To begin with I am not a computer geek who has ever learned how to manipulate computer track plan softwares. And to tell the truth I never thought it was an idea worthy of extensive study to learn just to singularly design my new layout. I really thought (hoped) that someone would come along and do that computer designing/visualizing for me,....someone who enjoyed doing that sort of thing.
 

Long story short I had to resort to scale drawings / sketches. These can be a little tricky to get 'exactly' to scale, particularly with the variety of turnout brands, and subtle variations in their exact profiles.

 

Paper templates of the turnouts was suggested (these were full size). I also had a good number of the actual turnouts themselves, and some fixed pieces of Atlas sectional track I could use to double check that I was getting a good close fit, and the proper angles.
 

I had a 4x8 sheet of plywood set up as a work table out in my carport. I thought why not lay some drawing paper out on the sheet of plywood and draw up some of the various areas of my trackplan. A contractor friend had an old roll of brown paper that is used to protect new flooring etc during building construction. And it happened to be 4 foot wide.

 

I now lay 4x8 foot pieces of that paper out on my BIG drawing table, and do an exact full size plans of my trackplan for various areas and corners of my layout. I plan on using these patterns to lay down the track on my double decks of the actual layout. Additionally I can simply roll these paper plans up and put them inside during windy or inclement weather,
 

I am actually having FUN creating these full size plans, and I am learning somethings about planning concentric curves, fitting in structures, tight tolerances etc, etc.

 

 

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Staging Tracks in that Corner

Today I made the tracing of the staging tracks in that corner of the room to the right of the entrance to the shed. As mentioned before I now have 6 staging tracks down each side. When they arrive at the entrance to the shed I have decided to only have the 3 outer tracks pass over a bridge to make an entire loop of the room. The next 2 tracks inboard will make the turn at this end, but end just prior to the 36 wide entrance. The most inner track will end in a straight manner.
DSCF3328.JPG 

 

DSCF3327.JPG 

 

DSCF3329.JPG 

That staging yard tracing can be flipped over and used as a pattern for the other opposite corner on the left hand side.

A word about my bridge across the entrance might be in order here. The 'bridge' will be a rectangular framed structure that will be hinged around a bar across its upper edge that's mounted to the inner shed wall above the door. This rectangular frame will pivot about that bar such as to swing up towards the ceiling and get hooked there for clearing the doorway.

All three bridges, upper level, main level, and staging level will be built into this rectangular frame. Of course the upper 2 are 'fake bridges', of different style and set against their own individual backdrops. Its all mounted on one frame that pivots up to the ceiling with entering and leaving the train shed. Both of the upper bridges are double tracked for their 2 mainlines. The staging track bridge will be 3 tracks wide and camouflaged somehow.

Reply 0
ctxmf74

"All three bridges, upper

Quote:

"All three bridges, upper level, main level, and staging level will be built into this rectangular frame. Of course the upper 2 are 'fake bridges', of different style and set against their own individual backdrops. Its all mounted on one frame that pivots up to the ceiling with entering and leaving the train shed. Both of the upper bridges are double tracked for their 2 mainlines. The staging track bridge will be 3 tracks wide and camouflaged somehow."

 
 

   Have you worked out the geometry of the lift section to figure out what slope the closing edge will need to let three levels raise and lower? For my single level lift bridge I had to set the hinge pins a bit inboard of the joint to get the bridge to clear the rails as it raised. A 3 level lift section seems like it would need a  more refined  shape and hinge location than a one level bridge. ...DaveB   

Reply 0
railandsail

Entranceway Bridges

 

No I have not set down and figured out the details of this lifting bridge arrangement yet.

I was looking for an image that might help explain what I have in mind but didn't come up with a good one yet. Do you know what a Murphy bed is? What I have in mind is somewhat akin to that, but it will hinge at the upper level and 'fold up' to the ceiling rather than down to the floor.

It would be like taking a flat piece of plywood 36" wide, and approx 38" tall, and hanging it vertically over the my sheds entrance via a 36" piano hinge along its top. Then attach the 3 bridges by glueing one of their sides to the flat piece of plywood (sort of like 3 small shelves deep enough to hold 2-3 tracks across them).

This would piece of plywood with the bridge structures stuck on like shelves would be hanging vertical when the trains were operating, and would hinge up to the ceiling when entering/exiting the shed.

There would need to be a slight taper to the depth of the shelves (and tracks mounted on those shelves) to facilitate the the swinging motion of the flat panel of plywood.

Probably need to draw a diagram, and move this conversation over here,..
https://forum.mrhmag.com/post/layout-room-entrance-swingdown-bridges-3-of-them-in-combo-12210684

Reply 0
railandsail

Left Hand Corner Mock Up

Today I only had a very short time to play around with the full scale planning. I chose to look at the track plan of the lower left corner of the shed,....down from the freight yard, and containing the steel mill.

 

First I drew in the two concentric mainlines in pencil. They are slightly different than the right hand corner, so I couldn't use my mirror image tracing idea. They are the same 30” outer radius, 29” inner radius.

This first image would be as one was looking towards that lower corner from Balt city corner. The track along the edge (wall, right edge of photo) would be the track that is bringing the trains up from the helix/staging level. It eventually joins that outer mainline via a left hand med size Peco into a double curved Peco (30”-60”r) on the mainline (makes for pretty broad curves).

Next inboard are the 2 mainlines with a Shinohara double crossover included there. This double crossover will provide for reversing trains around on the layout's mainlines. It will also provide for getting big steam engines from the roundhouse area over to head up certain trains brought up topsides from the staging tracks by diesel workhorses. (possible that many of the steamers will NOT have to drag their trains up the helix from staging, but rather will be able to join their consist topsides).

There is another Peco double curve on the inner mainline that allows diesel engines that have refueled/serviced on those 2 inner freight yard tracks to enter back into the mainlines.
DSCF3336.JPG 


There may be a spur off of that helix service track to something in that coffin corner outside of the big curves. I threw in some sample trackage, ….just in case?
DSCF3333.JPG 

Reply 0
railandsail

Left Hand Corner & New Steel

Left Hand Corner & New Steel Idea
 

I did a bit more planing of the track plan in that left hand corner and taped some paper templates in place of the actual turnouts originally set there to make the plan. Had to do a little modification to the original curved INNER mainline there, to give me the bigger clearance between the mainlines that are entering the big curve there . I wanted a larger separation there after they arrived there from their 2”CL up along the left wall. I also needed to blend in the Peco double curve turnout I placed there.
DSCF3356.JPG 

 

 

Now over to the steel mill portion of that corner of the layout. I really don't know what I will finally do here, but here is my newest idea. I will NOT utilize the electric furnace, but basically stick with the blast furnace and rolling mill, and rearranged thusly.
l%20idea.jpg 

 

 

Here is how I quickly laid out the track there.
DSCF3361.JPG 

My basic condensed version assumes the Rolling Mill assumes two roles,...accepts molten metal from the blast furnace, and turns it into basic shapes it ships out on the other end??

 

NOTE: I think that mirror I show at the end of the blast furnace should make that scene appear much deeper,...and hide the dble mainline behind it.??

 

 

Reply 0
railandsail

Fooling around with coffin corner on the left

Had a few moments today to play around with an idea for the coffin corner there on the left...

Quote:

As mentioned before I was able to fit the Madusa cement structure into the very corner on the right hand side. I've been wondering what I might fit into that left hand corner? There are a few pencil scribbles on that tracing paper for one idea I might consider,...a diesel engine maintenance building (likely just cut off front half of the structure), and several tracks for parked diesels waiting for service. This corner might also have some mirrors behind it to make this building and the number of locos look more massive.

Quote:

There may be a spur off of that helix service track to something in that coffin corner outside of the big curves. I threw in some sample trackage, ….just in case?
DSCF3333.JPG 

DSCF3506.JPG 

DSCF3507.JPG 

DSCF3508.JPG 

DSCF3509.JPG 

Perhaps locate it over in the freight yard area, rather than that back corner?

DSCF3511.JPG  

Reply 0
Ken Rice

Reach?

How far is that corner from the aisle?  When you shove a car into a building in the very corner and it derails and uncouples, how hard is it to reach?  Are you mocking this stuff up at the same height off the floor that your layout surface will be?  (So you can see how easy/hard it is to reach stuff.)

Reply 0
railandsail

Hard to Reach

You are correct there Ken. That one would be hard to reach. It would require one of those special reaching-gripping tools.

Hopefully any derails over in that corner would occur on tracks external to any building. Any trains internal to the shop building would just be a diesel engine run in on a straight piece of track,...no cars

Something to think about though.

Reply 0
Ken Rice

Contact?

An engine run into a stub ended track that doesn’t get a lot of running (it is a stub ended track after all), and is difficult to clean (inside a building on an unreachable corner) is going to have contact problems sooner or later.  And when it does, how are you going to retrieve it without damage?

Might be better to leave track out of that corner and put a scenic building or just plain scenery there.

Reply 0
railandsail

Corner Subject

Perhaps you are right there Ken,.. at lest no 'inside stowage'. Maybe the loco service building could just be a backdrop dwg or a very minimal 'flat', and the locos would and sit on external tracks?

Or as you said maybe some other 'scenery'. I'll have to give that more thought, or entertain other ideas.? One of the reasons I was giving it more immediate thought was the need to consider putting in those two turnouts off the mainline, enter and exit.
Since the use and shape of that corner does NOT effect the cutting of my plywood deck, I will likely put those ideas in the rear of my mind while I shift to more urgent decisions. 

I actually had originally been thinking of the service building being located in the area of the freight yard I pictured on the last photo there,...not far from the fueling/sanding area. I'll have to see how that fits with my overall freight yard stowage tracks, and the steel mill scene further over.

 

 

Reply 0
railandsail

Jigzaw Puzzel for Metal Benchwork

One item that has taken up time just recently is finalizing the rest of my 'metal benchwork',....such as the apportionment of my dwindling supply of square tube beams that support much of my deck work, and the final number/length needed for my staging level.

(this discussion should be continued over on the other subject thread so I don't get lost in my own discussions)
https://forum.mrhmag.com/post/metal-benchwork-12207979

 

 

 

Reply 0
railandsail

Brick Factory Scene

I felt I needed to bring this subject back over to this subject thread (particularly when I myself lost track of what subject thread it was posted in original). Ken Rice first brought up the problem with my paper template of my proposed brick factory building,.....
 

Quote:

To the left of that scene there is the brick factory with 2 tracks down either side, then the 4 kilns with their smoke stacks. The footprint for the factory is that of the Walther's Water Street Freight Terminal.  

20curves.jpg 

%20ps750.jpg 

 

Ken Rich wrote:
Brian, that paper water street warehouse cutout you have look like there is negative clearance between it and the two tracks.  It looks to me like you have the ends of the ties against the bricks of the office part of the building, leaving off the freight platforms on both sides, and with the roof overhang going over the track.  The walthers pic seems to just show the roof over the freight platform that extends down the whole length of the warehouse and office?  I must be missing something?

Brian responded:
I think you are correct Ken. I will have to look into this possible mistake of mine.
May just have to go down to only a single track on one side of the building,....bummer.

Vince added:
Track on one side, truck loading/unloading on the other side.

 

Use Only a Single Track Suggestion:
That may just be the solution. I had thought it it would be nice to have 2 so raw materials could easily reach storage tracks at rear of building,...but perhaps that is not to be.

As I said before I was unsure of the exact footprint of that building and its trackage access, and I have yet to locate my actual structure kit to look at the instructions. BUT I did manage to find a number of more helpful images via Bing search.

k%20side.jpg 

 

DSC03552.JPG 

 

%20ps750.jpg 

 

 

 

Reply 0
railandsail

Convert Truck Loading Doors?

Perhaps I could still have tracks down both sides of the building,...just make those truck loading doors on the original model be box car loading doors. Then make the truck loading ramp across the back of the building full width for several trucks.

There is no way I could use those existing truck doors (for truck loading) with the close proximity of the kilns.

 

 

Reply 0
Ken Rice

Mock it up, with clearance

Brian, you have the paper footprint that includes the loading docks.  If you have an NMRA guage you can use that to check clearance between track and the edge of the paper mockup.  If you don’t (you should probably get one), 1” between the track center line and the edge of the loading dock is probably a reasonable amount for a mockup.  My guess is once you allow for clearance that way, that would put the second train in the aisle.  (Is that line the edge of the benchwork?)

If it’s close but a little too wide, you could also consider putting both tracks on the same side of the warehouse, which should take a less width overall.

Two tracks in parallel on a single side of the warehouse, so two boxcars share a single door spot, is not uncommon on the protothype.  They put plates down between cars so the forklifts drive through the first car into the second one.  Also makes for a bit of added operating interest - if you consider the boxcar on the near track unloaded, but the one on the second track isn’t yet at the time you switch out the warehouse, you need to respot the car from the second track at the same door on the first track.

Check out one of my favorite prototype examples - Maple Leaf Distribution in the Palmer Industrial Park, which has 3 pairs of tracks.  The reason for the “extra” two tracks along the right top edge is that part of the building was added later.  Earlier satellite photos show the building without that right hand part.  In fact going by the appearance of the roof that’s the third addition.

A085DB18.png 

Reply 0
railandsail

Bridging Across Cars

That bridging across cars is interesting, ....hadn't realized that.

My temptation at the moment is to leave it as I first drew it up, as that side of the building will NEVER been seen,...but of course make corrections for clearance from the ramps and building.

 

Reply 0
railandsail

New Thoughts, freight yard, coffin corner

Another brief day today as football playoffs and grilled dinner had to be included. I had wanted to roll up this latest dwg sitting on my outdoor dwg table, so I cut get busy cutting some more metal frame work for the remaining portions of the shed. But as I uncovered it from its dew protective cover I decided to have another go at how I might lay it out,...again.

 

First the portion of the layout we are talking about,...the freight yard scene down to the steel mill, etc

l%20Mill.jpg 

 


ps750(1).jpg 
 

 

Quote:

previously posted by me....
First I drew in the two concentric mainlines in pencil.

This first image would be as one was looking towards that lower corner from Balt city corner. The track along the edge (wall, right edge of photo) would be the track that is bringing the trains up from the helix/staging level. It eventually joins that outer mainline via a left hand med size Peco into a double curved Peco (30”-60”r) on the mainline (makes for pretty broad curves).

Next inboard are the 2 mainlines with a Shinohara double crossover included there. This double crossover will provide for reversing trains around on the layout's mainlines. It will also provide for getting big steam engines from the roundhouse area over to head up certain trains brought up topsides from the staging tracks by diesel workhorses. (possible that many of the steamers will NOT have to drag their trains up the helix from staging, but rather will be able to join their consist topsides).

There may be a spur off of that helix service track to something in that coffin corner outside of the big curves. I threw in some sample trackage, ….just in case?

 

 

As Ken has posted previously, there could be problems reaching those locos stalled/disabled over in that service building I had proposed for the coffin corner,...
F3509(1).JPG 

 

 

 

So I have moved that back to the lower portion of the freight yard.
F3511(1).JPG 

This building will have to be readily removable (simply lift up) such that those multiple turnouts behind it are reachable in events of derailments. I don't think that is much of a problem considering its small footprint and rigid potential.

 

I have still maintained that additional trackage over in that coffin corner. My thoughts are that this could be a parking area for the 'dedicated diesel engines' I might employ to bring trains up from staging. I am really considering such an idea of NOT requiring my multiple number of steam engines to go down/up thru the helix to staging below. Pull the trains up via diesel, then make their hook up to steam up top there where they are entering the mainlines.


????

 

modifications, ...to be continued

Reply 0
railandsail

Subject deleted here and

Subject deleted here and added on another discussion

 

 

Reply 0
railandsail

Deleted subject here, and put

Deleted subject here, and put into another discusion.

Reply 0
Ken Rice

Max Track vs. Max Fun

At the risk of belaboring the point...  More track does not necessarily equal more fun.  More track (especially switches) means more maintenance.  Maintenance is less fun.  Not doing needed maintenance is also less fun.  So, adding track just because there's some plywood not yet completely covered with it isn't necessarily the best approach.

All I'm saying is think about it carefully.

Reply 0
railandsail

Steel Mill in the corner

I added this posting to my other subject thread dealing with just the steel mill scene, but thought for continuity I should also add it to this,... my full scale planning as well,....

 

I've come to the conclusion that I just can't hope to give the real steel industry ANY chance of a fair representation,...I just don't have the real estate on my small layout. So even while I have a number of the Walther's steel kits (already built and weathered by another modeler), I must make a selection of what I can use.

Here is portion of the layout we are talking about,...the freight yard scene down to the steel mill, etc

l%281%29.jpg 

 

0%282%29.jpg 

 

Naturally the iconic blast furnace must be included. I've located this along the inner edge of the shelf/deck just to the left of the entrance to the shed.
ose%20up.jpg 

 

On the aisle side I've provided a little bit of a set back from the very edge by including 2 tracks for slag cars, bottle cars, etc. On the opposite side I've provided for two tracks to feed the blast furnace with its raw materials including coke, limestone, ore, scrape, etc. I could not get those 'feeding tracks' out of the other end of the blast furnace (my yard end), so I thought why not just load them up with a few representative loaded cars and make it look like they were fed in from the other end,...the mirrored end.

 

In both cases these tracks will appear to be more extensive and extend into the backdrop due to the mirror that I will place at the rear of the blast furnace. This mirror will not only make those tracks appear to be much more extensive, but will also make it appear that I have TWO blast furnace in a row. It will also conveniently hide the double mainline tracks behind it.

0furnace.jpg 

furnaces.jpg 

 

The double track bascule bridge across the shed's entrance, just behind my blast furnace and off to one side  should also contribute to the 'industrial image' of a steel mill along a waterway.

 

In the end we need some product out of the steel mill. The rolling mill will be my solution. We have lots of freight cars available that are carrying rolls of steel, steel pipe, steel plate, etc, etc. I'll utilize the Walthers kit as well, likely fashioned up something like this one that appeared on the York model rr club layout I visited long ago,....
York%201.jpg 

 

York%202.jpg 

 

York%203.jpg 

 

 

 

ll%20end.jpg 
 

Too bad I can't make the rolling mill longer, but I need to keep the building short, and not too big, so I can get those 5 five tracks (2 around the sides, 3 inner ones) on the ends of the building to neck down to 3 of the yard tracks.
 

One of those tracks also feeds a 'fabricator' of steel parts,...that is represented by the 'rail rebuilder kit' from Walthers with the addition of a outdoors overhead crane out front. This structure could alternately be that Vulcan manufacturing kit from Walthers. I just happen to run across this image and thought it added to the 'industrial image' I'm trying to establish there.

e%20side.jpg 

Reply 0
railandsail

Delay in Planning Stages

Sorry to not have gotten back to this 'planning stage', I've been busy getting the connection bridges done for my helix-to-layout, and I've had to make a number of redo's, as I changed some of the bridge materials, and sought to make the connections foolproof due to their eventual accessibility questions.

I felt I had reached a point that my major routes and mainlines were now set in stone. It is now a question of some local industries along the routes (coal mine, lumber mill, logging trains, .....all on the upper level, then refinery and peninsula details on the lower level).

I look forward to getting back to this full scale planning, but first I need to get some actual track layed down. The outdoor weather also has some effects on the layout construction. Our cooler weather in Florida right now dictates a preference for outside projects. 

 

 

Reply 0
railandsail

Logging Area Plans

I've laid out some of that brown paper on which to do some tentative plans for my sawmill complex at the base of the peninsula. Since I don't have any plywood decking cut for that upper level yet, I've laid it out on the deck below

When I went to print out some Peco turnout templates I got confused my their listings on their site, AND trying to get them printed in proper full scale. I've written Peco an email about my confusion with their numbering designations on their site, and referenced this discussion where I previously utilized their templates. I thought I would bring this subject thread back to the forefront, so they could readily find it when they receive my email.

 

 

Reply 0
railandsail

Logging Area Plans

I ended up opening an entirely new subject thread having to do with developing this logging area scene,...

Logging Locos, Logging Track Plan, Logging Mill, Mainline Pick-up
https://forum.mrhmag.com/post/logging-locos-logging-track-plan-logging-mill-mainline-pickup-12213119

This is what I arrived at thus far. Pretty happy with the logging scene shown here.
https://forum.mrhmag.com/post/logging-locos-logging-track-plan-logging-mill-mainline-pickup-12213119

 

Reply 0
railandsail

Dilemma

But now I have developed another real dilemma. That track that makes a Y just beyond the bridge to proceed down the left hand side of the upper deck requires a fair bit of run-out to get back down to 'ground level'. That 'alternative track' was a part of the original plan so that a train could continue to make loops around the upper deck before having to go back down the helix. Its that reason I would like to have that capability.

0cropped.jpg 

But that track is presenting problems. It needed to an elevated track dropping from a high point of about 3.5-4.0" inches high at the bridge Y, and it was in the very foreground of that 23" deep deck. That was OK when I planned on having a container yard with many stacked containers in the background. But now that container yard is over on the other side of the shed.

I don't think its a good idea to have an elevated track in the foreground of a relatively shallow deck (disregard those plastic risers,....just there to get an idea of grade)
DSCF4416.jpg 

DSCF4419.jpg 

 

Not only is that declining grade track acting as a view block to items/tracks behind it, but it is running right down the middle of that upper deck and interfering with making mainline connection tracks with various tracks that will likely be needed to service the refinery area being considered in the corner down at the bottom of that grade.

F4298(1).JPG 

 

I need to find an alternative way to get my continuous loop track into that upper level track plan,...even it involves big changes including moving the crossover turnouts in that upper left corner, or bringing the alternative track curve over so as to run down adjacent to the wall while curving the dbl-mainlines out to the mid-ground/fore-ground of the deck,....     etc

IDEAS? I'm stuck trying to think of solutions



 

Reply 0
railandsail

Revised Paper Mock-Up Plan for Steel Scene & Freight Yard

Quote:

Final Track Plan

Finally finished up this final track plan for the combo steel mill scene & freight yard a few days ago, but just getting around to writing it up and posting a few photos. For me this has been probably the most difficult plan of all the areas on my layout. Wonder if others find freight yards a little difficult?? (and I am not even thinking of a formal, prototypical freight yard as I am sure mine is NOT).

 

My primary difficulties arose in juggling the distances between the various tracks (including providing extra width for the fueling/sanding structure), and matching up the switches of the inlet ladder with those of the exit ladder. One little change in one orientation and size would alter everything down the road,...and start over again,... and again.

 

I was trying to think if this was a much easier job for those folks working with a computer software program?? I'm personally not that computer literate, and even if I were I think it might present problems with fine-tuning and fitting the various mating turnouts together in a smooth manner. Just working with the EXACT SIZE paper templates was challenging enough,...and I often had to hook up the actual turnouts together to be sure I had the paper templates correctly assembled.

 

https://forum.mrhmag.com/post/steel-mill-scene-in-a-corner-now-coke-plant-power-plant-12209837

Reply 0