James Leighty Jim Leighty
I have been working on my Family Room expansion of my CNY&NE RR which includes a double deck addition that is 20"x 17'.  A work in progress is my Franklin Milling Company which is located on my upper deck in the town of Franklin Mills.  This mill is typical  of a  Northeast family owned  mill that has been expanded over the years.  Franklin Mills is on my fictitious D&H  West Auburn Branch which also has a few other large industries  and some small ones, providing enough switching work for a crew of two  for an entire op session.
 
IMG_0864.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 30
David Emery deemery2
It is -so rare- to see a prototypically sized industrial building!   The size looks great, as well as the weathering.
 
dave
Modeling 1890s northeast US
Reply 5
James Leighty Jim Leighty
Thanks David, I experimented with many methods of weathering the Styrene corrugated metal and settled on dry brushing acrylic paint. Trying to keep it subtle and even took some patience.  I like bigger more prototypically sized industries too as they make your layout look bigger and more realistic. It justifies having a bunch of freight cars on hand.  This milling company is about 54"long.  Franklin Mills has some other larger industries and I will post some other pictures showing them.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 4
Lirrlirr
Nice work!
Reply 3
Eric Hansmann Eric H.
Whoa! Looks like I'll be busy at your next op session!
 
Eric

Eric Hansmann
Contributing Editor, Model Railroad Hobbyist

Follow along with my railroad modeling:
http://designbuildop.hansmanns.org/

Reply 4
James Leighty Jim Leighty
Yes indeed you will be busy!  One important thing you can help me figure out is how several operators will be able to work together sharing isle space once the lower deck town of New Sterling goes into service. Can switching operations on both decks occur at the same time or do I just do one at a time or divide the OP session into an AM work on one deck and PM work the other? 17 feet long seems like a spacious layout length until you get 3-4 guys working simultaneously.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 4
laming
 
You asked:
 
"One important thing you can help me figure out is how several operators will be able to work together sharing isle space once the lower deck town of New Sterling goes into service. Can switching operations on both decks occur at the same time or do I just do one at a time or divide the OP session into an AM work on one deck and PM work the other?"
 
I've had experience owning two multi-level layouts that hosted visiting operators:
 
* A 7'6" x 20' tri-level housed in a modified RV trailer. This layout lasted from about early 1987 to about April of 1998.
 
* My current semi-dual level w/nolix housed in a 16' x 20 out building. (100% functional since about July of 2019.)
 
 
Observations:
 
* I grew very tired of all the stacked towns on the tri-level when using visiting operators. Accommodating two operators was "acceptable"... but you had to work in concert around one another when switching two separate towns on the same wall. Three operators was miserable. (AND this was in the "blocks, rotary switches, n' toggles" era!)
 
* I can comfortably host 2-3 operators on my current partial dual level. However, as with almost ALL multi-level layouts, there WILL be times that it's awkward working around one another at a wall that includes stacked towns, both with intensive switching.
 
* Both of the above layouts had/have ample aisle space so that part of the equation is minimized. One can easily step around and behind the other to go to the other end of the town in question.
 
* I use RC throttles now, so there's no tether cords to deal with. Wireless throttles in itself is a great advantage for multi-level operations on account of not having to account for tether cords.
 
Bottom line:
 
With any multi, there likely WILL be stacked towns here and there. It turns out being part of the beast.
 
IMHO, though, IF there's ample aisle space, and IF there's wireless throttles, and IF the two operators work in concert well, it can be done and still remain fun.
 
 
Best of luck!
 
Andre
Reply 5
James Leighty Jim Leighty
Thank you Andre, that is very helpful information.  I am thinking that I will keep my operators in this area down to no more than 2 at a time.  I may operate one deck  for a period of time and then shift to the other.  Either that or let 2 operators work, one on one deck and one on the other. 

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 4
James Leighty Jim Leighty
The Mill originally was powered by water and the original flume is seen in this view looking Eastward. The branch continues West across the flume and onto the larger bridge across the Briar Kill (not modeled) to West Auburn. There is a night freight that runs from East Jeff to Northfork Yard that drops local cars here in Franklin Mills before heading to West Auburn.  This is a work in progress and this scene needs lots of scenery and detail work.  The mill building also needs additional piping.
 
IMG_0872.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 9
James Leighty Jim Leighty
Right next to the Franklin Milling Co is the main office and warehouse for Finest Foods. They bring in car loads of fresh meats, dairy products and canned food and distribute these products to their food stores through out the region. Trucks are loaded on the other side of the building.  This kit-bashed structure was made from two Walthers office buildings and actually hides wiring terminals, Frog Juicer circuit boards and other electronics fastened to the wall inside the building. This is a work in progress and the scene needs scenery, ballasting and other details added.
 
IMG_0865.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 14
James Leighty Jim Leighty
Thanks so much for your support and kind comments. The track that services Finest Foods and appears to go inside the building actually runs behind Franklin Milling Co and can hold up to seven 40' cars.  These hidden cars act like a staging area and create interesting switching tasks when certain empty cars need to be pulled and new loaded ones need to be spotted in their place.  Many larger industries have interior sidings where unloading needs to be out of the weather.  This is especially important with businesses handling food products.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 6
James Leighty Jim Leighty
On the East end of Franklin Mills is Northland Wood Products, which offers more switching in the town. Northland makes wood trim moulding and particle board using local lumber brought in by truck.  This scene is under construction and needs finished scenery, trees and details.
 
IMG_0870.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 11
James Leighty Jim Leighty
Here is where the upper deck Franklin Mills branch diverges from the mainline in the main layout room and then passes through the wall.  A double crossing was needed to cross over the Agway and Glassworks spur here in Northfork. This scene needs ballast, scenery and signals for crossing protection.
 
IMG_0875.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 9
anteaum2666
Hi Jim,
My first time through your post here, it looks Fantastic!  The size of your industries is just right.  Looks like a lot of fun to switch!!

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 4
Jonathan Greenlees
anteaum2666 wrote:
Looks like a lot of fun to switch!!
Ditto!
Jonathan Greenlees,
Chief Engineer on the Cottonwood Division of the Cateye & Southwestern Railroad.


My Journal (WIP):
 
laus Deo ✞
Reply 4
laming
 
To echo Michael's sentiments:
 
You have a great looking layout in progress. I, too, think it looks like it would be a lot of fun to switch. And, I also noticed the nice size of the industries. That in itself really lends credibility to the visual "believablity" of your effort.
 
You're doing great!
 
Andre
Reply 5
James Leighty Jim Leighty
Thanks to all for your kind comments.  Yes, with over 50 industrial sites and interchanges on the CNY&NE, it is a fun layout to operate.  I like larger industries as they offer more switching opportunities and make my layout look bigger and more realistic.  My layout appeared in the October MR if you want to see the layout plan and more pictures.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 4
billgill4
Jim, Your Central New York & New England Railroad is totally different than my tiny Connecticut & Vermont RR, but as others have said, your railroad sized industries  truly make for a terrific looking and operating layout.  
Reply 4
James Leighty Jim Leighty
The CNY&NE actually has a blend of different industries in a range of sizes. My bigger structures include 2 GE plants, a 96" long Lime plant, a coal mine with carbon powder processing, a glass manufacturer, a bunch of larger sized warehouses, Franklin Milling and Finest foods. I also am planning on a metal stamping plant, a distillery and lubricant company in the city of New Sterling  which is under construction on my lower deck Family Room expansion below Franklin Mills. Lots of medium sized industries and small ones like team tracks, freight houses, and many others have their home on my CNY&NE. Switching is king, but passenger and heavy freights are part of our operations.

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 3
James Leighty Jim Leighty
This picture of Finest Foods shows the tunnel that passes into the Northfork Yard area in the main layout room.  Making a tunnel in the middle of the scene look right is difficult when your footprint is only 20" deep.  I like stonework so added a retaining wall to add depth to the scene. More scenery will bring this section to life.
 
IMG_0871.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 7
James Leighty Jim Leighty
Sometimes, the D&H Franklin Mills switching crew travels to Northfork and Bradford (into the adjacent main layout room) to switch Bradford Limeworks and interchange with the CNY&NE in Northfork Yard.  Merry Christmas to all!
IMG_0876.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 14
James Leighty Jim Leighty
Thanks so much for the kind comments and encouragement that you all have given me. Although I had the space and the blessings from my wonderful wife to build a bigger layout, I  reframed from doing so wanting to build a medium sized more easily managed project.  I have seen other modelers who have tried to build huge railroad empires and have become overwhelmed with maintenance issues and  have bitten off more than they can chew. My main 12'x20' main layout room is 85% complete which gives me more time for my current family room expansion, which has been fun.  
Wishing you all a very Merry Christmas!

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 4
James Leighty Jim Leighty
Some have asked if I am also working on my lower deck New Sterling Branch which is directly below the new D&H Franklin Mills Branch extension in my Family Room. The answer is that I am trying to get the upper deck far enough along to justify including it in my OP sessions.  My plan is to start building some large industrial buildings later this winter in New Sterling.  Stay tuned!

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 3
James Leighty Jim Leighty
The Franklin Milling Company  scene is nearly complete with facia installed, some terrain changes added, ballast and ground cover completed, and trees and bushes planted. I still need to finish the freight house and station before the scene can be called completed. 
IMG_0895.jpg

Jim Leighty

Central New York and New England Railroad

Blog: https://forum.mrhmag.com/post/jim-leightys-blog-index-12227310

0tiny(1).JPG

Reply 14
anteaum2666
Wow!  That looks awesome!

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 2
Reply