railandsail

Center Peninsula Track Planning, …..Container Terminal & Port Facility

I've been putting this off too long. This is the original Tupper Lake/Faust Junction peninsula track plan I was using as inspiration.

 

That plan had a passenger train station in the peninsula area. My new plan is going to be much more 'industrialized' , and that station location is now becoming a container terminal zone.
 

By happenstance I ran across a carfloat model at our local flea market. What if I were to put that out on the end of my peninsula across from my other waterfront scene? ...another tug boat barge item....a port facility .


So this discussion of a track plan for the peninsula is going to consider these 2 elements as sub-subjects,...container terminal & port facility.
 

What I am going to need help with is how to make these two sub-scenes operational...how to move/switch cars around in them?

NOTE: Decided to take Neil's advice and separate the 2 discussions.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Steam Powered Container Train

I well remember seeing that video, and its embedded in my brain

Reply 0
railandsail

Thanks Paul

Quote:

As I've watched your layout evolve, I do have to say I'm quite impressed!   You have a distinct ability to milk a space for all it's worth, and get the most operation out of the room you have to work with.  So great job!

Your layout is yet one more here on MRH that I'd love to run ops on.  Looks like it would be loads of fun!

Paul Krentz

Thanks for your encouragement Paul. I have been accused of trying to put 10 lbs into a 5 lb bag,...probably very true. It's a challenge. I just wanted as much industry as possible on my railroad.

I see where you have lots of experience with building layouts, so I look forward to reading some of your blogs. Perhaps if you are in the northern Florida region next year, we could do some sort of opts,...never done one.

Cheers,

 

 

Reply 0
railandsail

Accepting New Track Plan

I have been thinking about this new track plan for several days, and I have come to accepting it. So its time to start gluing down the tracks today. I've got to double check my dimensions of the track centerlines across the peninsula deck, as some are very critical to get just enough spacing between the tracks and around the container cranes. My cataract surgery several years ago left me with 2 different views that I believe effects my reading the ruler scale correctly (or my age,..whatever?) . I seem to make mistakes sometimes, and that calls for double checking.

The slightly longer container tracks will certainly allow for some 5-car connected consist. I've even come up with an escape route for them (it). After these 5-car units are unloaded they could be backed into the track section connecting the double slip with the helix loop. From there a container train headed back to the west coast could be backed up and hitched to them,...OR another switcher engine might hook up and take them over to the freight yard area to be staged for future pick up.

I am thinking i would like to run unloaded (or partially loaded) container trains back to my west coast container port (on my upper deck), to be loaded once again for shipment to the east coast yard on the lower deck.

PS: I wonder what the prototypical trains do in real life,...do they deliver many empty containers back to ships, back to Asia?? Its my understanding that Asia is running short of the tremendous number of containers needed to ship their products to the USA?

 

 

 

Reply 0
pldvdk

Tail Track

Brian,

I like the new arrangement of tracks for the container train.  It looks more streamlined and efficient.

I may have missed it in your earlier discussion, but that small tail track with the switcher on it doesn't really look like it's needed.  Looking down the track it's connected to, it doesn't seem like there's anything there you would need the tail track for.  But maybe I'm missing something.

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
pldvdk

Forgot

Brian,

In my last post I forgot to say "Thanks" for the invite to run ops at your place.  If I'm ever in the north Florida area, I'll definitely try to give you a call.  Then you can show me your empire in person, which is always better than just looking at pictures!

By chance, if you come north to the Minneapolis area, you're welcome to visit the Pokey 3.0 as well.

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
railandsail

Looking down the track it's

Quote:

Looking down the track it's connected to, it doesn't seem like there's anything there you would need the tail track for.  But maybe I'm missing something.

Paul Krentz

I originally stuck that siding/tail track in there to have a little stowage track for a switcher engine that might be working the container area. I imagine it could act in that manner as a stowage siding to let the bigger diesels get by on their trip back to the freight yard. Then the switcher could go into action to push a consist of container cars back out after they are unloaded,...and subsequently to pull a new group into the unloading area.

Hope that makes some sense,..I'm losing track of my potential ops

Reply 0
railandsail

Mixture of Carfloat, Container yard, and Pier Building

I've had some folks suggest that this mixture of scenes doesn't make sense?  Well i just found another modeler who thought it would work,...
 

Quote:

Picture taken at the Springfield MA show in 2008. Sorry, I didn't record any details of whose layout this was.

John P
 

https://modelrailroadforums.com/forum/index.php?threads/baltimore-wharf-area-municipal-piers-docksider-locos.31939/#post-470143

Reply 0
railandsail

Another Baltimore Picture (with a docksider loco)

Reply 0
dark2star

Depends

Hi,

so, there is some overlap between the three different methods. I'd think the mix of the different modes varies a lot and getting that right may make the difference between "fantasy" and "might even be realistic"...

The answer to that question depends a lot on the era - containers as we know them today have become popular over the last 50~70 years and have mostly replaced traditional boxed freight in boxcars... Gradually.

Mixed operations are still done today, e.g. the barges to Alaska carry both railcars and containers. What comes in containers is put "on top" - after all there is no need in transporting generic container cars. What is difficult to trans-load is shipped in the rail car - which is easier than a day-long trans-loading operation.

Warehouses are immensely popular even today, but they are used differently than what used to be: today they are either shipping centers (e.g. what Amazon ships from) or distribution centers (where UPS sorts their packages according to destination). Assuming your dock serves multiple over-water destinations, the warehouse would handle re-sorting freight that comes from one ship and needs to be re-distributed for multiple other ships or rail. Stick a "Model-harbor packet service" sign on the warehouse and run some cars from the carfloat to the warehouse. Combine your car-float with some containers "on top" and it seems realistic for me. Even today.

It is not 1/3rd containers, 1/3rd carfloating, 1/3rd warehouse. But the operation itself sure seems possible.

In "my world" most long-distance freight should go on rail or ship. Some technology that is considered "obsolete" would be tremendously helpful in reaching that goal. I even think that smaller, more localized rail operations would actually make more money go around more sustainably compared to today's few giantuous operations...

Think about what traffic flows there are "in your world" - if it makes sense and you can explain it without too many words it is probably correct

Have fun and stay healthy

Reply 0
railandsail

New Age Municipal Terminal Buildings

Quote:

Warehouses are immensely popular even today, but they are used differently than what used to be: today they are either shipping centers (e.g. what Amazon ships from) or distribution centers (where UPS sorts their packages according to destination). Assuming your dock serves multiple over-water destinations, the warehouse would handle re-sorting freight that comes from one ship and needs to be re-distributed for multiple other ships or rail. Stick a "Model-harbor packet service" sign on the warehouse and run some cars from the carfloat to the warehouse. Combine your car-float with some containers "on top" and it seems realistic for me. Even today.

Dark2star

Recently I've been thinking along these same lines,...my municipal terminal building has evolved into more of a centralized warehouse/redistribution center. It can load some small ships that might be delivering to Norfolk or Bermuda . Or it can operate in conjunction with the carfloat/barges to deliver to a variety of product to small port cities along both sides of the Chesapeake Bay simultaneously . It can also possibly have some containers loaded on the top by that adjacent dockside crane out back of the terminal building ????

 

shades of this image
x%201930.jpg 

 

 

Reply 0
Russ Bellinis

Norfolk not likely, Bermuda maybe.

Small ships not likely to be making delivery's to Norfolk or anywhere stateside.  I don't think there are any American shipping companies operating small ships other than to Alaska or island service like Santa Catalina, Ca.  Santa Catalina is strictly barge service.  The problem is that U.S. Maritime Law is strict that no cargo can be shipped from one U.S. port to another U. S. port unless it is carried on what is defined as "American bottoms."  An "American  bottom" is a ship whose hull is built in an American shipyard.  Foreign ships can call at American ports to load cargo destined for foreign ports or they can offload cargo originating from a foreign port.  Foreign ships are not allowed to load cargo in a U.S. port to go to another U.S. port.

When I worked for Sea Land Service our West Coast ships called on L.A./Long Beach Harbor (terminal was in Long Beach), Oakland, Seattle, & Honolulu.  We never had cargo going from Long Beach to Oakland or Seattle to my knowledge unless it was empty containers or chassis being relocated to another port.  We did not have any freight going to the Hawaiian Islands because Matson Lines is owned by one of the "big 4" in the islands and has a monopoly on freight between the mainland and the islands.  Over the years various companies have tried to break into the West Coast/Hawaiian trade but none have been successful.  Cargo is not carried between West Coast ports on ship except to Alaska because rail or truck is cheaper and more efficient.  To my knowledge all cargo bound for Alaska is either shipped by truck on the Alaskan Highway, or shipped from Seattle to Alaska by ship or barge.  I think there is still some barge traffic between West coast ports, but not ship traffic to my knowledge.

Sea Land Ships did not go from West Coast ports to gulf coast or Atlantic ports.  When I worked for Sea Land their ships would not fit into the Panama Canal.  Everything that originated in Asia for the gulf coast or east coast on Sea Land ships was off loaded in Long Beach, trucked to the S.P. yard and "land bridged" to Houston.  In Houston the freight was put aboard another Sea Land ship for Florida gulf ports or Atlantic ports, or even Europe.  Freight originating on the East Coast or Europe for the West Coast on Sea Land was "land bridged" the opposite way from Houston to Los Angeles and trucked to Long Beach if it was to be loaded back on a Sea Land ship.

My father in law was an engineering officer in the merchant marine.  After our first daughter was born, he sailed exclusively on U.S. Lines ships.  He retired just before U.S. Lines declared bankruptcy and went out of business.  He always got on a U.S. Lines ship the departed from Elizabeth New Jersey, went down the Atlantic seaboard, and gulf ports, went through the Panama Canal, and stopped in Long Beach before going up the West Coast and on to Hawaii and the Orient.  The route then reversed from Hong Kong, and came back to the West Coast to Long Beach and back to Elizabeth.  His trips were 3 month in duration and we would get a few hours to visit both ways when he was in Long Beach.  When he got off the ship back in Elizabeth, he was on vacation for 3 months before he caught another U.S. Lines ship back to the West Coast to visit us.   The U.S. Lines ships were smaller than the Sea Land ships, so could go through the canal.

Reply 0
railandsail

Plaster Concrete

reminder.....

Quote:

Although it is a bit labor

Wed, 2021-06-23 18:17 — kregan

Although it is a bit labor intensive I choose plaster again for the streets after trying different products.

In this photo I had not poured the center section between the rails. I found it was much more easier to pour the outside areas, then do between the rails as a separate pour.

Here I am using acrylic wash to weather the plaster.

8%281%29.jpg 

Reply 0
Reply