Hi all,

I model a whole transportation system that is operated probably as prototypically as possible based on extensive research and given the technical impossibility of operating this transport system exactly prototyplcally. But for my transportation system there was no TT/TO, track warrant systems, no fixed signals or complicated train management system. Why?

Because the line was operated as "one locomotive in steam" - this meant that there was "nothing to hit" while the only operating locomotive was out there doing its stuff. Trains ran as often as the locomotive and its train could get from one end of the line to the other, and its train was swapped for another train going the other way. 

Is it likely that this layout of a transportation system will make much of an appearance here? So far, based on some of the comments I've received in various previous postings about the method of its build and logic behind how it was built as a sectional layout,  this is probably most unlikely.

After all, this layout is:

  • is based on a  "single industry" pike that hauled coal, a not very glamourous product, 
  • only ran just over a mile on the prototype,
  • only ever had 2 operational steam locomotives at any time in the 50 years of its operational life,
  • was narrow gauge, 
  • was not in the US/Canada,
  • is still small as a model layout in terms of overall footprint when compared to a larger "basement filler" layout
  • has a model train length limited to loco plus 11 small, identical-looking wagons
  • was built using a modified TOMA approach (staged construction of its modules) 
  • was planned for future exhibition use (and I've been told repeatedly here in response to some of  my previous postings that any techniques/approaches used have little or no relevance for a "home build" TOMA-based layout.)
  • probably not of much operational interest because it doesn't use US-based railroading operational practices (because it wasn't in the US? - strange that?)
  • and, was built for a different purpose than a home layout, This layout was built to do more than just "entertain the operators" as perhaps are most home layouts, when the purpose of a home layout is distilled to its essence.

The layout consists of 12 modules and covers a floor area of 23' by 17' (Hmm - starting to get towards a half-way decent sized "basement filler"  layout size). It will not grow any larger, because the logistics of moving and storing a layout of this size that doesn't have a permanent home define the layout size limits.  

Could it grow bigger? Undoubtedly yes. But should it grow bigger? No - this layout is at the limits of what can be easily stored, transported to a venue, speedily set up (in about 1 hour) and speedily dismantled for transport back to storage by a 2 person team.

Any given module can be separated from its neighbours in well under 5 minutes, and, in most cases under 2 minutes if work/running repairs are needed when the layout is together.. When not set up, any module or combination of adjoining modules can be easily pulled from its storage frame to have additional detailing work/running repairs done on it at the workbench. 

So just what did this sectionally-based, phased-build of model coal transportation system end up looking like?

_800x600.JPG 

Yes there is still more to do before this layout is fully exhibition ready, but it is almost there. How much more you see of this layout on here, and the saga of its build, is largely up to yourselves, given what I've listed above this photo,  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 12
Oztrainz

Detailed photos from the "mirror"

 Detailed photos from the "mirror"

Hi all again,

In the last message I posted this:

1270621a.jpg 

So let's have a look at it in in more detail. 

Having a closer look at the breadboarding and Arduino, 

1270604a.jpg 

The 3 output indicator LED's in the right panel of the breadboard have been removed and the outputs have been channelled to the 3 relays out of shot to the right. Each relay has its own indicator LED that lights when the coils is energized. Having a closer look at the relays. Each relay has been labelled with the relay outputs as indicated by the LED on each relay

1270605a.jpg 

The outputs of the relay go to:

1270606a.jpg 

At top -  This replicates the same gearhead motor, potentiometer and isolating switch as used  for the tipple chain. The Motor has its own DC supply. This is to keep the electrically noisy motor electrically isolated from the Arduino logic wiring. 

Below - The ANE SwitchMaser board. and 2 relays. The  SwitchMaster board is powered by Vin and Ground from the Arduino. As an additional benefit, this enables a common-earth for all switching prior to the relay outputs. The upper servo is the servo driving the tipple cage. The lower servo is the servo driving the kickback siding  The servos have been fitted with different horns so that they look visually different and have been set for different speeds and throws. The Cage Servo is set for speed 5 (about 3 seconds for throw travel) and the Kickback servo has been set at speed 8 of 9 (for almost instantaneous travel)

Contingency plan - the servo driving the tipple cage is far larger than those shown above. When installed under the layout, the SwitchMaster board will get its own dedicated 12V DC feed direct from the same regulated wall wart that is driving the Arduino. This should bypass any current limit problems from the Arduino  Vin/Ground connection and still achieve the common-earth.

That'll do for this post. Back next time with a photographic step through of it all working. 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Geoff Bunza geoffb

@Joh G re: Success !

@John G re: Success !

Hi John,

Congratulations young man! You did it! 
 
One comment for the production build: since you are using multiple modules, make sure you have good, solid ground connections among all the appropriate modules, with minimal length power and ground runs as possible.
 
If you must have long power/ground runs, say to a servo which can occasionally have high current demands (as on startup), or any other high current module, then adding a small capacitor set (10uf and .1uf in parallel) across the power feed to the servo or module, as physically as close as possible, may save you some grief in the future. Consider this to be preventative medicine. I think this was covered in more detail by that other young man, Peter, in his Servos 101 https://forum.mrhmag.com/post/servos-101-12203325 or in his layout blog The Redwood Sub here:  https://forum.mrhmag.com/post/the-redwood-sub-12202602
 
Looking forward to "the rest of the story" and more successes!
Have fun! 
Best regards,
Geoff

Geoff Bunza's Blog Index: https://mrhmag.com/blog/geoff-bunza
More Scale Model Animation videos at: https://www.youtube.com/user/DrGeoffB
Home page: http://www.scalemodelanimation.com

Reply 0
Craig Townsend

Way to go! Easy as pie

 

Way to go! Easy as pie right? Craig

Reply 0
Oztrainz

Gone Nuts again

 Gone Nuts again

Hi all.

more retaining wall NB&W details

-750x563.jpg 

It is a rather dodgy retaining wall - "things" have "moved" over time. It was straight when it was built a twenty years previously. 

-750x563.jpg 

The downhill run protected by the retaining wall heads down to the lower level at the powerhouse on the next module, but never quite gets there because the powerhouse loading bay is off layout. This retaining wall still needs to grow some weeds and the module itself still needs a front fascia board That's nuts enough for now.

Remember that module plan from way back on Page 1? This retaining wall is on Mine 1 Module. 

But Bernd's module tour from the earliest pages never ever got to this module. The tour resumes next post.

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

Module 6 (Mark 2) - The trestle module

 Module 6 (Mark 2) - The trestle module

Hi all

as a quick recap on what goes where

%20Final.jpg 

Continuing on the layout from where we left off after the first six module on pages 2 and 3 previously, the next module up is the Trestle Module. This new module replaced the Train Turntable Module as Module 6 - The Train Turntable Module will return in the future as a different module,

Module construction

This module was actually the last to get scenery and used a modified TIG-welded module frame. It was largely designed and built by my construction partner, Guy Gadsden 

This photo shows the TIG-welded frame with the depressed centre at the front for the creek valley. Also note the height difference to the track level on the adjacent module to the right,

1230022a.jpg 

The steel ruler indicates where the trestle bridge will eventually go in. The 2 front central joints and the transverse frame members from those joints were TIG welded. This gets around one of the known structural limitations of using aluminium frames with the plastic corner pieces, where the structural integrity of a module can be badly weakened if you cut the main longitudinal frame members.  This is the first known module where this method of fabrication has been used. Previously bracing plates had been used to reinforce such joints. But if you have access to a TIG welder...

Operations

This module is where steam haulage between the mine and incline ends. The steam locomotive is swapped for a battery electric locomotive that will move the loaded coal skips to the incline top. The steam locomotive proceeds onto the adjacent Water Tank module and waits at the water tank while the loaded skips are moved. The steam locomotive then heads up the light blue track to the incline top and picks the up empty skips and takes them over the trestle back to the mine.

What was

Colloquially known as the "big bridge" the actual location of this trestle bridge was actually closer to the mine than as laid out in the module plan above. The exact dimensions of the trestle bents supporting the main span are unknown. When the site was visited in 2013, only one of the 2 main horizontal timbers remained unsupported spanning the gap across the creek valley and then vanishing into the bush. the supporting bents and the deck above this span timber had all rotted and fallen into the creek valley

1010737a.jpg 

So not having any real dimensions or descriptions of the bridge to go by, we cooked up our own timber trestle bridge, based on Australian practices, that was probably far more substantial (hopefully and far more impressive) than was actually on the prototype.

The model

The trackplan is very basic, a single line crossing a creek on a timber trestle and here's the timber trestle installed

1240189a.jpg 

The trestle was a collaboration effort with Guy doing the build and Professor Klyzlr acting as technical adviser.

By Easter 2017, this module had yet to grow much vegetation. but it was running trains between the mine and the incline.

1250028a.jpg 

Last weekend the trees started to come to the trestle module

1270704a.jpg 

and

1270705a.jpg 

There is still more to do on this module, but here's what we're shooting for

1270710a.jpg 

The journey continues next time as we head towards Brokers Nose. Only another 5 modules to go...

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

Module 7 - the extra "Jump" module

 Module 7 - the extra "Jump" module

HI all again,

The "Jump" module was never in the original plan of 11 modules as shown below

imalSt3a.jpg 

The problem with this design is the 4-way module joint between Mine Run1/ Brokers Nose 1/ Brokers Nose 2/ Mine 1 modules. Even when working with bare frames this joint looked problematical and was difficult to line up. So there was some creative redesign after the TIG-welding technique was thought up. This is one of the advantages of having a fabricator/welder on the team. As far as we know, this is the first aluminium frame module to get the TIG-welded approach.

The revised plan now became:

%20Final.jpg 

with the Mine Run module being reassigned as the Trestle module and a new 1400 mm long "Jump" module with 4 TIG-welded vertical supports that lined up with the inner aluminium RHS ends of both the Brokers Nose modules. The Jump module allows the track to jump to and from the Brokers Nose modules from either the mine or incline ends.  

A photo of the Jump module in the foreground and the 2 Brokers Nose frames

1180763a.jpg 

and detail of the TIG-welded frame junctions

1180762a.jpg 

Experience gained with the TIG-welding on this module frame enabled modification of the frame for the Trestle module as discussed in the previous post. 

The track on this module enters and leaves at 4 locations. Getting things organised so that the tracks lined up first-time/every-time took some doing. There is a specific assembly order for connecting other modules to this one. 

Here's a stack of frames awaiting getting their baseboards attached. The Jump module is on top of the pile of Brokers Nose modules at right. Other modules in the photo are the 2 Mine modules and the as-yet-unmodified Trestle module covered in the previous post

1200894a.jpg 

The next photo shows construction partner Guy fitting the alignment hinges to 3 modules. The Jump module is at front left.

1200901a.jpg 

With solid baseboards and alignment hinges in place track centres were laid out but actual track laying was delayed until after the Trestle module frame was modified with its central cavity for the creek.

Because this is a railway that hangs on the side of a mountain the decision had been made early on that the track would be supported on piers. This allowed the public facing side of the layout to drop at the front, giving the capability of  more accurately representing the actual landforms of the Illawarra Escarpment. The next photo shows the wiring loom and support piers for future track entering from the Trestle module on the left and then swinging 90 degrees to head out onto the first of the Brokers Nose modules. 

1230035a.jpg 

The large switch in  the foreground is the block control switch for 4 adjacent modules. It allows either the Incline Operator or Mine Operator to have control of most of the Trestle, and all of the Jump and Brokers Nose modules.  

The next photo shows the completed track before any scenery was applied

1230064a.jpg 

And the same section of track after scenery

1270695a.jpg 

If any one is interested we can discuss further how you get from there (bare track) to here. 

At the other end of the Jump module, after scenery

1270701a.jpg 

where the track jumps to Brokers Nose on the right, and connects to the mine modules in the left foreground.

That's probably enough jumping around on the Jump Module,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Something Changed??

 Something Changed??

Hi all again,

First off - Thanks to those who have been along for the ride since the beginning, Since I kicked off this thread. I have kept a loose eye on "read counts" because of the rather unique features of this layout. It isn't your typical layout that you find regularly discussed on this forum or appearing in the MRH magazine.  Previously the count chugged along at about 70 "reads" after each post. 

I'm not sure what changed last weekend after the two previous posts? In 2 days the "read count" jumped by more than 500 in under two days and is approaching 900 reads in 5 days. If 10 new readers read all 13 pages so far on this thread then my understanding is that would count for 130 "reads" which is a long way short of these increased "read" numbers. So to those who recently discovered this thread, welcome aboard. Go get a cup of your favourite libation and read along as the mood takes you.  

Should this thread continue beyond getting from one end of the layout to the other ( and we still have another 5 modules to go)  then there is still much more that could be covered here, Some of the other topics that might surface here later given sufficient interest:

  • types of incline
  • coal skip design using inside bearings (including 3D-printing)
  • prototype versus model (locomotives/skips/buildings/operations)
  • relationship between mining technology, industry practices and mine buildings on this layout
  • selective compression as applied to this layout
  • design philosophy for building and display of "exhibition layouts" as opposed to a "home layout".
  • logistics behind a mobile sectional layout using modules
  • and others thought of but not mentioned above

Secondly, I offer an apology for the last 2 updates. I got the module numbers wrong.   They are fixed now.

The numbering problem was partially caused by me forgetting that the previous Module 6  - (the Train Turntable) was replaced with a scenery module (Mine Run 1) that much later morphed into the Trestle Module. When you have a build time extending over several years, sometimes it is hard to remember what happened when and why.  

The journey continues next post with "The Brokers Nose Modules - Design Considerations" 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

The Brokers Nose Modules - Design Considerations

 The Brokers Nose Modules - Design Considerations

Hi all,

as promised, The Brokers Nose modules, Brokers Nose 1 and Brokers Nose 2. These protrude from the front on the layout as shown in the module map below and are positions 8 and 9. I'll cover each of the modules in a separate post soon.. 

%20Final.jpg 

The Prototype

First off let's have a look at the prototype Brokers Nose. From Mount Keira above Wollongong, looking north along the Illawarra Escarpment towards Sydney. Brokers Nose (aka Mount Korimul) is the first ridge to the right of the road in the photo below.

1270632a.jpg 

Looking a little closer, the communication tower on the top of Brokers Nose can be seen

1270633a.jpg 

The small clear patch directly below the communication tower is the former Corrimal Colliery mine site. The 2 ' gauge line ran for a mile, roughly slightly up and to the right from the mine site along the 500' contour to get to the incline top. The incline kicked back at about 150 degrees to finish near the houses in the bottom of the photo. This incline finished in 1955. There is over 60 years of rainforest regrowth hiding where the railway and incline were. 

From below, near the end of the former incline, it becomes apparent just how much Brokers Nose dominates the landscape

MG_8922a.jpg 

The Model 

"Normal" exhibition design practice would be to have a straight edge to allow the public to "slide" along the layout and onto the next layout being displayed So why have these 2 modules that stick out??  

Let's have a look at an earlier version of the module plan in exhibition mode with a 600 mm or 2'  crowd clearance at the front of the layout and around the incline

dStage3a.jpg 

From this plan, some things can be made apparent:

  1. Without the Mine Run 2 or Jump module, the planned steam-hauled trains of 11 coal skips for a length of about 300 mm would only have to travel across the 1200 mm long Mine Run 1 module,  This is an approximate run to train length ratio of about 4:1. This severely limits the steam-hauled run between the mine and incline top that is a characteristic of this specific railway. 
  2. We are attempting to modelling a mountain railway, where the track is clinging to the side of the escarpment. The planned track height from the incline top to the mine is 1300 mm (or about 4'3"). So the vertically challenged will almost be looking up at the train as it threads its way through the landscape
  3. The addition of the Jump module and the 2 Brokers Nose modules increases the distance between mine and the water tank module significantly to about 3 metres. This gives a run to train length ratio of about 10:1. Given the low speeds of this type of an industrial railway, the steam-hauled portion of the journey now has some significant distance to travel and will take some significant time to cover that distance. This should also help keep the public looking at the layout longer while this train is in transit.
  4. The area inside the Omega loop of track on the Brokers Nose and Jump modules can be developed with mountainous scenery, with most of the journey appearing to be along a ledge, thus helping to achieve both #1 and #2 above. 
  5. A person standing at the mine cannot see the whole layout. A person standing in the area marked "Access 1400 mm" cannot see the whole layout. A person standing anywhere along the incline edge at the right of the plan cannot see the whole layout. This forces the public to move along the layout as the trains and coal skips drift in and out of view as they move between the mine, incline top and tipple at the foot of the incline. 
  6. However a person in the area marked "Access 1400 mm" can be fully surrounded in scenery for better than 180 degrees. While this may prove problematic in terms of access in big crowds, the opportunity to try for an immersive modelling experience ( with scenic cameos and, including layout sound in the future) was too good to pass up. 
  7. The 600 mm or 2' crowd clearance is sufficient because most of the time the tracks are set back from the module edge, 

 That'll do for this post, come back next time to see the Brokers Nose build process start,     

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

A deviated reality? A diversion into "levels of reality"

 A deviated reality? A diversion into "levels of reality"

Hi all, 

The Brokers Nose will return shortly.

In the March 2018 MRH edition, in the Publisher's Musings column the topic of "levels of reality continuum" was raised. What follows is a copy of my musings of what might happen if you apply the "levels of reality continuum" to this specific layout across multiple aspects of the layout .

Where photos are available, we have tried to "go close"  those photos in attempting the "illusion" of modelling a selectively compressed, Australian coal mine set in the mid-1920's. But coal mines are rarely the most photogenic subjects, even on the rare occasions that someone points a camera at them. 

I think that by bringing my musings  about the 'reality continuum" back here may add to depth of information in the thread and may serve as a discussion point at some future time.  Quote starts: 

Sometimes other factors decide what your level of realism has to be. 

That's a big statement but let's break it down a bit for my specific instance. Given that the "level of realism" has been expressed here as: "how good the illusion is.. ..does the scene look like the prototype scaled down"  

In my specific instance I'm building a layout to be publicly exhibited that has no fixed permanent setup location. I model  a coal mine with narrow gauge tracks between the mine and the tipple and screens feeding coal to small standard-gauge wagons in O-Scale. The level of realism required for this layout is one of the things that has led to much discussion during the build, Lets see how just these 2 factors of planned public exhibition and no fixed display location play into the "realism spectrum" as proposed. 

On the prototype, the mine used: 

  1. a powered haulage to feed loaded skips.to the surface and to return empty skips underground
  2. a steam powered railway to move skips between the mine and the incline
  3. gravity shunting  and pit ponies to move loaded skips from the end of the steam-hauled section to the top of the incline
  4. a self-acting continuous rope incline to get skips down to the screens for unloading and to return the empty skips back uphill  
  5. a standard gauge steam hauled railway to take sized coal away to the market
  6. pit ponies and man propulsion to move skips in some areas near the mine entrance.

Lets look at this as a "game" where the "level of realism question" is "applied" and then ratcheted up or down depending on the answers when looking at the following aspects: Assuming we start at "3' rule with moving trains" (aka Level 1)

If the level of realism is only applied to the rolling stock on the layout

Given that most of the rollingstock is coal skips:

Dimensionally correct for frame and coal tub, fitted with inside bearings - Go to Level 7

Weathered applied - stay at Level 7

Wheel diameter 1 mm too large  - Fails Level 7 - go to level 5

Missing interior bolt details in coal tub body- Fails level 7 & stay at Level 5 (remember 1/2 of the time this detail will be hidden because these skips actually move and tip coal from these wagons)

Bolt and rivet detail missing on exterior body bracing - Stay at Level 5

Incorrect coupling used - The coal skips had simple hook couplings linked by loose 3-link chains. As yet I've not seen anyone use this type coupling without "hand from sky intervention" when coupling or uncoupling. In an exhibition setting our build crew  decided "the hand from sky intervention" is a less than desirable manner of operation given other factors of layout height and manner of operation of the layout overall. A more visually intrusive coupling was used that enabled fixed ramp and electromagnet uncoupling at dedicated locations.- Go back to Level 1  

If the level of realism is only applied to the model's structures on the layout.

Given that buildings don't move,
about half of the buildings on the layout are fixed to the layout and will be viewed at about 3' range - Go to Level 2 
 
The rest of the buildings are removable for transport, so possibly could be visually examined at close range, but not under operating conditions - Stay at Level 2
 
Some buildings will have internal scenic cameos staged either just inside the door or behind the windows,  You will probably need to be closer than 3' to see them. Level 4 is possible, Under operational exhibition conditions this is not going to happen -  Stay at Level 2 
 
Given that this layout is intended for public exhibition - A large number of people at any public exhibition will have with them camera or smart phones with a camera with an optical zoom of 10 or better. From 3' away they going to be looking at the layout applying Level 6 or better, but at restricted viewing angles. Apply Level 4 because of the restricted viewing angles..  
 
Most public have no idea of what buildings are/should be on the surface at a 1920's coal mime or what the actual purpose of those buildings was, Maybe we can back the level of realism back off a notch or two? Go to level 2
 
Given some prototype buildings cannot be fitted in at all because of space limitations on the layout and others are not required because the layout HAS to be operated differently than the prototype. This means that the "level of reality" possible is badly compromised. - Subtract 2 levels to a new low - Go to Level 0 for realism for buildings at the mine. 

If the level of realism is only applied to the model's adherence to prototype "operations".

Copied from above - On the prototype, the mine used: 

  1. a powered haulage to feed loaded skips.to the surface and to return empty skips underground - technically impossible to be replicated because of tight curves and clipping/unclipping multiple single  skips to the haulage rope on the inbye and outbye tracks. Battery-electric locomotive haulage substituted  - Go to Level 0
  2. a steam powered railway to move skips between the mine and the incline - replicated with "near enough" locomotives hauling "near enough" coal skips - Go to Level 2
  3. gravity shunting  and pit ponies to move loaded skips from the end of the steam-hauled section to the top of the incline - technically impossible to be replicated in miniature. Battery locomotive haulage substituted  - Go to Level 0
  4. a self-acting continuous rope incline to get skips down to the screens for unloading and to return the empty skips back uphill - Replicated operationally but with non-operational haulage steel rope - Go to Level 3 at best. Unfortunately most of the public won't care or understand the level of engineering "black magic" involved just to make this particular illusion occur.
  5. a standard gauge steam hauled railway to take sized coal away to the market - replicated as a series of static scenic cameo's with a detailed representative, but not prototypical locomotive with correctly dimensioned wagons with prototypical couplings an exterior details - Go to Level 4 because of the layout height at track level below the Screens.
  6. pit ponies and man propulsion to move skips in some areas near the mine entrance. - technically impossible to model operationally, replicated as static scenic cameos - Go to Level 2 at best

If the level of realism is applied to the layout's suitability for purpose.

This layout is intended to demonstrate to the public the transport of coal from the mine on narrow-gauge tracks, down an incline, tipping and sizing operations then with subsequent transport to the end market in standard-gauge wagons, as carried out locally here in Australia in the mid-1920's. Operationally the layout achieves the aim of the layout but not in a totally prototypical manner. I'm not sure how you evaluate the "level of realism" overall for the total layout. 

This 12-module sectional layout is designed to go together and have trains running in well under 2 hours. Likewise this layout is designed to come apart and go back into its storage racks for transport in well under 2 hours. It is unlikely to ever have a permanent place of display, unlike a "home layout. This forces certain structural compromises in the level of compression that has to be used to achieve the layout's intended purpose as stated in the previous paragraph.

The size and location of module joints forces certain compromises to the track plan. The available volume in the storage racks also limits the height of structures and trees. These are additional limitations not usually faced by permanently set up "home type" layouts .- Go to Level 1 because most public will be about 3' away from the trains.    

Given that at a public exhibition a large number of people will have with them camera or smart phones with a camera with an optical zoom of 10 or better. From 3' away they going to be looking at the layout and applying Level 6 or better with their cameras - You'd better bring your best modelling game to town. Anything else probably won't cut it. 

Now where did I put my cape, top hat and magic wand?? And what's that magic word that magicians use to make the illusion happen? I'm going to need all their tricks. 

End of copied reply. 

Brokers Nose will return soon,

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Building the Brokers Nose modules

 Building the Brokers Nose modules

Hi all,

Now to build the Brokers Nose modules. For a variety of reasons this differs from "standard TOMA" practice, but what follows is a way to build a sectional/modular layout in manageable lumps of more than one module at a time. 

After the Jump module had the extra bracing welded in, all 3 modules were fitted with alignment hinges at the exterior module junctions and and fitted for bolts at the internal module junctions

1180774a.jpg 

Baseboards were fitted in order, Jump module, Brokers Nose #1 and the Brokers Nose #2 module. Care was taken to minimise any gaps at module joints before the baseboards were screwed to the aluminium module frames.

1180775a.jpg 

The position of the tracks was pencilled in, and then work stalled on these modules for several months as other modules took priority. But you don't have to feed these modules and with no scenery fitted they took up only marginally more volume than the already assembled bare frames. 

Previously I wrote back on Page 5: 

Quote:

Helmuth von Moltke or some other military analyst was quoted as saying something like "No plan of operations extends with any certainty beyond the first contact with the main hostile force" (ie "No battle plan (dream layout) ever survives first contact with the enemy (reality)" - loosely translated from the original German). He wasn't too far wrong. 

And so it was to be when we eventually got back to these modules. When Mine Run 1 module morphed into the Trestle module, the track arrived at a different place on the Jump Module, which then caused a track realignment around the Brokers Nose modules. Couple this with a tighter radius to get onto the Brokers Nose Module #1, and, when it came time to actually lay track, the track was now going to go down in a different spot. This then forced a rethink of the scenery possible on the Brokers Nose #1 module. The old track route can be seen the left of the new foundation piers. 

To give the impression of a railway on the edge of a ledge hacked into the side of the mountain, the track would be installed elevated above the baseboard. The next photo shows the foundation piers being installed on both modules. There is still a row of foundation piers to go in along both sides of the module joint, as indicated by the freshly drilled holes. The extra supports on the Brokers Nose 2 module will be explained later in this post.

1230038a.jpg 

This photo shows the Brokers Nose #1 module with the 4mm ply cut to shape and sitting on the foundation piers awaiting screwing to the piers. The ply serves double duty - it serves as the track foundation and also as the base for the landform of Brokers Nose. 

1230048a.jpg 

With the ply now fitted to both Brokers Nose Modules. The #2 module will later get some additional trimming along parts of the right-hand edge.  

1230049a.jpg 

Information received in the intervening months about the buildings on the mine site meant that space on the two future mine modules was going to be at a premium. One of the structures that we were determined to fit in somehow was the "Locomotive Shed".  We found the Locoshed location during a 2013 site visit. It was a few hundred yards away from the main mine site and portals. So this structure was moved to the Brokers Nose #2 module to free up space on the upcoming mine modules (just like as on the prototype)

1010723a.jpg 

The Locoshed was sited on a small flat area hacked into the side of the hill, with a creek hard up against it as seen in the left of this photo. 

Apart from the footprint of this building, only 2 partial photos had been found in several years of hunting. The Locoshed was simply 3 corrugated iron walls with 2 corrugated iron covered doors and some framing forming the fourth wall.

So we made a cardboard mock-up of the Locoshed using scale footprint dimensions to see how a Locoshed capable of housing 2 small steam locomotives tandem style might fit into the planned scenery and trackplan. This is going to be a tight fit.  1230059a.jpg 

In the background the "head of nickel silver" is clear of the Jump module and heading quickly towards the Locoshed in 36" bounds. 

Previously, only the Trestle end of the Jump module had got its deck. Now it was time for the mine end of the Jump module to get its foundation piers

1230069a.jpg 

and deck

1230072a.jpg 

As the "head of nickel silver" rounds Brokers Nose and reaches the Locoshed siding

1230074a.jpg 

So just what did all this end up looking like near the Locoshed once the tracks arrived?

1230083a.jpg 

With the Krauss at the Locoshed doors, Burra, the green loco on the track between the mine and incline, and the orange battery-electric loco on a track that will go to the mine workshop and beyond in the future.

That will do for this post. Come back next time when we grow some scenery on the Brokers Nose,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

Brokers Nose Scenery - why's and where-fors...

 Brokers Nose Scenery - why's and where-fors...

Hi all again,

It's been a while but this will be the first of several posts about scenery on the Jump and Brokers Nose modules. This scenery was being developed as the trackage headed towards completion across the last 3 mine modules. 

These upcoming posts will cover the methods used and reasoning for the way the scenic build was implemented on the model as compared to the prototype on the run between the mine and the incline top, 

Build direction and  technique decisions:   

Because the trestle module hadn't been built, let alone landscaped, the decision was made to work from Brokers Nose out both ways. On the two Brokers Nose module landscape had to fit "around" the engine shed. Given how close its back wall was to the module join between Brokers Nose 1 and Brokers Nose 2 modules, the shed's length was revisited and the structure was shortened to the bare minimum length to hold both Burra and Krauss locomotives. 

The track at the engine shed was also shortened to give us more depth for landscaping behind the shed.

The first pass of landscaping would be the mountain side above track level. The second pass would handle the mountainside landscape below the track foundation. The third pass would be textured paint The fourth  pass would be vegetation layers. 

2" layers of white bead styrofoam was chosen for the landscape foundation above and behind the tracks  It's light and robust when encased in a layer of Chux handwipes bedded down with acrylic caulking compound. 

While stuff above the track was drying, landscape foundation work below the track was done with a combination of hot-glued cardboard lattice and white bead styrofoam encased by Chux hand wipes and acrylic caulking compound. Again the same multi-pass approach was chosen for scenic development.   

Back with photos of how we did it next time,     

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Brokers Nose Scenery - Going up - Part 1

 Brokers Nose Scenery - Going up - Part 1

Hi all again,

Here's the scenic start point with the head of nickel silver now well established and partially ballasted on the Jump module, heading towards the mine modules. Stand by for some seismic shifts  and geological uplifts.

1230109a.jpg 

Remember how tight I said it was fitting in the engine shed? It was THIS tight.

1230113a.jpg 

The first stage of the uplift on Brokers Nose 2 module. Nothing magic here - take a bigger rectangular block of foam, line it up with the module joint, then push down hard onto the rails to mark the foam and cut about 1" (25 mm) inside of the markings made by the inner rail. This ensures that then next block for the Brokers Nose 1 module will also line up along the module join lines.

1230115a.jpg 

Extending onto the adjacent Brokers Nose 2 module

1230116a.jpg 

It's also easier to mark up and cut your second layer after you have the first one glued down. Simply run a felt- tip marker around the top of the lower layer and angle it up into the bottom of the second layer. Flip the second layer over and cut vertically along the markings. Here "ruff-enuff is good-enuff", because there is more cutting to be done later.   

It's now time to "batter-up" No, not THAT type of batter or the type of batter you have around your deep-fried fish    - THIS TYPE of "batter", that describes the upwards and backwards angle of a wall or cliff.  

1230119a.jpg 

This was chopped away with a sharp serrated knife, borrowed from the kitchen authority. For this stage the carving was done on the first individual module. Then the adjacent Brokers Nose 1 module was attached so that the cliff profile could be matched across the module joint area.

Then it was time for the second layer. Again the same process was followed - Carve the batter on the ,first module, join the modules together, then glue the next layer on the adjacent module 

1230130a.jpg 

This minimises the gap between foam blocks across the module joint  area, 

1230131a.jpg 

and carve away again. until

1230181a.jpg 

That's enough "uplifting" for this post - next up hiding the white..

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Brokers Nose - Hiding the white.

 Brokers Nose - Hiding the white 

Hi all,

It's been a while, but here is the next instalment of the Brokers Nose Scenery saga. - "Hiding he white" .

Again there is nothing magical here. But it can get messy pretty quickly. 

The approach used was to clad the white beadfoam in  a layer of Chux (or similar) hand wipes. with a coloured acrylic caulking compound. This does 3 things:

  1. It stabilises the white beads
  2. It provides a tough surface that can be used to hold scenery items like large trees, etc while the glue goes off.
  3. The colour in the caulking compound helps hide the colour of the hand-wipe pieces

This photo shows the process underway, with the caulking gun and the pre-cut rectangle and triangles of Chux handwipes on the top of the "plateau". Triangles come in handy where you have sharper surface transitions. They will stay flat where a rectangular shape will wrinkle when it is applied to the beadfoam surface.  

1230193a.jpg .

Choose which way you are going to work. I worked from bottom to top and left to right in a zigzag pattern. As a right-hander, the pieces of Chux seemed to go easier and were disturbed less in subsequent work.  

A closer look at the surface shows that some of the weave and colouring is still showing. This can be fixed after this layer has dried. Don't try and fix it while it still wet. You can undo a lot of good work easily unless you are VERY careful. 

1230191a.jpg 

The process then continued around Brokers Nose, working on each piece sequentially onto the Brokers Nose 1 module.

1230194a.jpg 

A closer look at the overhang area Can anyone see an impending problem??

1230195a.jpg 

It came back to bite us. Details in the next post... 

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Brokers Nose Oops - The Great Unchux

 Brokers Nose Oops - The Great Unchux

Hi all,

After carving the batter into the white bead foam for the overhang on Brokers Nose 1 module, I ran some clearance tests to see what the end product might look like.

1230146a.jpg 

Plenty of room?? Yeah Right! - I forgot about the second loco that has to make this run, the Krauss.

Even though the Fleischmann MagicTrains Krauss is nominally a smaller scale at 1/45 versus 1/43 for "Burra", the Krauss is a whole lot bigger in all dimensions, 

So...when the question was asked by another of the build team "Have you checked the Krauss yet? That area near the overhang looks a little tight" Unfortunately the question was asked after I'd chuxxed the cliff  on Brokers Nose 1 

1230197a.jpg 

It was time to send in the Krauss - and - it didn't fit. Those red steps under the cab hang out along way on a curve.

1230205a.jpg 

And so began "The Great UnChux", after an unsuccessful attempt to strip part of the cliff, it was far easier to just "unwrap" the lot and start over. It was a whole lot quicker as well. By now I'd had plenty of practice.

The white splotches in the next photo are the "carve backs" needed for the extra clearance required for the Krauss, a layer of Chux and some planned future scenics like weeds etc,  

1230224a.jpg 

and there was an extra spot that also required extra clearance, not just the overhang area.

1230225a.jpg 

This time the Krauss was sent in as the "clearance gauge" before re-chuxxing. From above it looks like plenty of room, but

1230218a.jpg 

from track level this photo shows just how tight things are around  the overhang

1230213a.jpg 

Then came the re-chux

1230229a.jpg 

and another test fit with the Krauss

1230233a.jpg 

and with "Burra"

1230235a.jpg 

While all this Chux was drying, the push was on to extend the head of nickel silver onto the mine modules and head underground,

Shortly after the tracks on the next 3 mine modules were completed, all 12 modules of the layout were assembled for the first time. This led to the next round of seismic uplifts at Brokers Nose  - more next time.. That's enough for now. 

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

Brokers Nose Scenery - Going up - Part 2

 Brokers Nose Scenery - Going up - Part 2

Hi all again,

When the layout all came together the top of the Locoshed could be seen from the wrong side of Brokers Nose

1230354a.jpg 

So another seismic uplift was required

1240204a.jpg 

And we now have to "lose the white" on this additional layer after it was battered to match the existing layers. The top layer was locked to the existing layers by some entombed toothpicks. A trick here is to go in at an angle across the join zone. This not only anchors things horizontally but it also prevents the top layer from lifting vertically while the glue dries. 

While the glue was drying up top, work had started filling in the void below the track. But that's the next post,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Brokers Nose Scenery - Going Down

 Brokers Nose Scenery - Going Down

Hi all,

Now that the landform has reached the third layer of upheaval, the next stage of the Brokers Nose saga was to fill in under the tracks. This was done using 2 different methods.

On Brokers Nose 2 module, the intention was to have the track bench on a ledge,  but the width of the ledge had been extended over time by the colliery using roofing stone/other unsaleable debris simply dumped "over the side" This results in a more gradual slope than what was planned for Brokers Nose 2 module. It was decided to try a cardboard mesh as a foundation in this area as shown below

1240213a.jpg 

Block foam was used to cross the module joint and then onto Brokers Nose 1 module, where a steeper drop-off from the track-bed ledge was required. This also provided a more robust scenery base across the module joint, area and helped minimise the join line.  The below track scenery started out looking like this

1240220a.jpg 

Then it was time for the chuxing crew to do their stuff. Sorry no photos of this stage. Come back next time when the white disappears and Brokers Nose gets turned into stone.

 

 

   

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Brokers Nose - Sandstoning

 Brokers Nose - Sandstoning

Hi all again,

The easy way to turn the coloured Chux landform foundation into something more rigid is with textured paint. Locally, there is a brand the does "Golden Sandstone". This type of paint needs repeated stirring and probably a second coat for good coverage, But it dries fast, so that by the time you get to the other end of a module you can go back to the other end and keep "painting" (I use that term very loosely )    

It took only a few hours to get to this:

1240243a.jpg 

- "sandstoned" both above and below the tracks

but the golden colour is a bit bright when compared with the local sandstone :

MG_8922a.jpg 

so with a few splotches of burnt umber

1240285a.jpg 

We now have a more suitably coloured foundation for vegetation planting. Next time "Going Green" on Brokers Nose. 

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Going Green on Brokers Nose - Part 1

 Going Green on Brokers Nose - Part 1

Hi all,

Decision time - Where to start and which way to go?? Again the decision was made easier because the Jump Module previously shown on Page 13 hadn't even been mated against the adjacent Trestle module and landform-matched when the Brokers Nose modules had grown to 3-layers high and been chuxed. So the decision was to start at the Locoshed and work both ways: 

  • around Brokers Nose and back towards the Jump module and on towards the Trestle module. Hopefully by the time the green gets to the Jump module, the jump module and Trestle module will have been landform matched and chuxed (we're working to a deadline here)
  • from behind the engine shed the other way onto the Jump module adjacent to the (yet to be described) mine modules.

The "green build" approach chosen was:

  1. For relatively flat areas near the track - lay a mixed layer of static grass with fibres up to 12mm length to give a knee-high uneven, un-mown grass/undergrowth look for O scale.
  2. Work up and back from the track, progressing along the track to give a layer of low scrub that is blended into the trees of rainforest on the escarpment where the grade of the bank is such that will allow trees to cling on to the mountain side
  3. where the grade is too steep, allow the sandstone textured paint to show and have vines and ferns clinging to rockface. 
  4. The area below track would be done after the area above the track. This would hopefully minimise any damage to previously greened areas by effectively working from the back to the front of each of these 3 modules. 
  5. Given that this is a mountain railway displayed at a relatively high viewing height,  the aim is to have the public looking into the trees.
  6. The height of trees would have to be limited because of storage and transport constraints. A gum tree on the Illawarra escarpment can easily be over 100' high. In 1/43 scale this is well over 2' high from where it comes "out of the ground". Given that each of these modules is already 450 mm (18") high from base of the module frame to top of sandstone, the use of scale height trees is technically impossible. Each of these modules has an allocated storage space limited to 600 mm or 2' high in the storage racks. So we'll have to fudge it by forcing perspective on the mountain side.  

So how did this "green build" approach turn out? Back with photos next time in Part 2

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Going Green on Brokers Nose - Part 2

 Going Green on Brokers Nose - Part 2

Hi all,

So how did this "green build" approach go? Time for some photos.

This first photo shows Brokers Nose Module 2 and the Jump module split while the glue dries after grassing across the module joint. Note the different greener shade of grass near the Locoshed as this area catches spray from the nearby waterfall. The grassed area towards the top of the cliff and at the foot of the cliff is on dumped stone from the mine and would be drier that the area near the Locoshed. At this time the Locoshed is yet to get its doors and paint treatment.

1240351a.jpg 

This photo shows the vegetation creeping around Brokers Nose 

1240350a.jpg 

The next photo shows the extent of vegetation approaching the join between Brokers Nose 2 (Locoshed) and Brokers Nose 1 (Landslide) module. Previously I have mentioned elsewhere on here the idea of blending scenery across module joints, where you pull up short and then apply scenery across the module joint and into the next module to get a consistent scenery "look" across the module joint.  

1240383a.jpg 

Here's the blend after it was done. You don't have to go far into the next module. This photo was after the modules were split to allow the glue to dry.

1240398a.jpg 

This is also an example of the use of "squishy scenery" across the module joint beyond the tracks. When the modules are brought together, the squishy vegetation on each side folds into each other to hide the module joint. Check out the next photo.  

Here's what it looked like after the blending across the joint was done and vegetation extended into the Brokers Nose module,

1240428a.jpg 

and the vegetation heads around the hill towards the landslide..

1240430a.jpg 

So what did all 3 modules look like after vegetation?

1240439a.jpg 

That'll do for this post,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Landslide!!! - Part 1

 Landslide!!! - Part 1

Hi all again,

On the Prototype 

Over the 50 years of operating 2' gauge trains between the Corrimal "Daylight" mine portals and the top of the incline there were numerous recorded landslips from either under the tracks or damage by landslide caused by bits of mountain "falling off" from above the tracks.

In a lot of cases, roofing or floor stone from inside the mine was simply dumped "over the side" to widen the bench carrying the tracks after landslips occurred. Sometimes the damage was bad enough to cause a minor track deviation to be built around the damage. Either way, the damage had to be repaired quickly because if the coal didn't get from the mine to the incline top, and then subsequently down the incline and into the standard gauge wagons waiting below, neither the miners or the mine owners got paid. 

So why a landslide?

There are many layouts out there featuring mountainous scenery. One of the features apparently less modelled is a landslide or the effects thereof. (Now having said that, I'll bet 50 people on MRH now point to their landslide modelling  )  

So I set myself a modelling challenge on one of the Brokers Nose modules. Brokers Nose 2 module had the loco shed, so that more or less decided that Brokers Nose 1 module would be the site of the landslide.

The primary ideas behind the landslide idea were: 

  1. to act as scenic cameo in its own right 
  2. as something to break up a long run of vegetated mountainside, and
  3. as "something different", not usually modelled

Way back on page 2, I posted this photo of the Dead-End module, that kind of hinted at some geological instability near the culvert and further to the left after the bend. 

_800x600.JPG   

The local Sydney Basin sandstones weather to almost a chocolate brown, but appear yellow/white when fractured, when like after a slide.

Here's a closer look at the slip near the culvert. The stability of the track bench has stopped these small slides from going any further downhill.

1230882a.jpg 

Things to plan for:

  • the distribution of sizes of rock in the fall - there will be smaller stuff at the start and end of the fall
  • an understanding of what might stop the bigger stuff from moving further - eg other embedded boulders or a flattening of the grade, large vegetation, etc.
  • damage to the surrounding area down hill of where the slide let go. 

I thought that these smaller slides had turned out pretty well. This time the plan on the Brokers Nose was to shoot for something a bit more ambitious than the small slips shown in the previous photos. 

Come back next time to see how to engineer a "recently-occurred" landslide.

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Landslide!!! - Part 2

 Landslide!!! - Part 2

Hi all, 

Continuing on from the previous post, this method seemed to work out OK,

Above the coal seams, the local sandstone is interspersed with bands of shale. This is softer than the sandstone and weathers away first, leaving the sandstone overhanging, as in the Beak of Brokers Nose shown previously. Eventually the overhanging sandstone gets too heavy or has cracks in it that reduce the strength of the sandstone and then bits fall off = Landslide or slip.

The following photo shows the un-daubed area where the slope steepens. This will become the path of the landslide.    

1240381a.jpg 

and a look at the slide path from a different angle as viewed from the other side of the slide, before scenic work commences. 

1240386a.jpg 

Eventually there will be another layer on the flat top. The landslide will have started in the lower part of that layer and continued on down the mountainside, past the bench carrying the track. We'll see how that plays out later.

A closer look at the top part of the slide path - I played around with the slope to get a kind of a natural funnel above the tracks that would channel the fall onto a relatively small area of the track bench.

1240389a.jpg 

As I mentioned previously, this type of sand stone weathers to a darker brown but fractures white to light yellow. So when the bits fall off, the sliding rocks will rub the lighter colour across anything they slide over, as shown in the next photo

1240411b.jpg 

This is simply achieved by rubbing on of my larger "sandstone rocks" down the textured paint. Chalks would produce a similar result. The darker colour near the track in the bottom of the photo is where the glue is still drying.

In my previous post I wrote:

Quote:

Things to plan for:

  • the distribution of sizes of rock in the fall - there will be smaller stuff at the start and end of the fall
  • an understanding of what might stop the bigger stuff from moving further - eg other embedded boulders or a flattening of the grade, large vegetation, etc.
  • damage to the surrounding area down hill of where the slide let go. 

In the top of the photo you can see some of the smaller and medium sized stuff that didn't get away as part of the slide.  

Remember that the colliery's business is moving coal. So, a speedy repair to any track damage caused by a slide is of the highest priority so that coal can move from the mine again as quickly as possible. With a chosen modelling period of the mid-1920's, petrol/diesel powered dirt-shifters are still some time away in the future. Pit ponies and human muscle power were probably used to move debris out of the way. Any of the really big stuff that landed on the bench and didn't "go over the side" would have been drilled, dynamited into smaller bits and levered over the side to get the track-bed clear for repairs. 

Smaller stuff simply would have been shovelled to the side of the tracks with "just enough" clearance to get the loco past the debris. Anything more than that is extra work and extra time before the track can be returned to service. Hence the pile of smaller debris between the track and the cliff face uphill of the track  The ballast around the slide site would also have been contaminated with smaller stuff and dust. Any damaged sleepers or rail would simply have been "tossed over the side" and replaced with new rails and sleepers.

Next time we'll look at modelling what went "over the side"

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Landslide!!! - Part 3 - Over the edge

 Landslide!!! - Part 3 - Over the edge

Hi all again,

As I mentioned in my previous post, getting the track back up and running after a landslide on the tracks was of highest importance to the mine and miners, So any debris, damaged rails ties, etc would have been tossed "over the edge" to join that part of the landslide that had gone further downhill than the track bench. So how does it look when modelled??

  • Again damage to the underlying rock was simulated
  • As well as adding some damaged tree trunks for trees that were snapped off when the slide went past.
  • Some of the energy in the slide will be lost at the track bench, so some of the boulders will start to hang up below the bench.
  • trees will have more drag resistance than the boulders and will tend to follow the slide down and will tend to be on top of the "pile"
  • various-sized tree branches will part company with the tree trunk due to impact damage with the either boulders or the mountain side on the way down 
  • For a "recent" landslide any actively growing trees knocked over by the slide can remain green for a while before the leaves die off and turn brown

First layer of rocks and shattered vegetation

1240420a.jpg 

and some cast-off bent rail

1240421a.jpg This lump of rail as later "rusted" before being glued in place amongst the slide debris

And how did it finish? Have a look.

1280439a.jpg 

The slide is that fresh that the mine manager hasn't be able to organise getting the "loose stuff" shot down from above the tracks yet, but the track is open and the mine can get its coal away. That's the main thing that worries the manager. Just don't blow the whistle near here..

So, here ends the landslide saga. 

There is still more than can be added about other scenery to the Brokers Nose and Jump modules, but perhaps we should push on the the last 3 modules, of the Corrimal mine itself? 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Building the mine - Part 1 History of the Corrimal Mines

 Building the mine - Part 1 History of the Corrimal Mines

Hi all,

If you a going to make a model of something that actually existed, perhaps it is smart to do some research before cutting stuff for modules? 

So why 2 Corrimal mines??

In the beginning, at about 1870 coal mining commenced at Brokers Nose mine under Brokers Nose at about 500' above seal level (ASL).This first Corrimal mine later became known as Brokers Nose Colliery. Only  one photo is known to exist of the Brokers Nose Colliery. It shows the colliery entrance, the winding house for  both the underground haulage and the start of the first incline haulage  This photo probably dates from the early to mid 1890's. 

Other photos from the same photographer's (glass plate negatives) collection show  the screens and tipple at the bottom of this incline, but with a different plant arrangement than that documented in a 1912 publication written by a mining engineer. The plant shown at the that photo of the lower end of the incline was known to have been commissioned in 1890 when the Corrimal mine was purchased outright by the Southern Coal Company of New South Wales  Previously the Southern Coal Company had been buying coal from Corrimal after its own mine near Mount Kembla, about 10 miles further south ran into severe geological difficulties. 

Sometime in the late 1880's, the Brokers Nose mine ran into trouble when it hit a 92' downthrow fault. In simple terms, you are mining coal OK, run into some "cooked coal" and then run out of coal because the coal seam has suddenly disappeared to 92' below where you were mining coal.

With the block of coal that you are permitted to mine rigidly determined by geographical survey on the surface, you need another way in to get at all the coal on the other side of the fault. And there was more coal on the "wrong side" of the fault than there was on the Brokers Nose Colliery side of the fault. With the strata dipping to the north, the easy way to find a new entrance point was to walk south along the mountainside until the coal seam came back up to you. And so the "Daylight Mine" was born about a mile south of the Brokers Nose mine. Initially the Daylight mine was just a way of getting miners underground to the coal. All coal was reaching the surface through the Brokers Nose portals after an underground powered cable-haulage was built into the coal seam on the other side of the fault. 

That changed in about 1905, when a steam-operated 2' gauge tramway was built along the mountainside from the "Daylight Mine" to meet the incline from the Brokers Nose Mine. In late 1904 an underground fire and a subsequent flooding event near the fault In the Brokers Nose mine cut the underground haulage and prevented coal getting out of the mine. This change in mining operations formed the prototypical basis for the Corrimal Colliery Incline model. 

There will now be slight recess and a diversion into coal skip design, both prototype and model, 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Build your own coal skips - Part 1 -Reprise

 Build your own coal skips - Part 1 -Reprise

Hi all again,

to help set up the saga of the coal skips - Here's a look at two previous postings about coal skips from way back on Page 7..

While we were working out how to build this layout we also had to work out how to build what would run on it. That included the coal skips that would run on the incline between the mine and the tipple.

In the real world the coal skips looked something like this:

from the side -

1000328a.jpg 

and from the end, showing the drawhook and dumb (unsprung) buffers:

1000327a.jpg  

The centre band with the loop is a harness attachment point for when the skips were moved by pit pony, There is a similar loop on the other end. But photos of the Corrimal skips show all timber skips were without that band, so the drawhook between the buffers was used at Corrimal for horse haulage. 

Although these skips hold 3/4 ton of coal, they really are quite small - on 2' gauge with 12" diameter wheels. 

Here's what they might have looked like when new 

1000360a.jpg 

The philosophy of model coal skip building will continue after we set some track down on the first 3 modules - That's up next,

End re-post,

Part 2 next,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Build your own coal skips - Part 2 - Reprise

 Build your own coal skips - Part 2 - Reprise

Hi all again,

To continue setting up the coal skip design saga - Part 2 from Page 7

Start repeated post:

It's been a while. So on to the nitty-gritty of building 1/43rd scale 2' gauge coal skips. 

The Mark I coal skip   

Our first attempts on the test rigs were simply HO bogies with magnets attached - simply to prove the concept of using magnetic haulage to represent wire-rope haulage on a steep grade. Remember the Mark 1 Test Rig?

These worked pretty well and allowed us to proceed towards something that looked more like a coal skip. Enter the Mark I coal skip

068a.jpg 

These Mark I coal skips used cheap 10.6mm diameter wheels. Magnetic couplers such as Kadee or Sergeants were ruled out because the steel in the couplings interfered with strong under-track magnets used on the incline chain .  So we opted initially for some cheap Lima couplers. With these were able to prove that ramp type uncouplers would work as shown on the lower level in the photo above. To see how the Top End works, may I offer a reprise of the test rig above shown in action with Mark I skips? 

 The Mark I skips were also used to test possible track layouts for the Tipple module and for the initial tipple "tipper-outer" trials. 

218a.jpg 

I'll cover some of the construction details of the Mark I coal skip and its development into the Mark II coal skips next. 

End repeated post - Next up a close look at the Mark I all-styrene coal skip.

Regards,

John Garaty