call me EW. Here's my blog index

Reply 3
dperry
I think that not messing with the long ties at this point is the right move.  Ballast, paint, etc. will hide a lot of what you don't like.  Now that you have proved to yourself that you can build a crossing this way, you can always build another 😁
 
David
Everyone is entitled to an opinion. It's rather a shame that not everyone keeps it to themselves. That's my opinion.
Reply 1
ctxmf74
"I think that not messing with the long ties at this point is the right move."
 
Yeah, I agree. Either way it's going to take about 3 short ties to fan back to square with the track....DaveB
Reply 1
Reply