DJH4d
Hi all, we've been working on this for over a year and now I think we finally have enough to show what we've gotten done. This started back in 2017 as an inside joke, but it took on a life of its own. I bought a lot in Middle Tennessee and built a 100' x 53' pole barn home with a 100' x 40' shop area. These are know as "Barndominiums". The shop area was finished out with climate control and will be used as a train room. We're modeling the ATSF/BNSF Southern Transcon from Willows Springs, IL to Vaughn, NM. We may continue west, but that's not for sure yet. The years modeled are 1990 - 2006.

Anyway, l will be posting a series of updates over the next few weeks to show our progress. We also have a Facebook group for those who use it. Starting with the building, these are from Oct/Nov of 2020.

Thanks for looking,
-Dave
Capture.jpgfsadfasd.jpgggsdff.jpg
Reply 19
DJH4d
eastwind wrote:
How are you throwing your turnouts? Finger flick, switch stand, by machine? Will you have central dispatcher control over any turnouts?
Hi EW, we use Circuitron switch machines on all of our switches. To control these, we use Digitrax DS74s connected to our ESU ECoS system using LocoNet cable. We use RR & Co. dispatch software to control the railroad and through this, we can operate most switches on the layout. For local switches, the operator can operate them using their throttle. We may install push buttons on the fascia at a later date.
 
Here's what our dispatch screen looks like.
Capture.jpg
 
Let me know if you have any other question,
-Dave
Reply 8
DJH4d
Once everything was marked out, we pretty much a repeat of what we did on the branch line. Following the lines, we glued track cork down with Elmer's Glue.
10.jpg
 
 
More progress in Shattuck. You may notice a square hole in the foam. Those are holes for switch machines. Those are mounted on a square piece of wood and hot glued flush with the foam. That way the switch machines are attached to something more solid.
11.jpg
 
Progress in Woodward. Most of the cork is installed and track work has started. This is the crossing with the NOKL short line. Like the real thing, we do have an interchange and a small yard.
12.jpg
 
-Dave
Reply 10
andersjm
A huge, mind boggling project!  I have a question about the track. I believe you mentioned using a 40 inch minimum radius but do your mainline curves have spiral easements?
Reply 1
DJH4d
andersjm wrote:
A huge, mind boggling project!  I have a question about the track. I believe you mentioned using a 40 inch minimum radius but do your mainline curves have spiral easements?
Hi andersjm, we don't use spiral easements because we don't see a need for them.
 
Let me know if you have any other questions,
-Dave
Reply 1
DJH4d
 As tracks advanced, we also got a few signals installed. However, they're not wired up yet.
13.jpg
 
 More signals and tracks in Woodward.
14.jpg
 
More tracks in Shattuck. Notice that some of the tracks have concrete ties. Just like the real thing.
15.jpg
 
-Dave
Reply 7
DJH4d
You may have noticed that I keep referencing the real thing and I did mention a group trip. Back in July, we took a railfan trip and covered the area of the Transcon we're modeling. While out there, we got lots of pictures and took dirt samples from the areas on the layout. We still need to take a trip to the Joliet division, but that will come next year.
 
16.jpg
 
While track was being installed, we started on the wiring for all the new stuff being installed.
17.jpg
 
Another look under the hood. We use Digitrax DS74s to control our switch machines.
18.jpg
 
Enjoy,
-Dave
Reply 9
DJH4d
We have been making good progress, but my updates have been slow. I'll work at getting everyone up to speed.
 
More progress in Shattuck. You can see the branch line splitting off on the right. It's the track with the weights on it.
19.jpg
 
Progress at Higgins, TX. There was a grain elevator here, but it's gone now. Since it was there during the Santa Fe era, we're going to include it. Branch line on the right.
20.jpg
 
Overall progress. We're stopping at Fort Summer, NM for now until we get the bridge figured out.
21.jpg
 
More progress pics will be posted soon.
 
Enjoy,
-Dave
Reply 8
Nathan nespeefan
Wow, I just stumbled onto your thread!  This is incredible.  I've never seen such a massive model railroad layout like this before.  I am both amazed, and at a loss for words.  You must have an incredible crew and some strong friendships with them.  Truly a team effort.  Looking forward to seeing more updates.
 
One quick question - I couldn't help but notice the 3D shaped Santa Fe Dash 8 or 9 hanging on the wall above the dispatcher computer screens.  Is that scrarchbuilt, or something you purchased?  I really like it!
Nathan
Reply 1
Terry Lovell RailfanTerry
One quick question - I couldn't help but notice the 3D shaped Santa Fe Dash 8 or 9 hanging on the wall above the dispatcher computer screens.  Is that scrarchbuilt, or something you purchased?  I really like it!
Hey Nathan The Santa Fe -9 is made by Stoddart’s Ltd Company, It made out of wood, The lights do work also
IMG_4095.jpg
 
Terry

Santa Fe all The Way

Reply 1
Terry Lovell RailfanTerry
Wow, I just stumbled onto your thread!  This is incredible.  I've never seen such a massive model railroad layout like this before.  I am both amazed, and at a loss for words.  You must have an incredible crew and some strong friendships with them.  Truly a team effort.  Looking forward to seeing more updates.
 
One quick question - I couldn't help but notice the 3D shaped Santa Fe Dash 8 or 9 hanging on the wall above the dispatcher computer screens.  Is that scrarchbuilt, or something you purchased?  I really like it!
A up close shot of it
30706351_1610925502276410_1794009776569450496_n.jpg
 
 
Terry

Santa Fe all The Way

Reply 4
Nathan nespeefan
Thanks Terry!  Boy, that is really slick!  I like it a lot.  I may have to track one down for myself.  
Nathan
Reply 2
DJH4d
Picking up with the last update picture, more progress has been made at Higgens, TX. The branch line in this area is almost done.
 
1.jpg
 
Looking the other way. Most of the track for this section of the third level is done. Switch machines were installed and signals are currently being installed and wired up.  In this view, the curves may seem pretty sharp and that's because of the field dept. All the mainline curves are 40"+ .
 
3.jpg
 
Over in Woodward, OK, all the switch machines were wired up and programmed into the computer. Also, more signals popped up.
2.jpg
 
Enjoy,
-Dave
Reply 5
DJH4d
We took a break and had a final running session before the layout was taken out of service due to ongoing construction. This is the last of the "fun run" style running sessions we have been having and once the layout is ready to run again, we'll have a proper ops session.
 
With that being said, let's take a look at some of the trains that were ran.
 
Pig vs Container - Who goes first? A couple of hotshot Santa Fe trains wait their turn for the return loop.
4.jpg
 
Some foreign power (literally) in the staging yard.
5.jpg
 
Waiting for their turn to come out of the staging yard and hit the main line.
6.jpg
 
 
Of course, no running session is complete without grilling. The local chef getting supper ready for everyone.
7.jpg
 
Enjoy,
-Dave
Reply 11
tp
I've had dreams that looked a lot like this.. XD
Reply 3
UglyK5
EPIC BUILD!  Keep it up and please keep sharing progress updates. 
jeff
—————————————
“Think before you post, try to be positive, and you do not always have to give your opinion.....”
-Bessemer Bob
Reply 2
DJH4d
With the running session over, it was time to "burn the ships." We had to remove one of the temporary return loops to make way for the helix. Until the helix, 2nd, and 3rd level is done, we cannot run trains. Since the 3rd level is about 75% done already, this is not as horrifying as it sounds. We think this will take about 4 months.
 
Here's the removed temporary loop. It's going to be reinstalled once the helix is complete because we will need it until Willow Springs is built.
8.jpg
 
The space it occupied. You can see the benchwork and brackets for all three levels it needs to connect.
9.jpg
 
Using a print out from AnyRail, we marked out and cut the curved pieces for the helix. Each one is 45 degrees of a loop and will be painted black and glued together.
10.jpg
 
More to come...
 
-Dave
Reply 7
DJH4d
We built a frame and base for the helix. Pretty straight forward as this will support the rest of the helix.
11.jpg
 
We finished the support with legs as this is going to be pretty heavy. We oped to use the rod and bolt method of building the helix. Each rod is a little over 5' long.
12.jpg
 
While waiting for glue to dry, we do work on other areas of the layout. More signals were wired up and programmed in RR&Co.
13.jpg
 
Enjoy,
-Dave
Reply 12
trainzluvr
I would suggest using ME track in your helix as it keeps its shape to whatever radii you desire.
 
This way it can be pre-curved and put in place, because laying other brands of track with the rods in the way  (unless your rod spacing is 36"+)  is a real pain in the butt as they don't keep their shape.
 
I'm using PECO in my threaded rod helix and regret it now... 😠
 
Also, to secure the track to the sub-roadbed, consider using miniature screws (can be found from this guy in UK). Just pick the length that is adequate (whether there's cork or not under track).

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 1
barr_ceo
trainzluvr wrote:
I would suggest using ME track in your helix as it keeps its shape to whatever radii you desire.
 
This way it can be pre-curved and put in place, because laying other brands of track with the rods in the way  (unless your rod spacing is 36"+)  is a real pain in the butt as they don't keep their shape.
 
I'm using PECO in my threaded rod helix and regret it now... 😠
 
Also, to secure the track to the sub-roadbed, consider using miniature screws (can be found from this guy in UK). Just pick the length that is adequate (whether there's cork or not under track).
 
Use caulk/glue, put a piece of corrugated cardboard atop the rail, and lightly clamp with a  C clamp.

Read my Journal / Blog...

!BARR_LO.GIF Freelanced N scale Class I   Digitrax & JMRI

 NRail  T-Trak Standards  T-Trak Wiki    My T-Trak Wiki Pages

Reply 1
trainzluvr
barr_ceo wrote:
 
Use caulk/glue, put a piece of corrugated cardboard atop the rail, and lightly clamp with a  C clamp.
Already been there but it takes hours for the caulk to dry. I could be done a whole loop by the time a piece of track with caulk dries.
 
I weigh it down with some soft steel blocks, but using caulk is simply not efficient at all. Maybe it works for anyone retired, but I don't have that much free time, so have to optimize every minute I can. 😄

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 1
trainzluvr
 
Further more to the helix build, before going crazy threading all the nuts and washers and what not for each deck, here's another consideration/alternative for you.
 
This is my helix in progress:
 
helix_build_1.jpg    helix_build_2.jpg
 
The blue tube is a PEX water pipe, available from many suppliers and comes in a variety of diameters and colours. I picked the one that best fits the rods.
 
Cutting the PEX with a tool like this (this brand/model is not expensive and it cuts really well)
 
helix_build_3.jpg
 
It all goes fast and the only slowdown is waiting for culk to dry (under the cork). I'm using miniature track screws to secure the track to the roadbed, pre-drilling the holes in-place.
 
Hope this gives you more ideas...

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 3
CandOfan
I take it that the pipe is accurately cut to the spacing between the roadbed, thus making it straightforward to get them even? Sounds like a good idea, which I'll have to remember when I get to my helix in a few months...

Modeling the C&O in Virginia in 1943, 1927 and 1918

Reply 0
trainzluvr
CandOfan wrote:
I take it that the pipe is accurately cut to the spacing between the roadbed, thus making it straightforward to get them even? Sounds like a good idea, which I'll have to remember when I get to my helix in a few months...
That's correct - I had a 4" rise between loops, so with 1/2 plywood (1/4"+1/4" actually) it was 3-1/2" length per pipe piece. This was after the first loop incline was defined, where the pipe length was increasing by 9/16" at each post.
 
There will only be one nut at the top of each rod to secure the structure below it. I used T-nuts embedded into a thick rubber mat pieces as a footing, and then ran each rod through the benchwork and fastening it with another nut underneath.
 
helix_build_4.jpg

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star
This is nuts.
 
😄
 
Great idea! And your layout is really impressive!
 
Have fun
Reply 1
railandsail
trainzluvr wrote:
That's correct - I had a 4" rise between loops, so with 1/2 plywood (1/4"+1/4" actually) it was 3-1/2" length per pipe piece. This was after the first loop incline was defined, where the pipe length was increasing by 9/16" at each post.
 
There will only be one nut at the top of each rod to secure the structure below it. I used T-nuts embedded into a thick rubber mat pieces as a footing, and then ran each rod through the benchwork and fastening it with another nut underneath.
 
helix_build_4.jpg
 
 
You should record some of your helix building ideas over on some 'helix threads'.
Reply 0
Reply