Cont'd...
Acquiring the O&S would accomplish three things:
1. Get the KC&G to Clarskville on an existing line. This would be a HUGE time saver and potentially save untold
dollars for the KC&G. (Making the idea a selling point to the KC&G.)
2. Be the salvation of the Ozark & Southern line, albeit at the loss of the company itself. (Profitable
divestiture making the idea a selling point for the Ozark & Southern!)
3. Give the Coal Cartel rail service WITHOUT having to kiss the hand of the Iron Mountain. Plus, with granting
exclusivity to the KC&G to handle the loading and interchange of the loads, that would give another incentive
for the KC&G to be receptive to such.
This was an intriguing concept. All three parties were put in contact with each other, and a meeting place set
up. Sitting down together, negotiations were begun by all involved to attempt making this idea a reality.
What the KC&G saw in the above is that IF the O&S could be successfully acquired, it would save a LOT of time
and a lot of money in construction. Plus, the originating dividends in shipping rates was also very attractive.
However, the O&S, thinking they saw a "cash cow" in the abuilding KC&G, was asking an exorbitant price for
"privilege" of purchasing their rickety line! Never mind that the O&S was built to hasty standards back in the
mid-1870s. (Originally to be 3' gauge, no less!) Never mind that their ruling grade neared 3% and 2.0% - 2.5% or
so were plentiful on other grades. Never mind that tight curves abounded on the O&S or that it traversed a
hogback profile! Oh, and the fact that being captive to the Ozarks was literally starving the O&S in what
appeared to be a slow death! No, those negative items (and more) were not factored into the price tag by the
O&S. Instead, the O&S thought they were in the catbird's seat and had the KC&G by the tail!
And perhaps they did have the KC&G by the tail. However, in shrewd dealings and political smoke and mirrors,
the KC&G feigned to the O&S that their dubious line was not worth the "outrageous" price being asked for it.
So, they broke off negotiations, and told the O&S that they would proceed to build their own line through the
Ozarks directly to the town of Clarksville and thus the KC&G would be the ones to secure the coal field
business. In poker terms, the KC&G was trying to "bluff". To aid the KC&G's position, it "leaked" a rumor.
It didn't take a lot of financial aptitude on the part of the O&S minds to realize that if indeed the KC&G
built their own trunk line through the Ozarks, ALL the O&S would have left would be the meager online traffic
and GONE would be the bridge freight from Kansas City via the O&S Springfield connection south to the Iron
Mountain & Southern. To add urgency to this concern, the KC&G was rumored to be purchasing land out of
Springfield. One can imagine the tone within their board of directors meeting when the O&S would be put in the
very undesirable position of having an adversarial relation with the competing KC&G. The potential of all of
this caused the powers that be at the O&S to come to the sickening realization that if indeed the KC&G built
their own line, likely the O&S would lose a tremendous amount of potential traffic, most all of its bridge
traffic to/from the Arkansas River Valley, and would very likely not survive the blow.
The O&S became very negotiable.
The two sides sat back down at the negotiation table. In short order the KC&G agreed to purchase the O&S at a
more realistic price. Win-win: The KC&G had an existing route through the Ozarks and the O&S owners made a
reasonable profit. So it was in the early-1890s that the Ozark & Southern passed into history, being absorbed
by the KC&G. Southward HO! Of course, now the KC&G had to bridge the Arkansas River, no small undertaking or
small expense in itself, but it was going to have to bridge the Arkansas River whether it was at Clarksville or
Russellville, Arkansas.
Thus, we find that the KC&G had to settle for a more rugged crossing of the interior Ozarks within the glorious
state of Arkansas via the purchase of the Ozark & Southern.
However, the seemingly shrewd move of obtaining the O&S was tempered significantly on account of the fact that
the former Ozark & Southern's crossing of the Ozarks was originally built to more, shall we say, "hasty"
standards. In fact, as mentioned, the original standards for the O&S were 3' NARROW GAUGE, thus the tighter
curves, narrower cuts, and steeper grades. Fortunately, before Ozark & Southern track was being laid on the
roadbed, cooler heads prevailed. Seeing as the Little Rock & Fort Smith (to become the Iron Mountain &
Southern) was re-gauging their 5' gauge to standard gauge, the financiers of the O&S wisely decided they had
better go with standard gauge. Thus the graders went back to work and widened the cuts and such as they could,
but they were still stuck with essentially 3' gauge curvature and gradients(3).
And so it was, with the O&S in their hip pocket now, with legendary Missouri Mule determination, the KC&G
pressed on. By retaining the lighter rail, tighter curves, steeper and more plentiful grades, shorter pass
tracks, et al, of the original O&S... their determination to get through the Ozarks was realized and realized
far quicker, and with significantly less expenditure, than would have been the case had they built an entirely
new line.
Unfortunately for ALL the railroads, the economic crash of 1893 slowed, even stopped, MUCH railroad
construction nation wide. This also included the KC&G as it didn't make NEAR the progress that had been made
prior to the crash of '93.
BUT, and this is important: Via the O&S purchase, the KC&G NOW had a way through the railroad-inhospitable
Ozarks. What remained facing the KC&G was to persevere to build, acquire, whatever it would take, to get down
to New Orleans.
Persevere they did: New Orleans was finally reached in 1895. As well, the needed short branches to the coal
fields around Clarskville were plotted and laid, and the line to Ft. Smith and Hot Springs, Arkansas, were
completed. In addition, the KC&G worked out a very good interchange rate with the "Choctaw Route" (soon to
become the Rock Island) that would be a mutually profitable traffic arrangement for freight to/from Little
Rock. Things were looking good.
In the meantime, their arch rival, the Kansas City, Pittsburg & Gulf changed their objective, and instead of
heading directly for New Orleans, headed due south to create the new port town of Port Arthur, Texas. This they
accomplished in September of 1897.
So both "Kansas City" lines reached their goals: The KC&G had reached New Orleans, and the KCP&G redirected and
ended up at Port Arthur, Texas.
The first years were formative, but the KC&G soon began to carve out a modest living among the flatlands of
Missouri, the mountains of Arkansas, and the bayou country of Louisiana. The coal traffic out of the coal
fields of Arkansas, both north and south of the Arkansas River, were helping considerably.
It didn't take long for the Ozark & Southern portion of the KC&G (named the "Ozark Subdivision" by the KC&G) to
prove to be the most financially challenging section of the entire KC&G. By looking strictly at what was now
the "Ozark Subdivision" of the KC&G, it was hard for them to convince themselves that they were actually a
"flatland" railroad. But in all practicality, the KC&G was indeed a flatland road. Fortunately the portion of
the KC&G through the Arkansas Ozarks, along with a less rugged section located further south in Arkansas in the
Ouachita Mountains, would be the only significant vertical "hiccups" in the KC&G's southward progress.
As the 19th century turned into the 20th century, that siren song of "expansion fever", also hit the KC&G. In
fact, "expansion fever" was still running full swing throughout the region. Soon, the KC&G was building toward
another target: Dallas, Texas. This was accomplished, and though they weren't anywhere near being one of the
first of the railroads built into that growing metropolis, the new Dallas line began to add revenue to the
coffers of the KC&G.
Another important decision to be made during the late 1900's, was a decision as to where to locate the new
major locomotive and car shops. This would accomplish two things: First, the small facility at Kansas City's
Riverfront Yard was being out-grown and taxed to the maximum. Second, the KC&G management felt the new Main
Shops needed a more a central location. So it was that the growing oil-rich area of Magnolia, Arkansas was
selected. By the end of the 1900's, the new Magnolia Shops were in full operation. After this period of
expansion and growth, the KC&G settled in, and began to fulfill its role in the world of Class 1 railroading.
Though the line couldn't really be considered to be making a "killing", it was at least was deriving a very
profitable living during the "Golden Years" of railroading.
THE GREAT DEPRESSION AND WORLD WAR 2...
Let's skip ahead now, and move onward in time to the next item that would begin to change the direction of the
plucky little "Mainline to the Gulf": The Great Depression and World War 2.
As with almost all sectors of the economy, the Great Depression was not kind to the KC&G. Along with many other
railroads, the KC&G was looking at many different ways to operate more efficiently and therefore reduce costs.
One of the tentative moves in this area was to sample the "diesel waters" as some of the other regional roads
were thinking of doing. In the case of the KC&G, they turned to one of their locomotive builders: Alco. In
1939, emulating another Kansas City railroad that the KC&G worked hand-in-hand with (the Kansas City Terminal),
the KC&G ordered one of ALCo's "HH660" model diesel switchers. Unlike the KCT, the KC&G opted to order the more
cost-effective HH660 instead of the more expensive HH900 as did the KCT. Also, the KC&G maintained their
frugality by ordering just one HH660. With all the talk of war in Europe looming, the KC&G simply stood pat
with their one and only diesel switcher: ALCo HH660, numbered "D-10". (What did the "D" stand for? Why, the "D"
stood for "Diesel"!)
Being favorably impressed with Alco's HH660, the KC&G turned to the other of their favored steam locomotive
builders: Baldwin. From Baldwin the KC&G purchased one VO660, which was delivered in April of 1941. This engine
was numbered "D-11".
Then the war came. Almost a one-two knockout punch for the KC&G's aging steamers, the lack of funds during the
depression along with the surge of traffic during WW2... essentially ran the wheels off the KC&G's aging fleet
of Consolidateds and Mikes.
As the war traffic grew, the need for more new power was painfully obvious. The valiant little D-10 and D-11
just weren't anywhere near enough to help the situation. The only saving grace at this point was the surplus
cash that was accumulating in the bank due to the burgeoning surge in war-time business. So, with funds in the
bank, and a worn stable of antiquated steamers, the decision was made to commence dieselization as soon as
practical, beginning with the switch engines. IF the new diesels proved to be as efficient in use as was being
touted then they would spread the dieselization toward other types of engines. If all went well, they hoped to
accomplish conversion to diesels in rather straightforward fashion spread over the course of a few short years.
Of course, the War Production Board and circumstances of the time would have much more to say about that!
Eventually, though, after more years than first hoped, the road to dieselization was finally completed.
(NOTE: For a more detailed look at the KC&G's initial dieselization, watch for the publication of the chapter
entitled "The Dawning Of A New Age".)
THE POSTWAR YEARS AND BANKRUPTCY...
As with many roads during the years following the war, the KC&G began to experience a gradual tapering off of
traffic throughout the 50's. It called for a time of frugal capital management, and a "common sense" approach
to managing the road through some lean years.
The KC&G received neither.
To Be Continued...