Oztrainz

Hi all,

I model a whole transportation system that is operated probably as prototypically as possible based on extensive research and given the technical impossibility of operating this transport system exactly prototyplcally. But for my transportation system there was no TT/TO, track warrant systems, no fixed signals or complicated train management system. Why?

Because the line was operated as "one locomotive in steam" - this meant that there was "nothing to hit" while the only operating locomotive was out there doing its stuff. Trains ran as often as the locomotive and its train could get from one end of the line to the other, and its train was swapped for another train going the other way. 

Is it likely that this layout of a transportation system will make much of an appearance here? So far, based on some of the comments I've received in various previous postings about the method of its build and logic behind how it was built as a sectional layout,  this is probably most unlikely.

After all, this layout is:

  • is based on a  "single industry" pike that hauled coal, a not very glamourous product, 
  • only ran just over a mile on the prototype,
  • only ever had 2 operational steam locomotives at any time in the 50 years of its operational life,
  • was narrow gauge, 
  • was not in the US/Canada,
  • is still small as a model layout in terms of overall footprint when compared to a larger "basement filler" layout
  • has a model train length limited to loco plus 11 small, identical-looking wagons
  • was built using a modified TOMA approach (staged construction of its modules) 
  • was planned for future exhibition use (and I've been told repeatedly here in response to some of  my previous postings that any techniques/approaches used have little or no relevance for a "home build" TOMA-based layout.)
  • probably not of much operational interest because it doesn't use US-based railroading operational practices (because it wasn't in the US? - strange that?)
  • and, was built for a different purpose than a home layout, This layout was built to do more than just "entertain the operators" as perhaps are most home layouts, when the purpose of a home layout is distilled to its essence.

The layout consists of 12 modules and covers a floor area of 23' by 17' (Hmm - starting to get towards a half-way decent sized "basement filler"  layout size). It will not grow any larger, because the logistics of moving and storing a layout of this size that doesn't have a permanent home define the layout size limits.  

Could it grow bigger? Undoubtedly yes. But should it grow bigger? No - this layout is at the limits of what can be easily stored, transported to a venue, speedily set up (in about 1 hour) and speedily dismantled for transport back to storage by a 2 person team.

Any given module can be separated from its neighbours in well under 5 minutes, and, in most cases under 2 minutes if work/running repairs are needed when the layout is together.. When not set up, any module or combination of adjoining modules can be easily pulled from its storage frame to have additional detailing work/running repairs done on it at the workbench. 

So just what did this sectionally-based, phased-build of model coal transportation system end up looking like?

_800x600.JPG 

Yes there is still more to do before this layout is fully exhibition ready, but it is almost there. How much more you see of this layout on here, and the saga of its build, is largely up to yourselves, given what I've listed above this photo,  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 12
Bernd

Corrimal Colliery and its Coal Skips

Corrimal and its Coal Skips

John,

Interesting set up. Have you given any thought to resin casting the skips? Could be faster and less work to make a multitude of skips.

Love animation projects. I'll be popping in to watch the progress.

Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 0
Oztrainz

The Mark I Coal Skip

 The Mark I Coal Skip

Hi all,

Having set he scene (again), now for the saga of skip design, eventually resin-casting and 3D printing will appear, but we had to crawl before we could sprint. When the first Mark I skips were built 3D-printing was very much in its infancy and we had a lot to learn. These skips date from mid to late 2010. About 12 were built for testing purposes.

The Mark 1 skip were all-styrene build by construction partner Guy Gadsden. We built cheap to prove the concept that magnetic haulage on steep grades might work. As mentioned above we found some cheap 10.6 mm diameter wheels and a quantity of Lima couplings for the hardware. The rest was styrene rectangular sections simply glued together with solvent glues. The outer sides of the coal bin were scribed to represent the 11" wide planks used on the prototype skips. Looking from above - 

1270279a.jpg 

The couplings intrude into the skip bin. we found when coupling that if loops were left on both ends, the loops could interfere when coupling up. These skips were very light so any interference when coupling up was going to cause problems. 

Now remember that these coal skips are inside framed. This requires a "different approach" to keep the wheels under the skip. Looking underneath

1270287a.jpg 

The Lima couplings and the 7 mm diameter magnet between the axles are obvious. The axles are held captive between styrene blocks that are as deep as the axle diameter by a thin strips of styrene glued to those blocks. These strips act as "keepers" that prevent the wheels from falling out when the skip is lifted from the rails. 

The underneath view also shows indications of the graphite used the axles. As built, these skips wouldn't roll on a 1 in 10 (10%) grade. After the graphite was wafted into the square cavities near the axles and the wheels were given a good spin o bed the graphite powder into the styrene, these skips would roll on a 1 in 40 (2.5%) grade. 

The weak spots with this design were:

  • the wheels - should have been 7mm diameter with 6 spokes. This required us to organise a special run of wheels from a manufacturer, Eventually we got 8 mm diameter with 6 spokes using 1.5  axles as a standard.
  • The couplings - we wanted something less visually intrusive than the Lima's on these Mark I skips. 

But we proved that they would work and the magnets could handle loads of better than twice the design load on the Top End test-rig when we loaded them up with brass swarf..

071a.jpg 

They also proved that using the ramp uncoupler and Lima loop type couplings, by careful placement of the uncoupler ramp, we could "suck" one skip onto the chain, but leave the rest behind in a position that when the next under-track magnet arrived we could repeat the process. - Hands off uncoupling that "ratcheted" the loaded skips one skip length forward, when the first skip departed down the hill.   

That will probably do for the Mark I coal skip,  Mark II coal skip design will be next...

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

The mark II coal skip

 The mark II coal skip

Hi all,

as mentioned above in the Mark I coal skip, we were on the lookout for a better/less-visually-intrusive coupling than those Lima couplings. we were also after something that didn't intrude into the coal bin part of the skip like the Lima did. So, enter the Mark II coal skip with chopper type couplings

316a.jpg 

That's them on the left. There were only 3 of these built by my construction partner Guy Gadsden to test the couplings. They looked nice but couldn't handle the type of curves (sub 12" radius) that we were planning for this layout. Also there was no easy way of remotely uncoupling them without a "big hand from above". Nice idea - but...

The white fabricated styrene skip on the right was an early Mark III skip fitted with a chopper coupler as a possible transition vehicle. More on the Mark III coal skip and its variations next time.  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

The Mark III coal skip.

 The Mark III coal skip

Hi all again,

One of the biggest delays to forward progress was sourcing the "right size wheels" for the coal skips. In true 1/43 scale the skips should have had 7 mm diameter 6-spoke wheels.to match the 12" diameter wheels on the prototype. While we were attempting to source the wheels, we were also looking for a less visually intrusive coupling than the Lima type used on the Mark 1 coal skip.   

The Mark III coal skip still was on 10.6mm diameter wheels and was the first skip variant on which we tried DG couplings from the UK.

1270305a.jpg 

These arrive as an etch-brass fret of 16 couplings. These require separating from the fret and then folding up. The next photo shows a side-on view of a folded coupling with a partially formed striker loop.

MG_9105a.jpg 

As designed and fitted with steel loops, these couplings can be set up for delayed uncoupling using between the track magnets. This wasn't an option for their use on Corrimal, so we went with brass for the loops on our coal skips.  

There were probably only about 6 of these Mark III coal skips made for testing purposes. 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

Just how many skips??? Setting the scene for what comes next

 Just how many skips??? Setting the scene for what comes next

Hi all,

Perhaps, before we go much further with skip design, maybe we ought to look at how many coals skips would be needed, why and how that impacts skip design. This also helps set up some of the economic sub-story behind producing an industrially-based layout like Corrimal. So buckle in, this might be along post because some the stuff here takes a little bit of explaining. It took us a lot of thinking to get our heads around how this layout HAS to operate.

Why the "HAS"?  Because this layout is designed and built around the "operations" of the incline. But its a different type of "operations" than is usually understood in model railroading parlance.

Incline Operations

If comparing some of the more common types of inclines:

%20types.jpg  

What makes the Corrimal layout unique is that is is simulating Type 4 - a continuous-cable, self-acting incline where gravity is providing the motive power on the prototype. In simple terms, this type of an incline is a 2-track incline with one track always "heavy" with loads going downhill and the other track always "light" with the empty skips heading back uphill. The haulage cable is continuous and always runs in one direction and is non-reversible. With the other 3 incline types above, the skips are "at the end" of the haulage cable either as single skip or as a group of skips.

The key visual difference with Corrimal is that individual skips are "dotted" along the haulage cable.  Getting this part of the operation visually correct is at the core of operations on the incline. Remember - this is a public-facing layout rather than a home layout. To give the correct visual impression to the public, you need to have at least 2 skips visible on the haulage cable at all times, moving along the incline. This can be continuously achieved if you pick up a skip at one end of the incline just as you "hand-off" a skip at the other end of that incline track, with another skip mid-transit.  To achieve this you always need a minimum of 6 skips.

As previously discussed in the "Decoupling" posts back on page 6 and 7

Quote:

This brings us to the concept of "decoupling". The loaded model skips must be "decoupled" from the chains driving the Fulls and Empties incline tracks, because like the prototype haulage rope. if the incline was working these under-track chains that stand in for the haulage cables should never stop. But the skip has to stop so that it can be tipped. We needed a way to "decouple" the haulage operations each way from the tipping operation.

The way we did this was to have a "buffer" of 3 loaded coal skips waiting in front of the tipple. As a full skip arrives of the incline, it nudges the 3 parked skips forward. This triggers the tip operation of hauling away and tipping the leading skip, leaving 3 different skips as a new "buffer" until the next full skip arrives off the incline. So now we're up to at least 9 skips.

Remember also that this model is representing a self-acting incline that is powered by a gravity imbalance. No loaded skips ready to go downhill stops the incline. If the incline stops then eventually the mine stops, when all empty skips are filled. This means that we will always need more loaded skips waiting at the top of the hill, so that the incline doesn't stop.  

Mine operations

In simple terms, the role of the tramway, the powered underground haulages and the incline itself on the prototype mine was to transport loaded coal skips to where they could be emptied and then to get the empty skips back to the coalface with a minimum of delay, so that the skips could be reloaded more coal. Ideally you should have spare empty skips so that the miners are kept busy loading coal at the maximum of their abilities. Applying this industrial philosophy to the model and with an initial "designed train length of 11 skips, then just how many skips do we need??

And the number is..  

Using the following plan: 

%20Final.jpg Assuming a full rake of 11 loaded coal skips has just been delivered from the Dead-end module to the incline top on the Top-end module, then the "operational" minimum skip count goes something like this:

  • 3 skips - Fulls Incline - heading downhill loaded
  • 3 skips - Empties incline - heading uphill empty
  • 3 skips - buffer outside tipple on Bottom-end module
  • 1 skip - being tipped or in transit between tipple and the start of the empties Incline
  • 11 skips - at incline top (loaded, just arrived at start of fulls incline)
  • 11 skips - at incline top curving onto Water Tank module (empty, awaiting return to mine)
  • 11 skips - in transit on Brokers Nose to Water Tank module - loaded
  • 11 skips - being loaded underground on U/Ground module (empty/loaded)
  • 11 skips - in the surface exchange sidings on Mine 1 module (empty, just delivered from the incline)

Equals 65 skips so far.

Now given that this is an exhibition layout where you are likely to need some "operational contingencies" to cover skips that might develop problems over a 3-day exhibition operating period, so another train of 11 "spare" skips takes you up to 76 skips as an exhibition operational minimum 

This doesn't allow for any coal skips or skip frames modified for other mine purposes (pit props/ lubricant delivery/ flat cars/ miner transports, etc) used as "scenery" on the non-operational trackage shown in yellow on the plan. We can easily sink another 20 skips as non operational scenic items around the mine or incline top that help tell the story of 1920's coal mining.

So, now we're looking at close on 100 skips that have to be made from scratch or sourced from elsewhere. The cost/unit now becomes a significant influencing factor. Having proven the concept with the fabricated styrene skips, we now had to get smarter about how we made the operational skips.

Enter 3D-printing. Come back next time as we discuss the continuing evolution of model coal skip design,  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

The Mark IV coal skip

 The Mark IV coal skip 

Hi all again,

As said previously, one of the biggest delays to forward progress was sourcing the "right size wheels" for the coal skips. In true 1/43 scale the skips should have had 7 mm diameter 6-spoke wheels.to match the 12" diameter wheels on the prototype. After several false starts and some seriously expensive quotes, eventually we were able to source 8 mm diameter wheels with the correct spoke pattern from the UK. These were set up to use 1.5 mm axles.

So the enter Mark IV coal skip. These were the first skips to use the "correct" sized wheels. The wheels came separately. We then had to work out how to fit the wheels to the axles. Our learning process here resulted in several scrapped wheels and more than a few axles with "slightly wonky" wheels that gave the earlier mine skips a rather prototypical "wobble" as they headed up the tracks. There were a couple of unsuccessful early attempts to build a "drilled" chassis and then fit the wheels to the axles while mounted in the frames. Here's 2 different approaches

Approach 1 - drilled frames to accept a larger diameter cylinder, with the axles running inside the cylinder. This was tried in an attempt to reduce pickup from the tracks. Later we found that this wasn't a valid concern.

1270285a.jpg 

This first variant with steel axles inside a brass cylindrical sleeve didn't roll well, and was difficult to improve the rolling properties by lubrication. As far as I know this one never grew a magnet or couplings - Its rolling performance was THAT bad.  

Approach 2 - Steel axles with a drilled styrene chassis. 

1270286a.jpg 

This variant has grown a magnet for testing on the test rigs, with couplings still to be fitted. But again its rolling properties were better but still not good when compared to the Mark I skip with the fabricated block chassis. The only thing we could put this down to was that this version had a much larger surface area for friction to work on. The steel axles and the proximity of high-powered magnets also created some "unexpected" results on the test rigs.  

Here's what a Mark IV with 8mm diameter wheels looks like underneath after the DG couplings are fitted. This is probably one of the half dozen or so Mark IV's that were used on the Top-End test rig.

MG_9094a.jpg   

We were unsure how much "magnetic grab" we would need on the incline with the new 8 mm diameter wheels, so we shimmed the magnet down from the skip floor. This also shimmed the coupling mounting pads on each end down. Which caused this problem when a Mark IV was placed next to the loco 

MG_9026a.jpg 

 Hmm.. More design refinement required... Back next time when 3D printing makes its first appearance with the Mark V coal skip.   

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
jimfitch

If I wasn't married to a

If I wasn't married to a Brit, I'd have no idea what colliery is.  

 

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
Oztrainz

For the uninitiated..

 For the uninitiated..

Hi Jim and all,

There was an inference to a coal mine in the initial post and its tie to the title of this thread.

 Maybe I ought to go back to that first post and add "In Ozzie speak - colliery = coal mine"??  

Thoughts anyone, before we get back on track to the Mark V coal skip design??

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Ken Rice

Anyone who can’t figure out

Anyone 

Anyone who can’t figure out what a colliery is after reading the first post (which says coal), given that they must already be using a web browser and therefore have a dozen online dictionaries just a google away to tell them, well, they must be pretty unmotived.

I like it - conveys in one word not only what you’re modelling but also that it’s not a US prototype.  If your usename wasn’t OzTrains I might have taken a little longer to figure out it was an Australian prototype rather than somewhere in Great Britain.

Reply 0
lnxlnx

Colliery or mine

Colliery or mine

Given that the word colliery has been around since at least 1625 (first written record), it is surprising that the USA has forgotten it.

I think it is a great term as it differentiates between the mine and the whole of the working area of the business. The colliery is the whole enterprise which is often bigger than the mine and employing more people than just the unlucky ones who toiled underground.

Reply 0
Bernd

Easier rolling skip cars

Easier rolling skip cars

John,

Have been following your skip car design. I noticed when the cars were being pulled by the magnets that at the end of the trip near the release section the cars had a tendency to "jiggle" as the magnet went past the steel axle. Here's my thought. Would either brass or aluminum rod work for your axles? Now comes the big suggestion. To make the cars roll better, have you ever considered adding ball bearings for the axles to roll in? I realize you will have 76 skips and that equates to 304 ball bearings. I use ball bearing races in my locomotive drive designs. Much less friction. Take a look here and see if any would work. http://www.vxb.com/ or you may have something in your country similar to VXB bearing.

Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 0
Oztrainz

The "jiggle", axles, bearings and stuff

  The "jiggle", axles, bearings and stuff

Hi Bernd and all who are still following the skip saga,

As far as the jiggle goes, it's not so much the axles, the later Mark VII skips (still coming - Mark V is about to appear) had brass axles and still jiggled. The jiggle is related to how the direction of the magnetic field between the skip and the under track magnet changes as the chain reaches the end of its run and starts to head around the sprocket. 

This was detected early on (about 2009/2010) when we came up with the idea of magnet haulage. The jiggle also happens when a skip is picked up by a chain at the start of its run. However the layout design and operation is intended to minimise the jiggle.

"Jiggle" management

Looking at each of the inclines individually:

For the Fulls Incline heading downhill;

  • At the top of the hill, the pick up point is very difficult to see from public viewing angles and the remaining loaded skips help to damp out the jiggle when a skip is dragged forward onto the uncoupler ramp. The placement of the uncoupler ramp effectively ratchets the rake of loaded skips forward by a skip length, so that there is a new skip ready to be picked up when the next magnet arrives. The pickup point is under the trestle bridge in the next photo, and hidden from the public by the mound in the left foreground on one side and the retaining wall on the other.  

1230904a.jpg 

  • In front of the tipple house, provided that there is a skip arriving on the tipple chain, the jiggle is absorbed by the decoupling buffer of 3 skips waiting on the deck in front  of the Tipple House. When the skip arrives on the chain, it nudges the 3 waiting skips forward one skip, pushing the right-hand skip onto the uncoupling ramp and triggering the tipple chain.

1240468a.jpg 

If there isn't a skip attached to an arriving magnet, then you will get an obvious jiggle on the left skip as the magnet on the chain heads around the sprocket below the deck

For the tipple chain from the tipple to kickback siding;

  • at the tipple, the loaded skip is sitting uncoupled on the uncoupling ramp as the magnet approaches from below. Any tendency for the skip to jiggle backward toward the approaching magnet is masked by the inertia of the 3 parked skips. 
  • at the kickback siding, the skip is rising steeply on a 1 in 7 (14%) grade, as the magnet starts to around the sprocket hidden under the kickback siding, magnetic attraction is reduced and gravity takes over, the skip then breaks away, thus masking any jiggle 

For the Empties Incline heading uphill;

  • at the downhill pick-up point, which will vary depending on how far each skip rolls downhill from the kickback siding, any jiggle tendency is masked by the foundations for the screens building and parked standard-gauge hoppers, below the screens. The under-track chain surfaces about 1/2 way under the screens building.

_800x600.JPG ​

  • At the uphill end of the Empties Incline

_800x600.JPG 

Bearings, friction on the skips

As far as roller bearings go, I don't think most people appreciate just how small these coal skips actually are and how little room we have underneath them. With 8 mm diameter wheels and 1.5 mm axles there is at best 3mm (1/8") above railhead. If the roller bearing itself was only 3mm or 1/8" thick across the bearing race, then there would be less than 0.5 mm or under 1/16" before you hit the railhead. On straight track this isn't a problem, because the frames are inboard of the rails, but when crossing turnouts it will be a problem with clearances that tight. And we have to fit in haulage cables and dummy rollers between the rails on the inclines themselves.

But sometimes you need a little bit of friction can be good, especially when using a kickback siding on a steep grade. Watch what happens at about 35 seconds in during the following video.

 Now if that skip had roller bearings under it...

Please stay with us until the Mark VII coal skip when how we beat the friction problem will be revealed.   

It's all very carefully stage-crafted "black magic". At no time did my fingers leave my hand 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Bernd

OK, got it

Ok, got it

Ok John. I get it now. I'll stick around till you have it all figured out. Always interesting to see how others solve mechanical problems.

Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 0
Chuck P

Plenty of usage in the US

Plenty of usage in the US

Just around Scranton PA alone, many were named "ABCDEF" Colliery. You better check another online dictionary, @Ken Rice!

HO - Western New York - 1987 era
"When your memories are greater than your dreams, joy will begin to fade."
Reply 0
Ken Rice

Chuck, nothing wrong with the

@Chuck

Chuck, nothing wrong with the online dictionaries, none of them say anything about origin.  I’m going off where I’ve come across the term, which has been primarily in the British context - first came across it in one of the Sherlock Holmes stories.  Don’t recall coming across anything called a colliery over here.  But you’re quite right, I just googled “Colliery Pennsylvania” and it comes up with a bunch of instances.  Fascinating.  You learn something new every day!  

Looks like usage peaked around 1900:

https://books.google.com/ngrams/graph?content=Colliery&year_start=1800&year_end=2000&corpus=15&smoothing=3&share=&direct_url=t1%3B%2CColliery%3B%2Cc0

Reply 0
dwilliam1963

Mom's favorite old film....

Mom's favorite old film...

"How Green Was My Valley" was about Welsh coalminers working in a colliery in the 1860's or so, only reason I knew the word is the late, late show! Directed by John Ford, stars Maureen O'Hara , Walter Pidgeon and a very young Roddy MacDowell.

Reply 0
Marc

Brake

Brake

Also in the way to scratchbuild a rotary coal dumper and a high lift coal dumper in Nscale I found similar trouble when the cars are empty and need to go alone on incline to be redistributed on a small yard for empties.

In fact this kind of yard work like a hump yard, similar to your incline; cars are free rolling on a small incline and go downstairs.

One thing which really fight my feeling is the "supersonic" speed the cars are taking when rolling down.

As small is the grade of the incline, speed is "quickly" out of realistic speed; there are video on You tube  showing real cars rolling free on incline and they roll quiet gently on their ending place.

Mass, gravity but also rail brake are the factors which give this quiet speed.

Mass and gravity are difficult to obtain in our small scale, I forget them.

In miniature, there is a subsequent factor, the need of free rolling cars, brake spring could be added on the wheels but this reduce the length of your trains because of the pulling capacity of your locomotives.

Further,  knowing in this case locomotives run with cars which are really loaded, this really increase the weight of the cars and again reduce the pulling effort of the locomotives; if you brake such cars, you can't achieve realistic train length, or as for me, a minimum of 15 hoppers trains, weight and spring brake wheels are too much together.

I forget to mention cars need to be weighted as a minimum NMRA standard as a base but this is a real light mass.

I have made intensive research how to brake or slow down the speed of the cars on such "small" incline.

David Stewart has made a brake system on his hump yard for his magnificent O scale layout ( http://www.aorailroad.com ) the system was featured in the video of Keith Patterson in MHR one or two months ago.

Yes,  feasable in O scale probably in HO scale, and with difficulties in N scale, even if I try a similar system but I have only 6 millimeters to work with it, and pressure must be extremely light to not derails the cars; a real scientific process, you can imagine ! and also because even all are 33' hopper,  there is  many variations in the design  of the cars.

I have try for myself "rubber rails and tooth brush bristles" inserted between rails.

Rubber rail, are real rubber profile were the car roll on it, they are very small, only 2 mm in length, I put a few here and there on the incline in place of the rails, this is a real  long try and error process but is quiet effective, the rubber comes from parts of Windows car joint cut in small pieces and glued in place of the rails; yes the N scale cars don't crush the small rubber rail, but when rolling on it, the rubber act as a brake because of friction and "gluing action of rubber", yes it's work, but require precision, lot of patience

Tooth brush bristles, are used in many small English layouts were they use miniature mines and loaded cars.

Some bristles need to be inserted between rails on the incline, here and there, again a big try and error process; the bristles are inserted in small holes drilled in the side of the ties between rails to not interfere with couplers; they are cut so they just catch the axle of the cars, it works also but take your time, and don't glue the bristle too fast.....you  need experience.

There is also the  possibility to put several small tubes along the incline and put some pressurized air which make a natural and act as an invisible brake against the car; never see it,  never try it, but lot of reviews on forums.

Seems rubber is the easiest ( not really) way to achieve a relatively well working brake; but yes even fast, you lost the "supersonic speed",  one step forward for sure.

Dave Stewart use rubber pads which comes against the track, animated with a servo to regulate the pressure, but the mass of a O scale cars help to use such design, I'm not sure about it in smaller scale because of derailments, but I try to build such device for N scale, pictures on the way to come.

 

Some time ago, I have try to start a topic about how to do a working brake car systems for hump yard or incline in the MRH forum, but unfortunately, the topic died quiet quickly by missing interest.

May be, these reflexions could help you to design an effective brake system.

Outside the "supersonic speed" this could help to prevent derailments because of such speed, or crash when a car touch at such speed a waiting car on the track and anyway forget the picture of "hot wheels racing cars"

On the run whith my Maclau River RR in Nscale

Reply 0
dark2star

Supersonic cars on incline

Supersonic cars on incline

Hi,

just reading about the too-fast cars going downhill made me think of a toy of my kid: a toy car that has a flywheel inside. And some gears. You push it and it keeps going for a long time. While there is very little space on the underside of the skips (which might not be enough for a flywheel < evil grin> ), it would probably solve the problem elegantly It would also give "mass" to the train...

Anyway, the "tale of the tipple" - or rather incline - is very well written and I keep waiting for the next episode in utter suspension! Thank you!

Have fun.

Reply 0
Oztrainz

Imported miners

  Imported miners

Hi all,

a divergence into some "local" mining history with regional differences. Okay everyone get your Atlas out.

The first European settlement on the Australian east coast was at Sydney in early 1788. Historically, coal-mining in New South Wales (NSW) kicked off near Newcastle on the Hunter river about 100 miles north of Sydney using convicts as labour in the late 1790's. By the early 1800's more coal had been discovered, but the development of coal mining was limited by lack of "skilled" miners. Very few "miners" with coal mining experience had been sent to Australia as "transported" convicts.   

By the 1820's Australia as a "country" didn't exist and NSW colonial jurisdiction was over the eastern 2/3 of the Australian land mass, but was effectively only a couple of small developing colonies/towns dotted along the lower eastern seaboard. Administratively NSW was run by the Colonial Office based in London in the UK. In 1831 the Colonial Office granted The Australian Agricultural Company (AA Co) a monopoly on coal mining in NSW. To get around that shortage of skilled miners, AA Co imported miners from the UK to work their mines in 1840. The majority of these came from Wales with others from northern England and Scotland. This is probably why a lot of the Hunter valley coal mines and the towns around them were named after Welsh locations like Abermain, Ebbw Vale, Rhondda. Cardiff and Swansea to name just a few. Even Captain Cook must have thought that the eastern coast of Australia looked like Wales in the UK when he named it NEW SOUTH Wales after he "bumped into it" in 1770.. 

This monopoly effectively stifled coal mining in other areas of NSW apart from the Newcastle, Hunter River and Port Stevens area until 1847 when the monopoly was rescinded because AA Co couldn't meet local demand and it was claimed to be stifling the growth of the local colonial economy.  Other landowners in other areas of NSW with coal under it had engaged in a pretty successful political campaign waged through the local administration to get the AA Co monopoly rescinded by London. If you want to read more about who did what, when, and where in Newcastle coal mining check out  https://www.newcastle.nsw.gov.au/Newcastle/media/Local-Studies-images/Local-Studies-documents/Coal-Mining-in-Newcastle-1801-1900-edit-2.pdf  The first 2 chapters cover this period that is highly condensed above.

Geologically the coal seams are in a basin that outcrops on the surface near Newcastle in the north, at Coalcliff, north of Wollongong in the south, and near Lithgow in the west. The coal seams are about 2000' deep under Sydney. South of Coalcliff, the coal seams continue to rise above sea level, in the side of the Illawarra Escarpment. Where most of the Newcastle mines were shaft type mines, the mines near Wollongong were largely drift mines with entrances directly into the coal seam from the surface. 

Coal mining in the Illawarra district near Wollongong really got serious once the monopoly was lifted. Companies were floated on the London Stock Exchange to mine the coal reserves near Newcastle initially, then later the Illawarra district and elsewhere in NSW. The Brokers Nose mine above Corrimal got started relatively late in about 1870. By then Newcastle and the Hunter District were a long way in front when in came to getting coal out of the ground and onto ships. The Illawarra district mines tended to attract imported miners from Northern England and Scotland. That and the differences in mining techniques led to some significant differences between the Illawarra and Hunter districts when it came to moving coal on rails. 

So, what's all this got to do with a model of Corrimal Colliery and its incline? It helps to understand why buildings on the surface were laid out the way they were and why the colliery needed a tramway and incline. The mining history of the initial Brokers Nose mine and subsequent Daylight mine help to define this model.         

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

The Mark V coal skip - the "ultimate reality" 3D print

 The Mark V coal skip - the "ultimate reality" 3D print 

Hi all again,

On the previous page, this photo of a rebuilt coal skip appeared:

1000360a.jpg 

This 1:1 scale restoration (including the white-walled tyres) was done by build team member Michael Milway in about 2010. Photos of the coal skips in service reveal that they were nowhere near as "pretty" as this one. Having access to a written description of the skips at Corrimal that listed timber sizes as well as the 1:1 scale survivors, Mike drew up a coal skip using CAD software in early 2012.

Mike models "true" 2' gauge in 7 mm/' or 14 mm gauge, but the Corrimal layout was using 16.5 mm gauge, so he did a 16.5 mm gauge version of the skip drawing as well as his own 14 mm gauge version. Both versions were sent off to Shapeways for printing. Remember - Shapeways and the 3D printing were almost in their infancy back then. So how did the Mark V skip turn out??

From above, after a waft of grey primer

MG_9096a.jpg 

Inside the coal box the metal reinforcing details including bolt-head detail printed just fine. Unfortunately on the outside of the coal box things didn't go quite so well with the vertical markings above the side reinforcements on the lower planks on both sides. 

From underneath, showing all frame timbers and bolt-head details with prototypical 1/2 bearings..

MG_9097a.jpg  

On the prototype skips, the wheels were held in by a piece of bent 1/2" round steel that was coach-bolted to the frame near each bearing, This permitted the wheel to drop slightly in the bearing to allow for track irregularities. this was the only "suspension" that these coal skips had. These pieces of bent round also prevented the axles from falling off when the skip was tipped to empty it. 

Building a model using this method to hold the wheels up using scale-dimensioned materials wasn't going to be strong enough to take impacts transmitted through the axle if an axle kicked as it went through turnouts.

So we now needed a Mark VI coal skip....   

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Ken Rice

Interesting history

Interesting History

Interesting history John, and google maps makes it possible to check out where you’re talking about.  The terrain view makes it very clear why you’d need an incline!  Is the mine I see in Corrimal now in the satellite view the same mine as the one you’re modelling?  I’m guessing the two long structures I see heading for the giant coal pile are conveyors now, rather than trams?

Reply 0
Oztrainz

@Ken

 For Ken

Hi Ken and all, 

That's probably the mine known formerly as South Bulli at Russell Vale . It is currently non-operational. It was the next mine north of Corrimal. All that is left of the Corrimal mine site on the surface now is the concrete foundations where the mine used to be. The site was "remediated" in the early 2000's, as shown in this 2013 photo of what used to be the workshop complex.

1010677a.jpg  How we worked out that this used to be the workshops is another yet-to-be-told story in the Corrimal saga.

The South Bulli mine site is out of sight around the next ridge about 3 to 4 miles further north. It had several inclines (both narrow and standard gauge) over the years before the current conveyor belt. It also had its own fleet of standard gauge locomotives and its own jetty for loading coal into ships. That place had its own interesting history (including a jetty collapse that took some loaded Corrimal standard-gauge wagons to a watery grave - but that's another story for another time)  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Ken Rice

I see the older mine now.

Older mine

I see the older mine now.  So, comparing to some maps I found on a site which among other things links to this very blog, it looks like those buildings are at the top of the 2 foot guage tramway and the new incline?  And the traces of the locations of the tramway, the old incline, and the new incline are faintly visible in the google satellite view as slightly lesser growth in the forest?

Reply 0
Oztrainz

Re: the older mine...(Corrimal)

 Re: the older mine...(Corrimal)

Hi Ken and all,

Well, that effectively derailed getting to the Mark VI skip design next. Oh well, time for another historical diversion.

First off the website for Corrimal Mens Shed mentioned by Ken above -  https://corrimalmensshed.weebly.com/history-of-our-shed.html  You'll need to scroll down about 2/3 of the way to find the section on Corrimal Colliery. On the way past in the "Photos of Corrimal" and "Streets Ice Cream Factory" section the photos of the railway crossing are of the standard-gauge line between the screens (later washery from 1955) and the Corrimal cokeworks site 

A caution - Don't believe everything you read on a website. The maps on the Mens Shed site are indicative at best. And so is this one that I've doctored to help set the scene.

mal_Trax.JPG Legend: (click for a larger version of the "map" above)

Dark Blue Line - 2' gauge tramway between Daylight mine portals and the "old" 2' gauge incline top

Yellow Line - 2' gauge incline. The original Brokers Nose mine portal is uphill of the end of the yellow line. 

This is the section being modelled. The incline closed in 1955 and the screens at the foot of the incline were demolished soon afterwards. 

Red Line - 3'6" gauge incline commissioned in 1955 to a new washery at the lower end.

Light Green Line - Standard-gauge extension to the new washery in 1955.

Light Blue Line - Standard gauge tracks owned by Corrimal Colliery between foot of 2' gauge incline and the cokeworks. Only the portion of standard-gauge track near the screens is being modelled. This track connected to the NSWGR system behind the coke works, just south of Corrimal railway station.

Brown Line - (bottom right corner) the then New South Wales Government Railways (now CityRail) South Coast Line between Sydney in the north and Wollongong/Port Kembla/Bomaderry in the south.    

I'll cover what's in the slideshow on the Mens Shed site next time,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Ken Rice

Sorry, didn't mean to derail

Sorry, didn't mean to derail your planned posts. 

Thanks for the details though, it's interesting stuff!

Reply 0
Reply