Oztrainz

Hi all,

I model a whole transportation system that is operated probably as prototypically as possible based on extensive research and given the technical impossibility of operating this transport system exactly prototyplcally. But for my transportation system there was no TT/TO, track warrant systems, no fixed signals or complicated train management system. Why?

Because the line was operated as "one locomotive in steam" - this meant that there was "nothing to hit" while the only operating locomotive was out there doing its stuff. Trains ran as often as the locomotive and its train could get from one end of the line to the other, and its train was swapped for another train going the other way. 

Is it likely that this layout of a transportation system will make much of an appearance here? So far, based on some of the comments I've received in various previous postings about the method of its build and logic behind how it was built as a sectional layout,  this is probably most unlikely.

After all, this layout is:

  • is based on a  "single industry" pike that hauled coal, a not very glamourous product, 
  • only ran just over a mile on the prototype,
  • only ever had 2 operational steam locomotives at any time in the 50 years of its operational life,
  • was narrow gauge, 
  • was not in the US/Canada,
  • is still small as a model layout in terms of overall footprint when compared to a larger "basement filler" layout
  • has a model train length limited to loco plus 11 small, identical-looking wagons
  • was built using a modified TOMA approach (staged construction of its modules) 
  • was planned for future exhibition use (and I've been told repeatedly here in response to some of  my previous postings that any techniques/approaches used have little or no relevance for a "home build" TOMA-based layout.)
  • probably not of much operational interest because it doesn't use US-based railroading operational practices (because it wasn't in the US? - strange that?)
  • and, was built for a different purpose than a home layout, This layout was built to do more than just "entertain the operators" as perhaps are most home layouts, when the purpose of a home layout is distilled to its essence.

The layout consists of 12 modules and covers a floor area of 23' by 17' (Hmm - starting to get towards a half-way decent sized "basement filler"  layout size). It will not grow any larger, because the logistics of moving and storing a layout of this size that doesn't have a permanent home define the layout size limits.  

Could it grow bigger? Undoubtedly yes. But should it grow bigger? No - this layout is at the limits of what can be easily stored, transported to a venue, speedily set up (in about 1 hour) and speedily dismantled for transport back to storage by a 2 person team.

Any given module can be separated from its neighbours in well under 5 minutes, and, in most cases under 2 minutes if work/running repairs are needed when the layout is together.. When not set up, any module or combination of adjoining modules can be easily pulled from its storage frame to have additional detailing work/running repairs done on it at the workbench. 

So just what did this sectionally-based, phased-build of model coal transportation system end up looking like?

_800x600.JPG 

Yes there is still more to do before this layout is fully exhibition ready, but it is almost there. How much more you see of this layout on here, and the saga of its build, is largely up to yourselves, given what I've listed above this photo,  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 12
Oztrainz

For Keegan - video of the incline in action

 For Keegan - video of the incline in action

Hi Keegan,

As far as I know, no-one has got detailed video of the the whole layout in action yet, not even ourselves.

However Jim Gifford was able to catch us while we were test running the incline itself during the set-up period at the Geelong Australian Narrow Gauge Convention.

 At the time this was shot, the haulage ropes weren't run out on the incline, the tipple house building was down on the standard gauge tracks near the Screens building and not on the tipple deck. We were running empty coal skips to test the circuitry and trackwork. This test running was to ensure that nothing that could prevent running "had moved" during transit during the trip of just over 700 miles (1100 km).  The train operations running between the mine and the incline top has not been recorded (or at least I haven't seen it anywhere)

During this testing we were sending a skip down the "hill" at about every 2 minutes. This is running at about 1/2 maximum capacity for the layout. The next morning we were actually "running coal" with real coal loads in the skips.  

I do have some video that I shot up on YouTube, but I'd prefer to leave their appearance on here until we get to a relevant point to discuss what is happening and why. Those videos will make a whole lot more sense then,.   

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 2
bobcom52

Should be very entertaining

 

Should be very entertaining when it is all up and running John.

regards

 Bob Comerford

Reply 0
Oztrainz

So.. why "a different slant on rails" (Part 1 - The start)

 So.. why "a different slant on rails" (Part 1 - The start)

Hi all again,

So what's all this about a "different slant"? Well we are modelling an incline haulage system that isn't level by any stretch of the imagination, with +20% grades. So, it needs a different approach or "slant" to successfully model something like this that is not your usual model railway.  

But first - So just how did all this get started??

In the beginning:

Way back in October 2005, after a local model railway exhibition, a friend of mine, Guy Gadsden, myself and our wives adjourned to a nearby Macca's (the place of the golden arches) for a post-exhibition "feed" (I suppose you can call it "food"). Guy is a fan of a certain Welsh railway. In conversation, he mentioned that he wanted to build a layout with an incline. We tossed around several ideas about how to make a slate incline railway. But then I asked an innocent question- "What about a model of an Australian incline instead?"  

We did have incline railways in Australia.  And quite a few of them - if you know where to go looking. Australia had incline railways that ranged from common carrier type railways to small industry specific inclines serving mainly the mining and logging industries and in gauges ranging from 2' gauge in industry to standard gauge on inner-city trams. Both Sydney and Melbourne also had extensive cable tram networks that went close to or exceeded San Francisco's in length. 

As the discussion progressed, Corrimal Colliery and its incline was chosen as the target for the model.  After much scribbling on serviettes (napkins), we had a plan. Over several rounds of drinks, the formulation of this plan involved much hilarity from the 4 of us, some odd looks from both patrons and staff (??What are this lot drinking??), and measuring up Macca's with a tape measure. We still have that serviette with its initial mud map of 11 modules. In the end, it was surprising just how close we had kept to that plan.

So why Corrimal? 

Corrimal was one of the best documented colliery railways with at least 1 dedicated book, significant references in at least 2 other books and at least 2 articles in railway historical journals. So perhaps this could give us a "flying start"?

Also Corrimal was a choice that had some significant links to both Guy and myself. In a previous career Guy had worked on a unique 3'6" gauge, 40 tonne bogie diesel-hydraulic underground locomotive built for Corrimal colliery by E.M. Baldwin of Castle Hill NSW. My father was one of the senior Australian Iron & Steel Collieries engineers that wrote the specification for this locomotive. I also had seen the 2' gauge underground haulage in operation, just prior to its closure in the mid-1960's. For a time, I also got to fire "Burra", one of the two preserved steam locomotives that hauled coal from the mine to the top of the incline.  "Burra" is preserved and operational at the Illawarra Light Railway Museum at Albion Park NSW.  

Initial Research

Surely someone somewhere had built a model of this type of an incline? So we went and looked at a lot of online forums, magazines and other resources. Yes there were incline models but none were of the self-acting continuous rope type. After almost 4 years of looking, we were not able to find anyone anywhere who had built this type of an incline with individual skips dotted along the haulage ropes. (Now watch someone come out of the woodwork and claim they built one 15 years ago). All other types of model inclines we have found so far are variations on a theme where one or more wagons are attached to the end of the haulage rope or are placed on a platform that is raised or lowered the length of the incline. That is, there is only a single wagon or a single group of wagons moving over any incline track at any time. 

By mid 2009, it was now very obvious that we were on our own. No-one had got "there" first. 

This small narrow-gauge industrial railway, was only just over a mile long and with a fall of over 300' on the incline itself for the prototype. In exact 1/43 scale this layout would not fit in 2 basketball courts and would be over 10' high. 

If this layout was ever going to be built at all, it was going to require that we did something different and take a very different path for the build process. Remember that "different slant" on the title of this thread?  

Come back next time to see how a "different slant" enabled this layout to be built,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
trainmaster247

Thanks for this is definitely

 

Thanks for this is definitely a really cool project.

23%20(2).JPG 

Reply 0
Oztrainz

So..why "a different slant on rails" (Pt 2 - The WHY)

 So..why "a different slant on rails" (Pt 2 - The WHY)

Hi all again, 

I suppose if you are going to attempt something that hasn't been done before, then you'd better have one or more good reasons WHY you should want to expend the effort of trying to build such a layout. For the Corrimal Colliery Incline layout, these reasons basically boiled down to:

  • Be unique - No-one had done it before. So hopefully this should add to the "marketability" of this layout after it was built when it came to being invited to attend exhibition as an exhibitor sometime in the future. At the time we didn't realise just how many good reasons there were why this type of an incline had not been modelled previously.
  • Be multi-exhibition suitable - Most model railway exhibition layouts are built solely for model railway exhibitions. By taking a slightly different slant, we reckoned that we could build a layout that would also be suitably attractive for local, mining and history functions as well as just model railway exhibitions. This should allow the "exhibitable life" of the layout to be much more fully utilised than by just attending a limited number of model railway exhibitions.
  • Be educational -  to show the process of mining, transporting, and handling coal, as was done historically locally in a "reasonably' prototypical manner.

Now having worked out why we should proceed, we needed to work out HOW we could proceed to build this layout.

Come back next time to see how we tackled the "HOW?"

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

So.. why "a different slant on rails" (Part 3 - The HOW)

 So.. why "a different slant on rails" (Part 3 - The HOW)

Hi all again,

So having decided on the "WHY" being sufficient reason for attempting to make a model of it, how do you actually make a model of it?? To get to a final plan for this layout we decided to do something different. (remember that "different slant"?) Because we were in uncharted waters, we developed a "Build Philosophy" for this layout: 

The Build Philosophy as originally developed back in early 2009 

  1. Proof of Concept Modelling - make cheap test rigs to prove if the concept design will work. This verifies all major processes before any major expenditure is incurred. If we hit an insurmountable showstopper, then the build could be aborted before we'd bought a whole lot of stuff that we couldn't use
  2. Modular light-weight construction - Capral Queblok aluminium square tube for the frames was selected for its lightness, dimensional stability and durability over a long term build process. The original frame dimensions were selected as 1200 mm (4') long by 600 mm (2') wide by 200 mm (8") deep. MDF tops were used to give a solid foundation for mounting mechanisms and structures. Light-weight scenery would be used where possible. 
  3. 1:1 scale drawings were created to see if the planned track would actually fit on the modules
  4. Staged construction - As originally envisaged the layout would consist of 11 modules. These modules would have to be built and detailed in stages
    • Stage 1 - The Incline - 6 modules consisting of Bottom-End, Incline, Top-End, Dead-End, Water Tank and Train Turntable modules.  
    • Stage 2 - Brokers Nose - An additional 3 modules - Mine Run 1, Brokers Nose 1 and Brokers Nose 2 modules, with Mine Run 1 taking over the location of the Train Turntable module and the train turntable module moving to beyond Brokers Nose 2 module  
    • Stage 3 - Corrimal Mine - An additional 2 modules Mine 1 and Mine 2, with the Train Turntable being moved to behind Mine 2 module and rebuilt as an "underground" balloon loop loading point beyond the mine portals. 
  5. Modelling period - has been set between 1923 and 1928, based on initial research of buildings and locomotives known to have been on site.
  6. Selected cameo scenes - where photos of the mine, railway and incline exist, modelled details will "go close" to those shown in the photos.
  7. Rainforest - because of the size of the layout detailed trees and vegetation will be limited to the cameo scenes. This limits the amount of detailed modelling to be done, helps emphasise the cameo scenes, and, hopefully will help to reduce the build duration
  8. Mountain railway - Track height from the incline top to the mine was deliberately set at between 1350 mm (53") to 1400 mm (55") above floor level to give the impression of a railway running through rainforest on  the side of the Illawarra escarpment. Shorter people will be looking up at the layout, as the train shuttles coal skips between the mine and the incline. The Incline itself will appear as an open topped tunnel descending through the trees. 
  9. Brokers Nose - we intend to have a representation of Brokers Nose on top of a pelmet at Stage 2 as both a view-block to prevent the mine and incline being viewed simultaneously, and also as a visual drawcard to differentiate this layout from other exhibits. This design will cause the public to move along the layout to view the full layout. The real Brokers Nose (aka Mount Korrimul) dominates the Illawarra Escarpment near the mine site. The "Nose" was formed when softer underlying shales and coal bands have been eroded leaving  the harder sandstone "beak" exposed. 

MG_8930a.jpg 

But as we are modelling the mid-1920's, that communications tower won't be there.  And there were a lot fewer big trees around.

 

 

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

So..why "a different slant on rails" (Part 4 - Haulage Problems)

 So..why "a different slant on rails" (Part 4 - Haulage Problems)

Hi all again,

By early 2009, after 3 years of scouring magazines and model train forum forums we had been able to find one layout that was "hands-free", that actually managed to get wagons on and off the incline and then towed the wagon the length of the incline with the haulage rope. 

This was the  Benter Colliery Railway built by John Perrett in the UK. to see this incline in action, view the video below from  2:45 to 4:00 in for the incline in exhibition mode. 

But a Benter-type incline had some disadvantages that were insurmountable for us. 

  • It could only handle one skip on the incline at time
  • it only had one track
  • it relied on having a locomotive at the top and bottom of the incline to both spot and haul away wagons from the incline. 
  • The incline haulage rope on this single track incline was reversible 
  • This was not how a self-acting continuous-rope incline like Corrimal was actually operated 

Various mechanical contraptions were tried unsuccessfully over an 18 month period. By early 2009 we'd exhausted our mechanically driven options. The sticking point remained that we didn't have operational 1/43rd scale miners to clip the skips to the rope at the start of the run or to unclip the skips from the rope at the other end of the run along the incline tracks. And even if we did come up with something, we still had a major "showstopper" at the foot of the incline on both tracks.  

The incline tracks at Corrimal were 2 parallel tracks with loaded skips always heading downhill on one track and the empty skips heading back uphill on the other incline track. On the prototype, loaded skips for the top end were fed by pit ponies and the bottom end was hand-worked through the tipple and gravity-worked to the start of the empties incline track. Locomotives feeding individual coal skips was not an option for this type of incline. 

And we had problems getting and maintaining tension on several metres of fine model haulage cable. The insurmountable problem here was "string-lining" of the model haulage ropes on the vertical curve at the bottom of the incline on both tracks. If you put enough tension on the ropes to drive them, then the model ropes "took a shortcut and climbed far higher than the rails, being far lighter than the heavy +2" diameter steel cable used on the prototype,  That amount of this string-lining was far more than enough to derail any skip attached to the rope The following photo demonstrates "string-lining" of the main haulage chains at the bottom of the grade 

1110370a.jpg 

But wait - we haven't got to those haulage chains yet!!!.   

Now it follows that the only way to prevent this "string-lining" from happening to the haulage cable is to hold this haulage cable down. But if you are holding the haulage cables down you can't use those cables to tow a skip fastened somehow to that cable because the "holder downers" are going to foul the link mechanism between the cable and the coal skips at every one of those hold down points.

So we needed to do something different - Remember that "different slant"? 

Come back next time to see how different "different" can get when it comes to moving coal skips on a grade.

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Bernd

Interesting Part

Interesting Part

Now we're getting to the more interesting part, animation. It'll be interesting to see a more in depth description of how it was done. The series has been great reading. Thanks for posting.

Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 0
shoersa

Very interesting...

Very Interesting

Sounds like a challenge for someone with some mechanical talent.  Will be interested in the solution you & crew came up with.  Maybe the reverse of an overhead tramway up a mountain?  Hold the cable down instead of up in some way that will not foul the system.  Definitely a mechanical challenge here!

I am interested in Australian railroads as our grandchilden & family are currently finishing up a 3 week vacation in Australia (Brisbane area).  Am working with the kids on their HO train activities/layout (on the floor now) and fixing their locos (broken pickup wires).  They are definitely intrigued with inclines and have some grades in their layout and have seen the traction problems of locos/trains on grades.

Anyway, thanks for posting and I will be sure to follow along with this thread.

John

Reply 0
Oztrainz

So.. why "a different slant on rails" (Part 5 - "Eureka!!" time)

 So.. why "a different slant on rails" (Part 5 - "Eureka!!" time)

Hi all again,

So just how do you go about beating the string-lining "showstopper" problem at the foot of the "hill"? It would have been SO much easier if we had just quit here. We weren't prepared to call it quits just yet. A lot of ideas were kicked around between the team over phone calls that went well beyond minutes and also during get-togethers for other purposes.

One of the problems with shipping anything anywhere in open top wagons is that there is a very significant visual difference between empty and loaded wagons. And there is no easy way around this "problem" either for our models.

One of the seemingly "silly" ideas was of a kind of "shooting gallery" set up where loaded skips were attached to something that caused them to "bob up" through a hole at the top of the hill and then disappear through a hole at the bottom end of the hill. Likewise there would be a similar set up for empty skips heading the other way uphill. Not only would he have to camouflage the "holes" at both ends of the incline run but eventually we would have to have whole loaded trains from the mine "disappear' when the got to near the incline top, but magically reappear as empty trains heading back to the mine. From this seemingly "silly" idea came the concept of an under-track chain.

The Eureka!! moment - Timeline July 6 2009   

Now just suppose we could find another way of moving the coal skips without fastening them to the haulage cable?? That would get us around the string-lining problem at the foot of the hill. And we could then hold the haulage cables down to prevent them from string-lining while the skips moved along the rails above the haulage cables? 

Now suppose I take the "Under Duck" chain from the shooting galley idea and run it directly under the rails??

Now suppose I somehow attach a magnet to that under-track chain?? 

Now suppose I put another magnet under the wagon??

If I get the the magnet polarities right, perhaps they might attract each other??

What might happen when I pull the chain??

ipmagnet.jpg   

EUREKA!!! We have a possible way of moving coal skips. But will it work?? 

Now for additional bonus points - if we move the coal skip at the same speed as the haulage cable, it just might appear that the haulage cable is doing the work??

Come back next time to see the first part of how we applied the "different slant" Build Philosophy with some "Proof of Concept" modelling that we mentioned in Part 3 at the bottom of the previous page.   

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

So..why "a different slant on rails" (Part 6 - Proof of Concept)

 So..why "a different slant on rails" (Part 6 - Proof of Concept)

Hi all again,

back at the bottom of page 3, the Build Philosophy behind how to build this layout listed a few items including 

Quote:
  1. Proof of Concept Modelling - make cheap test rigs to prove if the concept design will work. This verifies all major processes before any major expenditure is incurred. If we hit an insurmountable showstopper, then the build could be aborted before we'd bought a whole lot of stuff that we couldn't use

So what were our initial major processes??

  • moving skips on the incline
  • getting single skips reliably onto the incline without using a locomotive to shunt individual skips
  • running multiple skips on an incline track, but dotted as single skips along the incline
  • running skips on close parallel tracks without magnets or skips interfering
  • making an operational haulage cable
  • designing a reliable "tipper-outer" for the tipple
  • designing a reliable inside-bearing coal skip that  would roll reliably, couple or uncouple on demand and be robust enough to be tipped at the tipple using actual coal loads 

After achieving these processes, running the trains of skips along a single track between the mine and incline top through Aussie bush scenery should be the easy bit?? No?? 

So on to test rigs - Each of the test rigs we built had a different aim. Many of them were later adapted and used for testing different processes than they were initially built for. The aim was to build cheap, so on-hand equipment and materials were adapted and offcuts of materials were used where possible. These test rigs had to be robust enough to be handled yet open enough to show where the problems were occurring. These test rigs need not necessarily be throw-aways, but they didn't have to look pretty either. So construction was simple, basic and fast once we'd worked out what we wanted to test.

Remember the aim of these test rigs is to expose problems so that they can be worked through or defined as a "show stopper" The "show stopper" is a problem that is of sufficient magnitude to place the whole of the project in jeopardy. The planned layout cannot be built or operated as planned, So you either come up with a new plan to get around the "show stopper" that will almost certainly involve compromising appearance/operations (both??), or you walk away and go do something else.

I'll cover each of the test rigs in separate posts.    

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

So..why "a different slant on rails" (Pt 7 - Test Rig #1)

 So..why "a different slant on rails" (Pt 7 - Test Rig #1)

Hi all,

Having had the Eureka moment, now we had to test it to see if it worked. So we came up with the idea of building test rigs to prove the various processes listed in the previous post.

Test Rig #1 - magnetic haulage test rig - Timeline August 16 2009

inetest1.jpg 

This test rig was built on a scrap offcut of MDF. The green box at the left is a Fleischmann transformer/controller that I've had for years.  The red/grey cylinder is a gearhead reduction motor that I had purchased previously for another modelling project. It was too big to fit under the test track so the sprocket and chain transmission was used to power the sprocket under the track The chain and sprocket were from the Tamiya Educational range (Part #70142 Ladder Chain and Sprocket Set)  The track was supported on a strip of 0.030" styrene and foamcore support piers secured with hotglue.

The magnets were sourced through Jaycar, a local electrical/electronics supplier. One 10mm diameter neodium magnet is attached to the chain with superglue. This magnet is to the right of the under-track chain on the lower level. There is a smaller ferrite magnet under the bogie on the test track. The only new cost for this test rig was the Tamiya ladder chain and sprockets. Total cost so far was under $A40.

The next photo shows the magnet on the chain passing around the sprocket on the way towards the bogie

inetest2.jpg 

Can anyone spot a future problem in this photo? If not I'll tell you all about it next time. 

And the bogie being hauled by the magnet on the chain

ineTest3.jpg 

Notice that the chain has lifted and the magnet is now firmly against the under-surface of the styrene strip supporting the track.  

Video of the test rig in action

I suppose next time we should have something that looks more like coal skips?

Verdict - A successful test of magnetic haulage. This might just actually work..

Next up, the Bi-Di Test Rig #2,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

So..why "a different slant on rails" (Part 8 - Test Rig #2)

 So..why "a different slant on rails" (Part 8 - Test Rig #2)

Hi all

this bi-directional test rig was designed and built to test if passing skips and magnets on each track would interfere with each other. 

Timeline early October 2009

CAUTION: - Turn your sound down when viewing the video. The 3V Tamiya motor/gearbox combination units are noisy.  

This test rig was later modified with a winch drum to test if it was possible to make a proper continuous-rope haulage, where the rope was driven between the rails for the length of this test rig. Some of the rollers to support the haulage rope can be seen between the rails. 

Verdict

  1. Moving skips along the incline track - Pass
  2. Moving more than one skip simultaneously on each track - Pass
  3. Magnetic interference between passing skips at 60mm track spacing - Pass no obvious magnetic interference observed
  4. Making an operational continuous-rope haulage system - Fail ,.

The Haulage Rope testing saga

After almost 6 month's worth of testing various materials of various thicknesses we were able to get the rope speed to match the skip's speed for about 15 seconds. Then the rope jammed and shredded the winch drive system.

Even at this early design stage we realised that if we couldn't get this short test rig to work successfully for a continuous haulage rope, then we had no chance of getting several metres of thin ?? cable moving and tensioned reliably when it came time to actually build the incline modules. These problems were further aggravated by the haulage rope having to dodge the undertrack chain paths and the chain operating mechanisms under both incline tracks.

On this test rig, the rope had to handle curves down to 3mm (1/8") radius to get the rope into and out from the centre of the tracks at each end of the run on each track. An additional complication was that the rope path had to be easily threaded and dismantled because it crossed 2 module joints on both tracks. The splice in the rope had to be flexible enough to handle these curves yet be strong enough to handle the tension required to drive the rope.

The Work Around.

Given that the planned viewing distance for the public  at an exhibition was to be about a metre away from the haulage ropes, it became obvious with this test rig that from about a metre away we couldn't tell if the haulage rope was moving or not. So the haulage rope became "non-operational scenery" that had to be laid out across the 3 modules on each track.

_800x600.JPG 

The lengths of haulage rope on each track will become a consumable that will be scrapped after each exhibition and new lengths will run out at the next exhibition. With a a roll of 100 metres of suitable "rope" now sorted, the 4 or 5 metres expended each exhibition isn't going to worry us anytime soon.  

We're still a long way away from that last photo above yet. This test rig was set up for testing on the flat.

Come back next time to see what happens when we have to pull a grade with Test Rig #3, . 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Bernd

The mechanism

The mechanism

John,

Now you're getting to what I think is the most interesting part, the animation. One thing I noticed in the test of skips was when the magnet picked up the skip how it oscillated back and forth before settling down. Other than that great work.

Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 0
Oztrainz

The shuffle

 The shuffle

Hi Bernd,

There is not much we can do about the cause of the shuffle. The best reasoning I can come up for it is that the shape and orientation of the magnetic field generated by the bigger magnet on the chain is changing relative to the magnet on the skip as the magnet on the chain comes around the sprocket. There is a change of 90-degrees in field orientation in a short distance. I have just gone back and looked at one of my postings on the Gnatterbox Gn15 forum. By mid-December 2009  test rig experience on this and other test rigs yet to come on this forum can be summed up as 

Quote:

The wagon shudder in the videos can be prevented if the magnet on the wagon is placed between 1 and 3 sleeper spacings OUTSIDE of where the chain comes up on the sprocket. The wagons shown in the videos are very free rolling (built on needlepoint bearing HO bogies). More friction in the wagon will also help reduce the shudder 
More testing continues....

 Some other options that we finally went with on the final build were:

1 - to hide the pickup point. At the top of the hill the pickup point on the lower level is hidden from public view behind this hill in the bottom left of this photo 

_800x600.JPG 

So at the top of the hill, the first thing the public will see is a loaded coal skip emerging from behind this vegetated view-block, rolling along the track as if "by magic".

At the bottom of the hill, the pickup point is camouflaged by the Screens building and the standard gauge wagons under and around the Screens

_800x600.JPG 

The Empties incline chain comes back up under the track at about where the timber diagonal supports meet under the Screens.

2 - coupling other skips to the skip that is being picked up. This gets into skip design and coupling choice and with 8 iterations of skip design still to be described, there is a fair bit to getting this right. But in simple terms, the rolling resistance of the extra skips damp the shuffle. The final skip design with inside bearings doesn't roll anywhere as easily as the needlepoint-fitted bogies and skips used in these first 2 test rigs. . 

Moving coal skips on the incline is "black magic" It's all an illusion, but a pretty well thought out one -
At no time did my fingers ever leave my hand 

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

So..why "a different slant on rails" (Pt 9 - Steep Test Rig #3)

 So..why "a different slant on rails" (Pt 9 - Steep Test Rig #3)

Hi all,

This test rig was designed to test if magnetic haulage could be successful on a steep grade. It is a single track and is designed so that the chain can be run in either direction so that both uphill and downhill performance could be tested.

The grade is approximately 1 in 1, 100% or 45 degrees. In the real world, grades this steep are approaching the limit of rack adhesion capability and are more usually hauled by fixed cables attached to the vehicle being moved on the grade. The test rig grade is twice as steep as that envisaged for the future layout. This was done to hopefully give us a significant safety margin when it came to running the incline part of the layout after it was built.

Construction was with foamcore and hot glue. The skips in this incline were borrowed from a friend, but are the correct scale size for 2' gauge coal skips as used at the Corrimal mine. Although the video is with empty skips, later tests were done with loads of various materials. Later designs of coal skips were also tested on this incline. 

Just because this is a test rig does not necessarily mean that such test rigs should be considered as short-term "chainsaw" (I really dislike that term) or throw-away models. This particular test rig was invaluable after this video in helping us to firm up our designs for the coal skips and coupling systems to be used on the future layout. It also helped to verify the likely performance of the skip designs on a grade. This foamcore test rig is still in existence 8 years after it was built. This particular test rig has been used several times in presentations about the Corrimal Incline to demonstrate the concepts behind the model incline. 

Timeline - Early December 2009

Now to the video. CAUTION: Turn the sound down before playing. The way the motor was mounted turned the test rig into a resonating board. This test-rig used the same 3V Tamiya motor/gearbox combination unit as the previous test rig.

Verdict 

  1. Move single skips on a steep grade - Pass - for both loaded and unloaded skips moving in both directions.
  2. Move multiple skips onto the incline so that only 1 skip is picked up - Pass - but was later modified to suit the couplings chosen for the skip designs
  3. Move skips off the incline at the end of the run - Pass - the slight down hill run at the bottom helps. At the top of the arriving skips will push previously parked skips uphill. This is important for the next test rig.

Learnings

  • The concept of magnet haulage on the steep part of the incline was proven with this test rig. This enabled work to progress on designing the track layout at the top and bottom of the incline. 
  • You need to get the magnet on the skip as close as possible to the magnet on the chain. Although the actual equation for magnetic attraction is logarithmic, in simple terms if you double the distance between the 2 magnets you only get about 1/4 of the attractive force that you had previously when the magnets were closer together.
  • The points on the sprockets need to be "de-pointed", so that the teeth on the sprocket do not protrude enough to push the magnet off the chain
  • the chain needed additional support under the track to prevent the weight of the chain from breaking the magnetic bond. When the incline part of the layout was built, aluminium channel was used to support the chain under the track. 
  • The skips used in the video used prototypical 3-link chain between and hook couplings on each skip. This type of a coupling was never going to be option for "hands-free" operation of the incline part of the layout.
  • The skips were borrowed. We needed to come up with our own skips and our own skip design that could be run "hands free" on the incline. This test rig would later be used to test loaded and unloaded performance of these skip designs. 

That'll do for this post - next up Test Rig #4 the Top End.  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

So..Why "a different slant on rails"(Pt 10 - Top-End Testrig #4)

 So..Why "a different slant on rails"(Pt 10 - Top-End Test rig #4)

Hi all again

So, having proved we could move loads on a grade twice as steep as we planned, this proved that it was feasible to proceed to the next stage of the design process. The idea of making the Corrimal Colliery Incline as a layout had survived - So far...4 years after having the initial idea.  

Making the middle part of the incline is really the easy bit of the model incline (if anything could be said to be easy on an incline)   

This next stage was flesh out the design concept even further by making an operational prototype with no scenery for each end of the incline. We decided to tackle the Top-End of the incline first with another test rig. This was to be a testbed for

  • chain operation verification 
  • wagon management testing
  • coal skip design and testing
  • coupler operation testing
  • track fabrication techniques (vertical curves, etc)
  • initial scenery visualisation 

Now it was time to see if we could actually make our desired track layout. 

TopEnd1a.jpg  Time line about mid 2010  

The Mark 1 skip design had been finalised using an all-styrene fabricated design, Lima hook-and-loop couplings and some cheap 10.6mm diameter wheels.. This skip design had been then tested on the #2 and #3 test rigs. The motor off the earlier #1 test rig became one of the motors on the new #4 Top-End test rig. This was a foamcore base structure to test the proposed track layout and the performance of the skips and magnet chains. 

We built about a dozen skips for testing purposes  Here they are in action. Caution: please turn your sound down before viewing - we're still using the Tamiya 3v motor/gearbox units 

 
The track ends just out of shot to the right with vertical pieces of foamcore hot glued across both tracks as a very solid "Stop Here". 
 
The following photo shows the fabricated ramp uncoupler and where skips stop at the pick-up point, awaiting the next magnet on the chain to arrive.
 
068a.jpg 
 
That ought to do for the design and fabrication of The Top-End Test Rig #4,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

Test Rig vs Mock-up

 Test Rig vs Mock-up

Hi all again,

For the Bottom-End of the incline a mock-up was made of the track layout and the main structures using foamcore.

218a.jpg 

And as viewed from the other end.

231a.jpg 

Question - What's the difference between a mock-up and a test-rig??

Answer - by my definitions:

A mock-up is built to determine "the look" of what might be. It helps to determine the sizes of structures, track layouts and visual sight-lines from various places with mock-up. A mock-up can be built cheaply quickly and from materials as basic as old cereal boxes or foamcore off-cuts, stitched together with hot glue or sticky tape. These mock-ups can also serve as placeholders on the layout until more detailed structures can be built. 

A Test-rig is built to test the operation of some part(s) of a proposed layout. A well thought out test-rig can be used to test different things, so that one test-rig can be a really useful tool for evaluating your thought processes as well as the operational processes of a proposed layout. 

Eventually both mock-up and test-rig may end up in the scrap bin, but I'd argue that build quality should be pretty good. especially for the test-rigs. A test rig can also test materials and construction techniques as well as operations. If you can build a test rig such that the critical parts of your proposed layout are built as a test-rig using the same materials as you plan to use for your layout. Then any material deficiencies found in the test rig should be able to be avoided when it comes time to build that part of the layout for real. 

That'll do for now, Next time aluminium module frames, and why.

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
bobcom52

still watching

Still watching

Hi John, still watching your progress.

I suspect the RMWeb 7mm crowd would like to see your work too. Plenty of active O gauge modellers inhabit that site.

cheers

 Bob

Reply 0
Oztrainz

Aluminium module frames and why

 Aluminium module frames and why

Hi all again,

Why aluminium frames?

There has been considerable experience gained over many years in Australia with exhibition layouts using aluminium frames. This method of module framing has provided a lightweight, dimensionally-stable base for building both modular and sectional layouts upon. Some examples were quoted by Professor Klyzlr in his 

"Aluminium & Foamcore" posting - I'll repeat them here

The last mentioned Yallah layout is mine - it was built back in 2005 and is still dimensionally stable and capable of running trains at less than 1/2 hours notice - 12 years after it was built. The experience with aluminium framing for model railways is not some recent "discovery". In Australia we've leaned a lot about how to use its strong points and avoid its weaknesses. 

The Corrimal Colliery Incline layout is built on the experience of others who have gone before, plus we've tried a few things that others haven't yet as well.  

Timeframe September 2010 - purchasing the framing

Up to September 2010, all we'd built had been a series of test rigs, but the results of the test rig looked like we might be on a winner and that this layout might just be feasible using magnetic haulage to stand-in for the prototype's cable haulage. So it was time to build some frames. Previous experience with other layouts already being exhibited successfully in Australia, suggested aluminium was a possible way forward with module framing.

Plus I had another advantage. My construction partner Guy was an experienced fabricator, used to working with metals and he had some tools that would make our fabrication job easier.

We put together a very basic Excel spreadsheet that enabled us to calculate the total number of 6.5 metre lengths and the number and type of joiner pieces required for the whole layout to Stage 3 then added a "guesstimate" for contingencies and for wastage where the cut lengths don't match the supplied length evenly. 

Big Box vs Metal Supplier

There were 3 main ways of purchasing the aluminium RHS tube we used for the module frames in Australia:

  • in 6.5 metre lengths from a metal supplier, but you have to cut it to the required lengths yourself.
  • in 6.5 metre lengths from a metal supplier, cut to length by the supplier at extra cost.
  • in shorter pre-cut lengths from a big-box hardware store, but some cutting is still required for the shorter vertical supports at each corner. 

For a standard 1200mm long  by 600mm wide by 200mm deep module, the pre-cut option from the big box store was costed at just over A$60/module. The longer lengths from a metal supplier at retail prices were costed at about A$40/module, but finished at about A$36/module when we earned a quantity discount by buying enough aluminium RHS lengths for all modules planned plus some contingency. This deviates from the "standard" TOMA approach where supposedly you only buy materials as you need them. However the extra savings and the ability to store aluminium lengths without deterioration more than justify the deviation from "standard TOMA".  

So having purchased aluminium lengths and connectors, It was time to start fabricating the frames. That's enough words for now, next time construction starts in earnest with frame fabrication.

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

Frame fabrication

 Frame fabrication

Hi all 

It is amazing what can be done with a good chop saw fitted with an aluminium blade. You end up with many more smaller pieces of aluminium. When you select the right ones for the job and add some end connectors, you get this module frame that is ready to be bumped home

MG_1274a.jpg 

Note the two 4-way connectors on the right-hand side. The vertical prong on the top allows a backscene to be fitted later.

Bumping the connectors home with a soft-headed hammer

MG_1282a.jpg 

About 3 hours work, at the most - 6 modules each 1200 mm (4') long by 600mm (2') wide by 200mm (8") deep

MG_1284a.jpg  

Some of the modules were fitted with lipped tube for those module that were planned to be fitted with control panels

MG_1283a.jpg 

The incline frame was next - setting up for a 25% or 1 in 4 grade.MG_1286a.jpg 

As built - the lower end splice-plate details. This ensures that the lower joint remains rigid after the plastic joiners were modified.

MG_1296a.jpg 

and the upper end splice-plate details

MG_1297a.jpg 

OK so now it's time to link some of these up - In my "Staged Layout Construction (TOMA Almost)" posting back on Page 2  I wrote: 

Quote:

OK so that was the plan. Much has been/is currently being said about the flexibility of the TOMA approach of staged layout construction. Come back next time to see how this flexibility was used and what was repurposed or changed as we went along and the rubber hit the road. 

Well, now the rubber starts to hit the road..."Next time" has arrived.

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Oztrainz

No battle plan ever remains unchanged....CONTACT #1

 No battle plan ever remains unchanged....CONTACT #1

Hi all again, 

So we had our stack of frames and a 1:1 scale plan of how we thought the modules should go together. 

Helmuth von Moltke or some other military analyst was quoted as saying something like "No plan of operations extends with any certainty beyond the first contact with the main hostile force" (ie "No battle plan (dream layout) ever survives first contact with the enemy (reality)" - loosely translated from the original German ). He wasn't too far wrong. 

Reality "bites" when the constraints of 

  • space 
  • time
  • money
  • weight (this is a planned portable layout)
  • storage (this layout doesn't have a permanent home where it can be set up for long periods)
  • technology (when you push the envelope, you really should know where the edge is)
  • physics (remember "the technical impossibility of operating this transport system exactly prototypically" from Post 1? - More on this one later, it is far more than just using electric motors in small steam locomotive boilers}

all come home to roost when construction starts. 

Contact 1

Photo 1 - the module layout as originally planned, laid out on the ground  From left-to-right  (front row - Tipple, Incline (missing), Top End, Dead End - rear row - Train Turntable (at 90 degrees) Mine Run 1, Water Tank modules) One of the things that gives a sectional layout its structural rigidity is that the modules are linked to each other.. 

-750x563.jpg 

The 1' plus height difference at the lower left end of the missing Incline module and the higher level two left rear modules meant that the two rear modules could not be linked to another module.   

 

Photo 2 - Shows the module/sections propped up with the Incline module installed. This is when we discovered the height difference problem, with no way of supporting the rear left module shown in the first photo.

IMG_1303.jpg 

 

Photo 3- here's how it was finally built. We had a lot to learn before we got to here - almost 2 years later (and still no tracks laid. 

-750x563.jpg 

 

So why the change in orientation?? On the prototype the track plan schematically looked like this:

TopEnd1a.jpg 

But with the incline leg slanted at about 140 degrees rather than the 90 degrees shown in the sketch above. The Top End tracks were curved as well with some significant wiggles.  So the original plan with the Top-End module parallel to the incline was "reasonably close" to the prototype's trackplan. But when we found the height mismatch, the prototype's track layout was frankly unobtainable and not structurally sound when transferred to modules, so we changed the trackplan.- even before any track was laid.  

TOMA Flexibility (Example 1) 

For a "sectional" approach the only requirement is that the track lines up across a specific module joint. Now if the design changes with "sectional approach", then some rework near the join will be required, BUT the whole module/structures/scenery will need far less rework than for a monolithic one-piece design approach where "some serious chainsaw-type surgery" is required to change the structural footprint of the layout.

Even at bare frame level, it was a whole lot easier to significantly change the layout's footprint with separate modules than if we'd started to build this as one lump. At this stage we hadn't had to modify of the frames we'd built, just the way they fitted together.  

 But that was about to change. General von Moltke wasn't done with us yet. He was only getting started.  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Bernd

Aluminum Frame

Aluminum Frame

That's a pretty neat idea using extruded aluminum for portable modular construction. Something to look into.

Bernd

New York, Vermont & Northern Rwy. - Route of the Black Diamonds - NCSWIC

BLOG: The Kingstone Model Works Shop - the MRH Forum

Reply 0
Oztrainz

Re: Aluminium frames - for US readers

 Re: Aluminium frames - for US readers

Hi Bernd and all,

For those readers in the US, Professor Klyzlr has done the research for aluminium framing products similar to what we are using in Australia. In his "Apartment Benchwork" posting at https://forum.mrhmag.com/post/bench-work-recommendations-12207486 he wrote:

Thanks for doing the leg-work Prof,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Oztrainz

No battle plan ever remains unchanged....CONTACT #2

 No battle plan ever remains unchanged....CONTACT #2

Hi all again,

As posted previously by me -

Quote:

"No battle plan (dream layout) ever survives first contact with the enemy (reality)"

Here's the saga of the second skirmish.. Read on if you are game.. You might be here for a while while this one is explained.

So we had a Top-End test-rig, Bottom end mock-up and some module frames (Yeah we'd just built them) So what happens when you put them all together?

Looking from the top of the hill down the incline

287a.jpg 

and found out that our grades didn't line up all that well when we used the aluminium channel as a straight edge. But it gave us some idea of how things might start to come together.

We also found out that our tipple building on the mock-up with its short deck and 'ski-jump" start to the incline

293a.jpg 

just didn't look "right" when compared to a prototype photo we'd found because the deck was too short and the tipple building was too compressed.

294a.jpg 

The white foamcore slab in front of the photo was marked up with various length decks. Looking at various options, the easiest way forward was to build a new, longer module frame.

Given that the tipple house and screens were demolished in 1955 and no plans were known to exist, the dimensions of the tipple house were estimated off pier spacing on the deck and the weatherboards on the side of the building in the phot. An extra 200 mm of frame gave us a longer deck but pushed the start of the grade back onto the incline module and as a knock-on effect, steepened the grade on the incline to better than 25%. Our #3 Steep Grade test-rig proved we could handle 50%, so the increased grade was an acceptable compromise, even though it reduced the visual length of the grade. After all, this layout was all about the incline, could we "live with" a shorter but steeper incline?  

So we built another foamcore mock-up of the tipple building with its new extended deck on the new 1400 mm long module 

296a.jpg 

The Bottom-End was now starting to look like the prototype. The single vertical off-cut represented a vertical boiler known to have been on site and the other off-cuts represented a store? building also known to have been on site

We then printed and laid out the standard-gauge tracks using printed templates. Where's the double-slip??  

301a.jpg 

Oh there it is, well clear of any module joints. But unknown to us, these standard gauge tracks were the start of the next skirmish.

The previous 1200 mm long module frame simply became a Stage 2 module frame, the first of 3 more required in the original plan for that stage. It didn't take up much space in storage and could sit in storage without deterioration until we were ready for it. 

Remember that bit about "TOMA flexibility" for a modular/sectional layout? So far we'd had 4 footprint changes and hadn't laid a track yet. At just on 5 years after deciding that building the Corrimal Colliery and its Incline would be the "ideal subject" for a model of an Aussie incline. Come back next time for the next "plan vs reality" skirmish.      

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Reply