James Leighty Jim Leighty
I have been working on my Family Room expansion of my CNY&NE RR which includes a double deck addition that is 20"x 17'.  A work in progress is my Franklin Milling Company which is located on my upper deck in the town of Franklin Mills.  This mill is typical  of a  Northeast family owned  mill that has been expanded over the years.  Franklin Mills is on my fictitious D&H  West Auburn Branch which also has a few other large industries  and some small ones, providing enough switching work for a crew of two  for an entire op session.
 
IMG_0864.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 30
MikeHughes
Amazing structures. 
Happy NMRA Member since 2024
Reply 2
James Leighty Jim Leighty
Thanks Michael for your kind words. Basically, my new upper deck Family Room extension is done and ready for OPs. I am currently working on a freight house, which I will post some pictures of soon. It is a modified Sylvan Models kit which has board and batten siding and seems to fit right into my theme for Franklin Mills. I do need a passenger station, but that will be worked on over the summer.  Operations are a D&H RS-3 goes on duty in Franklin Yard with about 12-15 cars to spot at local industries and it picks up an equal amount of pulls, according to the switchlist. It sometimes travels to Northfork Yard (main train room)  to interchange cars with the CNY&NE.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 3
James Leighty Jim Leighty
The Franklin Mills freight house has to fit between 2 tracks so the rear overhang and platform had to be omitted from construction. The roof will have a slight saltbox effect with the rear overhang removed. I installed a Tichy freight door on the side gable end and will add a small loading platform using the material saved from not installing the rear platform.  REA Express trucks will be able to use this side platform for loading/unloading express shipments. I have built a few of these Sylvan kits as part of the Rutland Car Shops line and they turn out really nice.  I will post more pictures as construction progresses during our current Northeast Snowstorm.IMG_0900.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 8
Eric Hansmann Eric H.
That's a nice looking freight house, Jim. Will you be installing interior bracing? If so, how much?
 
Eric

Eric Hansmann
Contributing Editor, Model Railroad Hobbyist

Follow along with my railroad modeling:
http://designbuildop.hansmanns.org/

Reply 3
James Leighty Jim Leighty
Hi Eric, yes lots of interior bracing needs to be added. I noticed that the accuracy of the castings are a bit off.  I needed to cut and file the two gable ends as they did not match up. Must be due to shrinkage after the castings are made??  I like to build resin kits on a piece of Homasote so you can easily use pins to hold the pieces in alignment while the glue dries.  It will be a nice looking period freight house when completed with a New England flavor, which I thought fit in well into the Franklin Mills D&H theme.
 
IMG_0903.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 5
Eric Hansmann Eric H.
Looking good, Jim!
 
In building resin freight car kits, I often check the length of sides and ends as I start building a kit. Sometimes the ends do not quite match in length. I sand the top or bottom of each part flat, then place them back-to-back with the side post or door details lined up. S touch or two of CA along the flat top or bottom keeps the two parts lined up. I use an NWSL sander to sand a bit from each end of the casting so the lengths are equal. A razor blade easily cuts the CA bonds and the excess adhesive is sanded away.
 
A similar method could be done with the freight house ends. Line them up back to back, even along the bottom and sides. A spot of CA in a few places at the joint keep the parts together so you can sand the roof lines, or other places, even.
 
Eric

Eric Hansmann
Contributing Editor, Model Railroad Hobbyist

Follow along with my railroad modeling:
http://designbuildop.hansmanns.org/

Reply 4
James Leighty Jim Leighty
Eric, Temporarily glueing the parts to align and sand them  is a cool idea.  I was surprised how far off the 2 ends were. There was an 1/8" difference in size which would really mess up the roof system panels if it was not corrected. Using Isopropyl Alcohol as an ACC glue accelerant helps speed up the process.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 5
James Leighty Jim Leighty
Here is the finished freight house sitting in Franklin Mills. I used the platform and roof material  from the rear loading porch that I removed in order for the building to fit between the 2 tracks, to build the side gable covered loading dock for express trucks to use.  It is actually very cool to see the mill switch job working through the narrow opening between the freight house and Franklin Milling Co.  
 
IMG_0916.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 13
James Leighty Jim Leighty
Thanks for the encouragement, the roof is not individual shingle strips but is actually two very nice castings that are full of detail. I had to cut the rear piece and it was very difficult to score with a sharp modeling knife. The material is thick and very hard to cut, even though I bought this kit several years ago. 

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 4
Reply