Unless I messed up and posted an image twice, those 4 pics are intended to line up the 4 stock rails as if sighting along each rail. They are all close, but not perfect.
But a truck rolls through it very smoothly nonetheless, and from normal viewing I don't think the imperfection will be noticeable.
This job is a lot harder than a turnout, and I'd recommend to anyone else at a still-improving skill level like me to just buy the fast tracks jig if one is available for what you need. And to try and change your layout plan if one isn't.
That said, here are some of the things that I did differently the second time, and how they worked out:
1. Spikes into pine
Spiking into pine to hold down the ties: It was a lot of hassle. It worked really well once I got the spikes in, but I bent a lot of spikes along the way. The pine has spots where it's nice to spike into and spots where it's a good bit more difficult. And knots, where it's impossible. I aligned the template so that all the spiking would be not over a knot, but still found some areas where it was really hard to get the spikes in.
It did however do a good job of holding the ties in place, only a couple slipped out from under the ends of the spikes on one end before I got some rails soldered to hold the ties in place, and I could easily fit it back under the spike and push the spike down a little harder. As you can see, I only used 2 spikes per tie, and over the ends rather than trying to drill holes in the ties.
I also used the spikes some to hold the rails in place while I made the first solder joints holding that bit of rail down. It was handy being able to do that. What I'd do is put the rail down, add a spike or two along its length, maybe push the spikes a little bit one way or another to get things perfectlyl lined up, then pull the spikes, put down solder paste and the rail, and reinsert the same spikes in the same holes, then solder. That provided pretty good control over getting the rail in the right place.
For some reason, I forgot that I had 3-point rail gauges that would do the same thing until most of the way through. They work just as well, and do a better job at keeping the rail from being tilted slightly.
So the next time I try to build a non-jig rail project, I think rather than looking for something else to spike into that holds as well as pine but isn't as hard to spike into (what I need but don't have is a nice big & thick piece of basswood), I'll go back to trying to hold the ties to the template with some kind of glue.
2. The middle diamond
I made the center diamond check rails first. As before, I made two V's using the wood jig to file just two ends of the rails to be joined and leave the legs of the V's long. I laid them one on top of the other as well as on the paper template to check that they were the same angle. Then I trimmed and filed and trimmed and filed on the legs of the V's until I got the V's the right size, then soldered them together, doing all this work not on the ties but off to the side.
For some reason (another mental breakdown) I relied only on the template to size the diamond, and got it perfect and then soldererd it down on the ties and then decided to check it using the NMRA gauge. It was too big. So I desoldered it, broke it in half (again), filed away on the ends some more, soldered it back together, discovered it still wasn't small enough, and repeated. Getting that center diamond just right isn't something I think most people will be able to easily do on the first try. But building it off to the side lets you iterate. It's easy enough to hold it in two hands and snap apart the two V's if you need to file some more off.
3. The U-shaped check rails that are the stock rails when next to the diamond
Before I started by making a V with two rails, then bent one leg to make the second angle. It's really hard to figure out ahead of time where that bend is going to actually be before you make it. I kerfed the rail, then bent the rail on the kerf, and the bend wouldn't be a perfect angle but a slight radius and sometimes a mm off from where I'd aimed for.
So this time I filed the ends for the two halves of the V, then bent one, then aligned the bend where it needed to be on the template and checked the length of the leg running alongside the diamond. Then I filed on that until it was the right length, and only then soldered on the other leg to make the sharp angle.
A realization I had somewhere along the line is that when making a sharp angle for a frog, the angle the rail is filed at doesn't really matter as much as I thought. If you file the ends at too sharp an angle, they don't mate, but the gap fills easily with solder. You can't file the angle too little however or you get a double-point. To get an exact angle, the most important thing is to hold the pieces in the right orientation with respect to one another. My wood jig was as perfect as I could make it, but still a bit off. It's probably 46 degrees instead of 45. So V's made off-template were naturally just a little off. That didn't matter in the end, as long as the bits of rail were short.
I did quite a bit of trial and redo getting the 4 U-shaped pieces correct. I made a mistake and fixed the ends of them (bending them a little bit) sooner than I should have. At that point they didn't fit back into my wood jig. So I cut away a bit of the jig where the ends would fall so the bent ends would fit. I did some soldering of these parts in the wood jig, and you can see where my resistance iron burned the jig a bit.
4. Lastly I added the long stock rails. I started with one, then went around the crossing adding each in turn, that way I could use the 3-point gauges to hold the next rail in place and in gauge. I didn't pre-solder the pieces into V's as I did on the first attempt, the problem with doing that is the V's don't come out at the perfect angle and you get crooked stock rails. Letting the V point be formed by soldering one rail, putting a dab of solder paste on the end of the other rail as well as dabs on the ties underneath it, holding it in gauge and then soldering the point together after a couple spots are holding the rail down was a way that worked better. Once I ended up with a half millimeter gap because I hadn't slid the first rail far enough toward the point. I removed that rail and resoldered it.