DJH4d
Hi all, we've been working on this for over a year and now I think we finally have enough to show what we've gotten done. This started back in 2017 as an inside joke, but it took on a life of its own. I bought a lot in Middle Tennessee and built a 100' x 53' pole barn home with a 100' x 40' shop area. These are know as "Barndominiums". The shop area was finished out with climate control and will be used as a train room. We're modeling the ATSF/BNSF Southern Transcon from Willows Springs, IL to Vaughn, NM. We may continue west, but that's not for sure yet. The years modeled are 1990 - 2006.

Anyway, l will be posting a series of updates over the next few weeks to show our progress. We also have a Facebook group for those who use it. Starting with the building, these are from Oct/Nov of 2020.

Thanks for looking,
-Dave
Capture.jpgfsadfasd.jpgggsdff.jpg
Reply 19
scubamanb
Really appreciate the update, I have enjoyed watching the buildout and cannot wait to see the scenery start!
Reply 1
DJH4d
While things continue to move forward, we took some time to do a massive clean up of the layout and the layout room. Once that was done, we had a running session and found a few issues with the DCC system. Here's some of the trains that were ran.
 
 
-Dave
Reply 6
DJH4d
A few days later, we tracked down the issues and fixed them. In order to test these fixes, we had to do a stress test on the layout. With that, we put 17 trains on and let the computer run them for a few hours. It took over an hour for these trains to run over the stretch of single track between Matfield Green and Cassoday. Here's a time laps of all the trains running and waiting for their turn to run. In this video, the computer is running all the trains. We're walking around and checking various DCC equipment to see how it's preforming. So far, everything is working as it should.
 
 
Enjoy,
-Dave
Reply 12
laming
 
Poor saps early on in the video got stuck on the main (lower left) and had to wait for three opposing moves to arrive. Typical Dispatcher! LOL!
 
Then again, perhaps the crew van made an appearance and relieved them to be replaced by a fresh crew... but the time lapse didn't capture that event!
 
Amazing what y'all are accomplishing.
 
Andre
Reply 3
tp
That 'meet in the helix' clip was neat.
Reply 1
chcampi
I know nothing about computer dispatching for model trains. Is it possible to run a train manually among those other seventeen trains? And how does the program respond if something goes wrong like you run a red or fowl a turnout?
Chris
SP freelance in the East Bay.
Reply 2
DJH4d
I know nothing about computer dispatching for model trains. Is it possible to run a train manually among those other seventeen trains? And how does the program respond if something goes wrong like you run a red or fowl a turnout?
Hi Chris, yes, we can run our trains manually with the computer. Just have to watch the signals like you normally would.
 
One of the fail-safes of RR&Co is it will not allow two trains in the same block. On the main, all of the interlocking is its own block. So, yes, we do have blocks that are only 12" long. Using this, the computer can detect a power draw from the track to detect if something is occupying that block. If a train runs a signal and occupies the switch, the computer will see that that block is occupied. It will stop the approaching train because it will not allow another train in that block. However, there are a couple of scenarios where if there's already a train in that block, in that case, they'll run into each other. That's why, for the computer, I have the stop point set for 12" or more from the signal. It gives a little room for error.
 
I hope I fully answered you question.
 
-Dave
Reply 3
laming
 
Thanks for your explanation to Chris.
 
That's fascinating and I can see HUGE potential for a layout to offer its owner a fun way to get a train over the road in the absence of other operators.
 
Your explanation makes this all the more amazing!
 
Andre
Reply 1
Mitchell Schuessler
 
So, yes, we do have blocks that are only 12" long.

Dave, would these be the braking sections before the signals, or just the OS within the interlocking?
 
Do you have to set up blocks within the block for braking?
Reply 1
chcampi
Hi Chris, yes, we can run our trains manually with the computer. Just have to watch the signals like you normally would.
 
One of the fail-safes of RR&Co is it will not allow two trains in the same block. On the main, all of the interlocking is its own block. So, yes, we do have blocks that are only 12" long. Using this, the computer can detect a power draw from the track to detect if something is occupying that block. If a train runs a signal and occupies the switch, the computer will see that that block is occupied. It will stop the approaching train because it will not allow another train in that block. However, there are a couple of scenarios where if there's already a train in that block, in that case, they'll run into each other. That's why, for the computer, I have the stop point set for 12" or more from the signal. It gives a little room for error.
 
I hope I fully answered you question.
 
-Dave

Much appreciated Dave, thank you!
Chris
SP freelance in the East Bay.
Reply 1
DJH4d
Picking up where I left off, ballast in Emporia, KS is almost done. We're using a ballast vacuum to speed up the process. We originally started by using Matt Medium, however, we found that it can leave a white film on everything that's not ballast. Including the ties and rail. Since then, we switched to using water with detergent and diluted Elmer's glue.
 
Screenshot 2025-06-19 231358.jpg
 
Another view of Emporia.
Screenshot 2025-06-19 232058.jpg
 
Up in El Dorado, KS, the local yard and wye is starting to come together.
Screenshot 2025-06-19 232310.jpg
 
After a few more days of work, it was finished up. What can't be seen is the switch machines and wiring that was also installed. At this point, the yard is fully functional.
Screenshot 2025-06-19 232723.jpg
 
-Dave
Reply 10
DJH4d
A little further down, the interchange with the BN is coming together in Augusta, KS. Everything is wired up and ready for service.
Screenshot 2025-06-19 234754.jpg
 
A little wider view showing the interchange and the BN line. The BN will follow the backdrop and end a few feet down where everything straightens out. It will also serve a couple of industries.
Screenshot 2025-06-19 234433.jpg
 
Over in Tejon, ballast was finished up and we started on plaster cloth. We finally figured out how we're going to do the backdrop. Once that's installed, the plaster cloth will be installed on everything behind the tracks.
Screenshot 2025-06-19 233034.jpg
 
Lookin further down, you can see we stopped short of Fort Sumner. Once we get the backdrop and bridge installed, we'll finish the paster cloth through the area.
Screenshot 2025-06-19 233342.jpg
 
Speaking of Fort Sumner, we got the bridge piers in. These are 3D printed.
Screenshot 2025-06-19 233625.jpg
 
We went ahead and removed the temporary bridge since we're going to receive the rest of the bridge shortly. However, until we get the bridge replaced, the layout is down and we can't run any trains.
Screenshot 2025-06-19 233917.jpg
 
-Dave
Reply 9
DJH4d
The top of the helix got a layer of dirt. Eventually, this will get the full scenery treatment.
Screenshot 2025-06-19 235049.jpg
 
Also, things have been moving forward with the facia. We're using Bondo to fill in nail holes and fill seams. Bondo is much harder and will hold up better in areas were people may hit it with stuff.
Screenshot 2025-06-19 235434.jpg
 
That wraps up this update. I do have a few videos from our last running session to post and I should get them posted in the next few days.
 
Enjoy,
-Dave
Reply 15
laming
 
Wow. The vastness blows my pea-sized brain.
 
 
Andre
Reply 2
Paul Mac espeelark
We originally started by using Matt Medium, however, we found that it can leave a white film on everything that's not ballast.
I had that same problem recently and only discovered from others here on the MRH Forum that it is due to the talc that is contained in the matte medium. AFter you dilute the matte medium you have to let it stand for 24-48 hours and then you can pour off the top and leave the talc at the bottom. Once I did that the white efflorescence stopped.
 
That aside, your layout is looking great!

Paul Mac

Modeling the SP in Ohio                                                                                  "Bad is never good until worse happens"
https://model-railroad-hobbyist.com/node/38537
Read my Blog Index here
 
Reply 2
chcampi
Looks amazing Dave. What is this ballast vacuum you spoke of and how is it used?
Chris
SP freelance in the East Bay.
Reply 1
Bshoop
Arizona Rock and Mineral is going to have to open up a special quarry just to supply your layout's requirements!😉
Wow!
Reply 2
scubamanb
To me this is the where things start to get exciting, all the planning and engineering is done, now the transformation to an actual place begins. Thanks for the updates, looking forward to more.
Reply 2
TrainfanTrev
I've been following this for a bit, and I must say, it's starting to look good! I look forward to seeing more progress on the bridge and other parts of the layout. Keep up the good work!
Trev S.
Owner of the Ohio & Pennsylvania: a present-day, proto-freelanced Class II
Modeling the ex-B&O Lake Branch in Northeast Ohio
Reply 2
DJH4d
Looks amazing Dave. What is this ballast vacuum you spoke of and how is it used?
Hi Chris, it's just like its name sounds. Using a one gallon vacuum, we used the nozzle and reclaim cap from Brixhill West to make a vacuum that sucks up excess ballast.
 
Using your preferred method, spread ballast on the track. Using the nozzle, turn on vacuum and suck up excess ballast.
 
PXL_20250630_194010354.jpg
 
Once you're done, do any touch up that may be required and apply glue.
 
Here's what our set up looks like.
PXL_20250630_194031226.jpg
 
Brixhill West uses 3D printing to make the required parts. However, they're located in England and they do not ship to the US. I'm surprised that despite how popular 3D printing is, no one else makes these. I like that the reclaim cap can screw onto any bottle. However, we found that a 20oz bottle works best as anything larger can be collapsed by the air vacuum.
 
PXL_20250630_194119746.jpg
 
The only other parts you need is a cleaning kit that comes with an air flow reduction valve and some tubing.
 
Let me know if you have any other questions,
-Dave
Reply 3
chcampi
Well that is just amazingly cool. I sure could have used that and would have been happy to pay going price for it to.
Chris
SP freelance in the East Bay.
Reply 1
Paul Mac espeelark
Using your preferred method, spread ballast on the track. Using the nozzle, turn on vacuum and suck up excess ballast.
Nozzle 02.jpg
OK, I'll bite. If the ballast isn't yet glued down, how does it NOT suck up all of the loose ballast? What does the underside of that nozzle look like? The opening?
Thanks!

Paul Mac

Modeling the SP in Ohio                                                                                  "Bad is never good until worse happens"
https://model-railroad-hobbyist.com/node/38537
Read my Blog Index here
 
Reply 0
trainzluvr
OK, I'll bite. If the ballast isn't yet glued down, how does it NOT suck up all of the loose ballast? What does the underside of that nozzle look like? The opening?
[CroppedPhoto]
 

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 2
DJH4d
Hi all, here's a video from the last time we ran trains showing the computer running trains at CP Tejon. This was a 20 train stress test on the layout and so far, everything ran as it should.
 
 
Enjoy,
-Dave
Reply 9
chcampi
Fantastic! That rail train, wow!
Chris
SP freelance in the East Bay.
Reply 1
Reply