railandsail

Center Peninsula Track Planning, …..Container Terminal & Port Facility

I've been putting this off too long. This is the original Tupper Lake/Faust Junction peninsula track plan I was using as inspiration.

 

That plan had a passenger train station in the peninsula area. My new plan is going to be much more 'industrialized' , and that station location is now becoming a container terminal zone.
 

By happenstance I ran across a carfloat model at our local flea market. What if I were to put that out on the end of my peninsula across from my other waterfront scene? ...another tug boat barge item....a port facility .


So this discussion of a track plan for the peninsula is going to consider these 2 elements as sub-subjects,...container terminal & port facility.
 

What I am going to need help with is how to make these two sub-scenes operational...how to move/switch cars around in them?

NOTE: Decided to take Neil's advice and separate the 2 discussions.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Were?

Were to find that Goldstein website/...thats a pretty broad heading.

Reply 0
railandsail

sorry Neal

These 2 areas, the container terminal and the port facility are right next to one another in that relatively narrow peninsula, and modifying one of those areas might well directly affect the size and configuration of the other. That's why I included them in the same discussion thread. Plus most of the photos end up including both areas, which makes it difficult to ignore one and only talk about the other.

I started out with the idea that I would resist talking about the port side until I had reached some conclusions about the container side. There were already some folks eager to move on with the other side, and to tell the truth I'm pretty happy that I got talked into the 2 track solution.

I am MUCH more undecided how to handle that other port facility side, both from a decision as to 1) what to include, and 2) how to make it somewhat operational.

I'm still open to more container input.

 

 

Reply 0
ctxmf74

I'm still open to more container input.

 Check out the Port of Palm Beach on the east coast of Florida, it's a small port similar to your layout space. It handles containers, bulk, and general cargo with a simple track plan. The "Goldstein" website is the New York Harbor terminal website previously mentioned....DaveB

Reply 0
railandsail

sorry again Neal,

....another track plan alteration for the container area.

Quote:

 ...from another forum

Does using a standard turnout instead of the slip alter it that much? With the original arrangment of 3 tracks, the turnout between the tail track and the center intermodal track had its points above that little tail on the far left, and it looked like if you put the bumper at the very edge of the shelf, that steam loco would JUST squaeak in there. Now with the slip removed and a single turnout there, plus a second single turnout, the points of the second turnout end up well below the little tail, and no room for the steam loco (never mind that that loco would be an anachronism pulling modern contain cars). 

 Of course, operation in the intermodal yard could be that an older loco, like a 38-2 or 40-2, handles moving the cars around, and the double headed road locos don;t actually run all the way down there to even need to run around.

                                   --Randy

 

I replied:
You are correct there Randy, this change to 2 container tracks certainly limited the use of those tail tracks. When I set back and think about it my first plan with the slip-switch was brought about when I discovered this situation.

But oh well, I think the 2 track plan has gained the upper hand. I will then have a dedicated lane for the truck/trailers, and perhaps a little less cluttered appearance. I will have only one long tail track, but at least I will have one.

Maybe in the end I will reconsider and go back to 3 tracks,...at least I will have that option due to the manner I have changed from 3 to 2 tracks.



Then I thought about it some more:
I just looked at this situation AGAIN, and perhaps I should return to the use of that dbl-slip switch usage, and the 2 tail tracks,...just leave out the 3rd rail under the container crane for now (include the turnout but don't put the the 3 track in right now...or ever)??

 

 

 

Reply 0
railandsail

Dividing Out Subject Matter

Quote:

Brian,

You're posting images of too many areas. We're all trying to help you with one specific area and then you show us something else. Don't want to sound crass, but let us help you with one area and maybe start a different thread for the other area. 

Still trying to see what's going on with the intermodal and port area... 

Neal M

I'm taking you advice Neal, and separating out the 'port facility' discussions to their own subject thread,...preparing that discussion now.

UPDATE: Making a link to that new discussion thread,...

Industrial & Port Facilities on my Peninsula
https://forum.mrhmag.com/post/industrial-port-facilities-on-my-peninsula-12214347

 

Reply 0
railandsail

addressing Randy's observation

Quote:

Does using a standard turnout instead of the slip alter it that much?


Now with the slip removed and a single turnout there, plus a second single turnout, the points of the second turnout end up well below the little tail, and no room for the steam loco.
Randy

I went back and looked at this 'tail track(s)' and slip switch configuration again. Here were 2 configurations I had presented,..

A) 2 single switches, 1 tail track

 

B) 1 dbl-slip + 1 single switch, 2 tail tracks

 

Its rather strange, but as I played around with these 2 configurations it appears that the one with the dbl-slip switch gave me:

1) longer tail tracks (particularly that one tail directly connected to the slip switch),

2) and two tail tracks rather than just one.

 

So since I have the dbl-slips available, and it is within easy hands reach, I think I will go this route.

 

Here is a cleaned up view with 3 tails available for operations.

 

 

BTW, that double 'dockside crane tracks' (on the right hand side) are offset on purpose. I hope to put a gentle curve in them after they clear the terminal bldg so they come closer to the barge dock's edge.

 

 

Reply 0
railandsail

New 'tail tracks' configuration

Today I was looking at some new possibilities for my carfloat location. While doing this I took a new look at those tracks and switches I have been considering for the trailing ends of my container yard.

I introduced a 3-way turnout to gather the 3 track ends together. The 2 container tracks now deposit the long locos and containers onto 1 long 'tail track' rather than 2. I still retain that shorter tail track off the end of the run-around track to act as a layover for the switchers ready to work the container cars. (and I don't intend to use that little steamer for this modern container operation,...just didn't have a small diesel handy)
 



 


 

Reply 0
dark2star

Purpose of the escape tracks

Hi,

firstly, a Happy New Year.

Even after a while, I still don't understand the purpose of your escape tracks. Don't get me wrong, I understand escape tracks as such. But in your case, several of the container well cars keep showing up on those tracks. Which escapes my understanding.

If you intend to use the escape track to get a loco off a train, it does not need to be this long.

If you intend to shunt well cars, it will always be too short.

Also, looking at your location, I think it would be a perfect excuse to leave the nice locos sitting there and looking good at the best spot on your layout (rather than having an empty piece of track there).

This is the first place a visitor to your layout is going to see. Straight across from the door on the tip of the peninsula. This is the perfect spot for a nice loco or two waiting "in the sunlight"... So why would you want your locos to escape?

You had such a nice shot of a large, beautiful steamers sitting right there in the perfect spot. Go back one page. Which looks much better than an empty piece of track. Or an empty well car. Which is why the purpose of the escape track is escaping me...

So, I have said enough about my view of the situation

Have fun!

Reply 0
David Husman dave1905

Switch from the other end

Put a crossover at the base of the peninsula from the right most container track over to the lead to the float dock,  use the float dock lead as the tail track.  Make all the container tracks stub ended track with NO switches whatsoever. 

Inbound train noses into the right most container track, cuts off power, goes into the float lead.  Put the switcher on the far end of the inbound container train and shove each track full.  

To depart a train, put the engines on one container track and double/triple the train out.

Only uses two switches, allows the use of longer engines, maximizes the capacity of the container tracks.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
railandsail

replies

Quote:

Dave posted:
Put a crossover at the base of the peninsula from the right most container track over to the lead to the float dock,  use the float dock lead as the tail track.

Inbound train noses into the right most container track, cuts off power, goes into the float lead

The reason I didn't send any of the mainline locos (steam or diesel) over to that side of the peninsula is that I didn't have any short, good way to get them back to the turntable/roundhouse, or freight yard, without making them wait for operations, or sending them all way back around the layout. I didn't think that would be realistic at all. 

I figured that that tail track could collect a long steamer, or even perhaps a doubled headed diesel set and send them back 'home' while all the unloading of containers, or loading of the carfloat proceeded without their interference?

 

Quote:

Dark2star:
Also, looking at your location, I think it would be a perfect excuse to leave the nice locos sitting there and looking good at the best spot on your layout (rather than having an empty piece of track there).

You had such a nice shot of a large, beautiful steamers sitting right there in the perfect spot. Go back one page. Which looks much better than an empty piece of track. Or an empty well car. Which is why the purpose of the escape track is escaping me...

I think I explained my thinking of the tail track above,..for the locos. The reason I show a couple of well cars just sitting there is to emphasize that this tail track can also be used to move empty container cars out of the front of the line and back over to the yard area,...so the switcher can push more cars in for unloading. My use of 2 cars was to say I can possible move 2 cars at a time, rather then just one.

As to 'displaying' the locos, i have a nice big turntable right next the deck's edge at the very end of the aisle,...with lots of 'outdoor' tracks for those big steamers. Should be a good show, rather than hiding them down in staging. (I'm also planning on having primarily diesels climb the helix up from staging, that may, or may not, give their trains up to steamers.

That Santa Fe engine facility up on the top deck will have considerable 'outdoor stowage' for some pretty snappy diesel engines,...and its close to the edge for viewing as well.

Reply 0
railandsail

  Potential Operations on the

Potential Operations on the Peninsula

Here is how I would imagine some of the operations would happen on that peninsula.

The mainline train would enter on either of those 2 tracks that meet at the double slip. The mainline loco might uncouple right there, and proceed to get back over to the roundhouse area or the freight yard by way of that escape route provided by the tail track at the end of the container yard and the runaround track.


Or it might go ahead and pull the train thru the container yard, but uncouple and leave non-container car(s) there at the double crossover. It still can use the tail track to escape and go home.


The switcher the comes in to pull groups of container cars into the 2 tracks for unloading. As they are unloaded, that switcher (or a second one) can pull singles or pairs of those unloaded container cars over to a waiting area (the freight yard perhaps). Then come back to repeat the operation over and over, ...pulling new container cars into unloading, then over to the freight yard waiting area.


Another switcher working the right side of the peninsula would grab off non-container cars up at the double slip and move them onto one of 3 waiting tracks for selection to be delivered to the 1) big dockside crane out at the end of the peninsula, 2) the carfloat, 3) several other warehouses in that port area, 4) allied rail rebuilders, 5) another industry possibly located on that thin right hand shelf, or 6) maybe even the brick factory or waterfront scene down in the far corner on that right hand deck.


(that little switcher working that side of the peninsula might be given its own little 'home' in one of the arches of the via-duct)

 

That little switcher might be a steam type like the infamous 'docksiders', or it might be a swarm of trackmobile types. Those multiple little switchers might lie in wait on that one siding next to allied rail rebuilders.

 

One of the 'port warehouses' I am considering is utilizing either the Walthers Waterstreet Freight Terminal kit, or the P2K 'Moore & Co' structure located approx here,..





Reply 0
dark2star

The A-Ha Moment

Hi,

thanks for your explanation.

The idea to put the switchers' shed inside one of the viaducts' arches is absolutely fantastic, I really like that.

As for your train operations, this makes it much clearer. I still think that it is not useful to be able to push container cars into the loco escape track. And I still think this would be the best "sunny" spot to display your most beautiful locomotives...

Have fun!

Reply 0
railandsail

Doing the last few days I

Doing the last few days I rebuilt the substructures for my stone arch viaduct/bridge that appears in the background(s) of where my central peninsula meets the layout. I had wanted to finalize these structure sizes and exact placement so I could move on to finalizing the track plan(s) on the peninsula itself.

The structure(s) first out front of the viaduct on that one side were the roundhouse and the turntable. I had now finished building my new turntable pit, and mounting the footprint of my roundhouse onto its new metal base piece. There were a couple of obstacles I need to consider in exact location of that big roundhouse,...a) how close that rear corner might be fit to the arch bridge, andb) clearance for a piece of all-thread rod that might be eventually be erected in a vertical manner to support the overhead steel beam that stretches across the entire room to support the upper logging area. That all-thread rod may never be used, but I wanted to make sure to not cover up my pre-drilled hole just in case.
 

So here is that final location of the turntable and roundhouse, and subsequently the tracks involved.
DSCF5418.JPG 

One particular trouble spot presented me with lots of problems,...the connection of the container yard's incoming track from that slip switch, with the yard track itself, and the two curved tracks exiting the yard to go to the turntable. It involves a dbl-curved turnout, a long Y turnout, and single turnout. These all have to be smoothly connected together them selves, while at the same time providing the proper angles to the group's 4 'arms'. As I had mocked it up originally, it was not going to work.

(these next 2 photos looked promising.....
DSCF4983.JPG 

DSCF5408.JPG 
.....but didn't pan out in reality.)

I eventually got it worked out by overlapping ever so slightly the dbl curve and the Y turnouts
DSCF5421.JPG 
 

One of the major results sought was how to keep that upper 24-25” r left curving track from reaching to far up into the turntable zone, and still providing a fair lead into the turntable itself. I'm still debating the use of a std small radius left hand turnout here vs a short Y turnout.
DSCF5425.JPG 

There is a lot to be said for working these track plans at FULL SCALE. I doubt I would have found this problem with smaller scale drawings.

Reply 0
railandsail

Barrier Plate

As I was working on this left hand side of the center peninsula container yard area, a new thought occurred to me. The track close to the edge would likely need some sort of protection from someone in the aisle knocking trains off that edge. Why not have a barrier that would incorporate a 'backdrop image?


So here is what I've come up with so far,...just a quick mock-up. Mount a vertical barrier along that edge, and on its inner face a picture on stacked containers, and ship loading cranes off in the background.
DSCF5414.JPG 

On the opposite side of that barrier plate, perhaps just photos of stacked containers.
DSCF5415.JPG 
 

Having that barrier plate there would permit me to move that track a bit closer to the edge, thus providing a little extra real estate on the central peninsula. So now it is 1+3/4” from the edge.
DSCF5419.JPG 

Reply 0
Bob_A

Port of Montreal

Brian

This is how I added a view block between the drill track and my operator position on the group's display layout.  The drill track module was only about 10 inches wide so I added a piece of MDF that would clamp to the inside of the module with a harbour scene photo on the viewer side.

HPIM5899.JPG 

HPIM4209.JPG 

HPIM4205.JPG 

Bob Ascah

Reply 0
railandsail

Thanks Bob.I think I will

Thanks Bob.

I think I will use both sides of my view block as a scene, And I think I will use either thin masonite or my pvc sheet material to mount the photo/drawings on,...and its liable to be about 4 feet long.

I thought I was making extra progress on gaining a bit more available width across my peninsula by moving the run-around track closer to its edge,...but as I proceed to more permanent planning of my track layout, I've found my mock-up dimensions to be a bit optimistic,....had to move a few things further over the edge on the other side (about 1" extra needed now).

 

 

Reply 0
railandsail

Wishful Thinking

I've spent a good couple of hours looking back thru this marvelous creation of the Magoun Pier scene over on this other forum

http://www.railroad-line.com/discussion/topic.asp?TOPIC_ID=40790&whichpage=49

 

 

 

It makes me wish I had found this discussion, and the many photos while I was still in the preliminary stages of my planning a track plan for my peninsula. I might have tried to devote the entire end of my peninsula to a wharf scene like this.

But when I went out to my layout and took another look, I realized I still did not have enough width on the end of my peninsula to get that scene in,..at least not so with the vessels there...oh well, wishful thinking.

Reply 0
Lancaster Central RR

You could reduce the elements in the the scene.

A backdrop could split the scene in half and still nicely represent a waterfront. The interesting part of the design to me was that he designed it as a mirror image of each half. 
 

The scene is a take on the prototype example of double track sidings on each wharf. Going back to prototype the sidings would be normally fan out from the the same lead and not the way he set the back end up. You could have your lead track come down one side of the peninsula and then split into 4 tracks and turn towards the end. Making the scene at an angle would possibly allow you  to fit more of it into your space.

Lancaster Central Railroad &

Philadelphia & Baltimore Central RR &

Lancaster, Oxford & Southern Transportation Co. 

Shawn H. , modeling 1980 in Lancaster county, PA - alternative history of local  railroads. 

Reply 0
railandsail

@Shawn H

Could you provide with a sketch (however rough) of what you have in mind? I can't quite understand your description?

 

 

Reply 0
railandsail

Rotating Freight Cars on and off the Layout

The thought occurred to me that I might utilize the car barge as a entry-exit point for freight cars on-and-off the layout. In other words I could load the barge up with various cars and then send them off to a foreign port (off layout storage), then have the barge re-appear with a different load, and proceed to unload them onto the layout.

 

 

Reply 0
railandsail

Changes are coming

I've been in the track laying mode, and quite suddenly decided to go ahead with some of the trackwork in my peninsula area. I thought I had it pretty much worked up with my full size template planning, and an evolution of changes over the past year. I even glued down some of my more complicated turnout joining configurations at the base of the peninsula,...particularly here..

age(153).png 

I began to re-look at this situation where I was providing an 'escape segment of track' (arrow above) for steam engines to get back to the 24" radius track feeding the turntable. That escape track was inhibiting the container area/tracks in a major fashion. Do I really need it?

I am thinking of alternatives, but it will mean I need to tear out this considerable work/junction/combination of turnouts I have been taking for granted almost from the beginning of my layout design process.  Oh well, so much for the best laid plans

(to be continued later today, after a little more thought as to how this is going to effect a number of more changes to the container trackage)

 

 

 



 

Reply 0
pldvdk

Worth the Time

Brian,

It's been my experience that when you feel something isn't quite right, that's because something isn't quite right!  I've faced that many times with my own track plan evolution.  It's worth taking your time, making a tweak here and there until it's got the right feel for you.  If you don't, it just keeps bugging you and lessens your enjoyment of the layout later on.

As I've watched your layout evolve, I do have to say I'm quite impressed!   You have a distinct ability to milk a space for all it's worth, and get the most operation out of the room you have to work with.  So great job!

Your layout is yet one more here on MRH that I'd love to run ops on.  Looks like it would be loads of fun!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
railandsail

New Track Plan for Container Tracks

Back on page 1 of this discussion I describe my efforts to provide run-around tracks and tailing tracks for locos that have brought trains into the container tracks. I was trying to provide 'escapes' for both diesel and steam engines that might be pulling those container trains,...and in particular long steam engines which I am very partial to (and yes I realize that steam engines really 'disappeared' prior to containerized freight, but this is MY railroad).

I had wanted (still do) to get the steam engines routed back to steam area (roundtable/roundhouse) and the diesels routed back to the freight car yard. Two loops of tracks, 22”radius and 24” radius, was the best (broadest) I could manage, and the broader 24” one would be used for the steam engines. That created that need for the more complicated turnout combo and the that short crossover track.

I have now decided that ANY steam engine bringing a freight train (particularly container train) into the peninsula area must choose that left (their right) most track, uncouple and go just beyond that turnout leading to the 'turntable track'. They can then reverse direction and back into that track that feeds the turntable and/or steam service area.

Switcher engine(s) will then position freight cars where appropriate.

the Original plan
84042-1.jpeg 

Updated plan
84130-2.jpeg 


Here you can see the simplified turnout configuration (single one verses 3),....and difficult to see, a smoother transitioning 24 radius track to the turntable.

84218-3.jpeg 

84248-4.jpeg 

At the other end there is still a tailing track for the diesels (even a pair of them)
84412-5.jpeg 

84449-6.jpeg 

Both these engines and the empty container cars can make their way back over to the freight yard via that track along the edge of the deck and the 22” loop at its upper end.

Reply 0
railandsail

One might notice another

One might notice another couple of changes. I have added the third track back into those passing under the container cranes,...probably best expressed by my previous posting,...

I was unsure of exactly how I wanted to space those 2 tracks down in this yard? Then I got to thinking, what if I went ahead and installed 3 tracks, with the option to chose later which combination of 2 tracks I might make use of in the future.? Wait a minute, aren't these tracks under the cranes paved flush with concrete so the tires of the cranes can roll over them? ...Of course, so why not lay down that 3rd container track under the cranes, such that the option exist to use any 2 of the 3 tracks. This might exist in real life as well? I'm pretty sure I want to go forward with this option of 3 container tracks that are buried flush with the concrete paving that the cranes and trucks can drive all around on.

 

I've made the container yard a bit longer (span distance covered by the cranes) as a result of the less turnouts at the entrance, and shortening of the tailing track.

 

 

Reply 0
barr_ceo

yes I realize that steam

Quote:

yes I realize that steam engines really 'disappeared' prior to containerized freight, but this is MY railroad).

 

I've posted this before, but....

... so run what ya want!

 

 

Read my Journal / Blog...

!BARR_LO.GIF Freelanced N scale Class I   Digitrax & JMRI

 NRail  T-Trak Standards  T-Trak Wiki    My T-Trak Wiki Pages

Reply 0
Reply