DJH4d
Hi all, we've been working on this for over a year and now I think we finally have enough to show what we've gotten done. This started back in 2017 as an inside joke, but it took on a life of its own. I bought a lot in Middle Tennessee and built a 100' x 53' pole barn home with a 100' x 40' shop area. These are know as "Barndominiums". The shop area was finished out with climate control and will be used as a train room. We're modeling the ATSF/BNSF Southern Transcon from Willows Springs, IL to Vaughn, NM. We may continue west, but that's not for sure yet. The years modeled are 1990 - 2006.

Anyway, l will be posting a series of updates over the next few weeks to show our progress. We also have a Facebook group for those who use it. Starting with the building, these are from Oct/Nov of 2020.

Thanks for looking,
-Dave
Capture.jpgfsadfasd.jpgggsdff.jpg
Reply 19
Chris VanderHeide cv_acr
jeffshultz wrote:
i'm going to be interested to see why the brackets are upside down. Or was that explained previously?


I'd imagine to keep the lower backdrop clear
Reply 1
Eugene Griffin EGRX
jeffshultz wrote:
i'm going to be interested to see why the brackets are upside down. Or was that explained previously?


Looks like the assembly steps are
- build the lowest level
- mount backboard
- attach the next level by attaching the brackets from the top

Getting at those brackets from below would be difficult, with or without the finished track.
Reply 1
railandsail
Upper deck cantilevered off metal beam rather than multiple individual brackets.

https://forum.mrhmag.com/post/metal-benchwork-12207979?highlight=metal%20benchwork&pid=1331276971
https://forum.mrhmag.com/post/metal-benchwork-12207979?highlight=metal%20benchwork&pid=1331289376

https://forum.mrhmag.com/post/interesting-track-plan-tupper-lake-faust-junction-12208132?pid=1332101914
[1]


3 decks with No individual brackets top or bottom.
Reply 1
UglyK5

just discovered this build thread… awesome stuff… and really striking how clean, neat, and professional it all looks at every phase this far. I love a tidy worksite!  Thanks for sharing and looking forward to updates

jeff

—————————————
“Think before you post, try to be positive, and you do not always have to give your opinion.....”
-Bessemer Bob
Reply 1
DJH4d
jeffshultz wrote:
i'm going to be interested to see why the brackets are upside down. Or was that explained previously?


EGRX is correct.  You can see in a couple of previous pictures that the brackets are attached to the top of the second level. We're doing this because most of the track is going to be on risers and the scenery will be level with that. That way you won't see the brackets at all when you look up at the bottom of the upper levels. 

-Dave
Reply 2
DJH4d
Continuing with the backdrop.
10.jpg

More backdrop
11.jpg

Still more backdrop.
12.jpg

One of these days we'll finish this up and be able to start on the bench work for the next two levels.

Thanks for looking,
-Dave
Reply 5
DJH4d
"Are those clouds?" Nope, I've started to tape and mud the seams and staple holes in the backdrop board. Once sanded, it will get a final coat of paint.
13.jpg

The cork for the yard at Emporia, KS was glued down. We bought a couple of rolls that were 4'x30' and there's only one seam in the entire yard. It's amazing what you can find on the internet.
14.jpg

We did have a running session a few weeks ago. Here's a shot of some of the trains that were ran.
15.jpg

Thanks for looking,
-Dave
Reply 9
DJH4d
Hi all, I know that the updates have been lacking, but things have been moving forward. In the mean time, here's a video from the last running session showing all the trains that ran including a time-laps.

https://www.youtube.com/watch?v=iUcHLFJI6Bs&t=150s

At the moment, they layout is currently down as everything is covered up to protect it against drywall dust from all the backdrop construction. Hopefully, we'll be up and running in a month and we'll be ready for the next running session around April.

Thank you for looking,
-Dave
Reply 6
DJH4d
We've been busy in the last 4 months since my last update. The backdrop is 99% complete and bench work for the third level is almost complete.
 
 Because of the weather over the winter, some of the backdrop was not pre painted before it was installed. However, we found this wasn't an issue once all the backdrop got it's final coat of paint. Seen here, we ended up putting full 4x8 sheets in.
1.jpg
 
While that was happening, the bench work for the third level was started. The plan is to do all the third level bench work, roadbed, track, wiring, and switch machines before we start on the second level. That way, we have a little more room to work. It'll be a different story once we start building the second level as the first level is already installed.
2.jpg
 
Pretty straight forward. Sheets of Eucaboard was cut into the appropriate width for each level and then glued together to make 16' strips. Everything was glued to the studs with Liquid Nail construction adhesive and was stapled in place until the glue dried.
3.jpg
 
Enjoy,
-Dave
Reply 5
DJH4d
Once the glue was dry, all the seams and staple holes were taped and filled in using drywall putty. 4.jpg
 
After the putty was dry, it was sanded and received it's final coat of paint forming a nice smooth surface. Once we start scenery, a photo backdrop will be glued on. But, that will come later.
5.jpg
 
The process was repeated for each wall and each wall took a week to complete. Since there's 5 walls, this took 5 weeks just for backdrop. Hence, you can see why I flinch when someone mentions backdrop around me.
6.jpg
 
Thank you for looking,
-Dave
Reply 9
DJH4d

 Once the glue was dry, all the seams and staple holes were taped and filled in using drywall putty.
4.jpg

After the putty was dry, it was sanded and received it's final coat of paint forming a nice smooth surface. Once we start scenery, a photo backdrop will be glued on. But, that will come later. 
5.jpg

The process was repeated for each wall and each wall took a week to complete. Since there's 5 walls, this took 5 weeks just for backdrop. Hence, you can see why I flinch when someone mentions backdrop around me.
6.jpg
 
More to come later,
-Dave
Reply 4
DJH4d
More progress on the backdrop on the inside of the divider wall.
7.jpg
 
Starting to come together. This also shows why I like the Eucaboard. It's smooth on one side and has a rough texture on the other. That helps when gluing it to stuff. It's also really flexible. As seen here, it wraps around curves without any breakage.
8.jpg
 
Still more progress on the backdrop. At this point we continued on the bench work for the third level. Seen here, we started building the "duck under" on this side of the layout. But, since the third level is 74" high, there's not much ducking under here.
9.jpg
 
Enjoy,
-Dave
Reply 7
DJH4d
10. With backdrop work (finally) winding down, it was full steam ahead on the bench work. We opted to start with the end of the branch line and work our way back.
10.jpg
 
More bench work and the top of Curtis Hill can be seen on the right. We braced up the bench work with 2x4s until I got the brackets attached. It should be noted that in addition to screwing the bench work together, we also glued it. We found that it really increases the stiffness of the bench work and increases strength. How stiff is it? I can do pull ups from it.
11.jpg
 
 
The bench work on the other end.
12.jpg
 
Enjoy,
-Dave
Reply 6
Bessemer Bob
The scale of this project is such I can’t even comprehend it. Truly impressive 

Think before you post, try to be positive, and you do not always have to give your  opinion……

Steel Mill Modelers SIG, it’s a blast(furnace)!

Reply 4
Hudson Yard
the blue and black benchwork is certainly cosmetically pleasing, much better then lots and lots of bare plywood. how many operators are you planning for?
Reply 2
DJH4d
Hudson Yard wrote:
the blue and black benchwork is certainly cosmetically pleasing, much better then lots and lots of bare plywood. how many operators are you planning for?
 
Currently, we can run 10 trains at once without bogging the railroad down. Once the second and third level is done, we'll be able to run around 25 trains at once. We're limited to 8  operators because that's how many throttles we have. If folks bring their own throttles or we figure out how to adapt the command station to run off of other DCC manufacturers throttles, we can have more operators.
 
Thank you for asking,
-Dave
Reply 2
DJH4d
Recently, our group was invited to give a clinic at the 2023 Indianapolis Santa Fe Mini Meet and we got to run trains on Tom Cain's Eastern Illinois Santa Fe layout.
 
 Local heading out.
19.jpg
 
One of 18 trains we ran.
20.jpg
 
The Mini Meet was held at Allisonville Christian Church and was attend by over 50 people. That's yours truly up front while the rest of our group looks on. Notice that they're wearing the new layout swag.
21.jpg
 
Thanks for looking.
Enjoy,
-Dave
Reply 10
DJH4d
One of our group recorded the presentation and uploaded it to Youtube. It's about 41 mins long and covers building the layout with a Q&A session afterwards.
 
 
Enjoy,
-Dave
Reply 4
DJH4d
Bench work continues at Shattuck.
13.jpg
 
More progress. If you look on the bottom of the third level, you'll notice that you don't see the brackets. Because they're on the top of the bench work, it creates a much cleaner profile on the bottom side.
14.jpg
 
 
All done with the third level. There's a little more that needs to be built, but that won't happen until we get the helix built.
15..jpg
 
Enjoy,
-Dave
Reply 4
DJH4d

We started the roadbed in the same place we started the bench work. Perryton is where the branch line ends.
16.jpg
 
We opted to use foam siding for wide and level areas as it saves on weight. It gets quite stiff once it's glued to the bench work and this is for the town of Perryton. You may also see how the brackets for the bench work is covered.
17.jpg

Starting to work out where everything needs to be. While there is a bridge here on the Shattuck line, it didn't look like this. We came into possession of two BLMA bridges and they're too pretty not to use. This is probably the biggest inaccuracy on the layout.
18.jpg
 
Thanks for looking,
-Dave
Reply 7
DJH4d
Work continued on the branch line to Perryton, TX. Roadbed was cut out and glued together. Once we marked out were it needed to be, risers were installed.
1.jpg
 
 
Using a printout from Anyrail, we marked out where the tracks needed to be.
2.jpg
 
Pretty straight forward. We glued down Midwest N scale cork with white Elmer's glue. Why N scale cork? The real Shattuck branch line didn't get that much ballast. So by using N scale cork, it gives the track a lower profile.
 
3.jpg
 
-Dave
Reply 5
DJH4d
The branch line ends with an interchange with the TXNW RR at Mores, TX. We included this so the local on this line has a reason to take something other than grain cars to Perryton.
 
4.jpg
 
We laid out the rest of the track and installed all the switch machines. One of the reasons we went with foam vs roadbed on risers here is because Perryton is as flat as it gets.
 
5.jpg
 
With all the track laid, that wraps up this part of the branch line. We have to lay out all the track in Shattuck, OK before we can finish the branch line. In the mean time, all the tracks and switch machines were wired up.
6.jpg
 
Enjoy,
-Dave
Reply 7
DJH4d
With things on pause with the branch line, we started to install 2" foam on the part of the third level that will have Shattuck and Woodward, OK.
 
7.jpg
 
With all the foam glued to the bench work, it was sanded to give everything a smooth surface and even up any edges that may have developed between the foam boards. Using another print out from Anyrail, everything was marked out on the foam.
8.jpg
 
The rest of Shattuck, OK. If you look closely, you can see the hole in the back drop where the branch line cuts over to the other side.
 
9.jpg
 
Enjoy,
-Dave
Reply 9
eastwind
How are you throwing your turnouts? Finger flick, switch stand, by machine? Will you have central dispatcher control over any turnouts?

You can call me EW. Here's my blog index

Reply 1
atsfcf7
Absolutely stunning.  
Reply 2
Reply