eastwind
I'm looking for some pictures and instructions or videos on how to make turnout points. Not the fast-tracks way where you file away a portion of the stock rail head, but a more prototypical way where the point rail fits under the stock rail head. I've seen this before, but can't find it now that I want to reference it.
 
I know how to make points the fast-tracks way, I'm looking to up my game. I think the method still involves filing away the base of the stock rail (which isn't prototypical) but that's ok, as long as I can avoid the notch in the rail head. I need to know how much of the rail head of the point rail to remove, and in what best order to file bits of it away.
 
I could certainly just do trial and error, but this knowledge is out there, somewhere.

You can call me EW. Here's my blog index

Reply 1
Mnemonic
eastwind wrote:
...but a more prototypical way where the point rail fits under the stock rail head. 
 
Prototype North American points actually don't fit under the ball of the stock rail. They fit flush to the ball of the stock rail. The points are tapered, very much like the FastTracks method. The base of the point rests atop the base of the stock rail.
 
Railway_turnout_-_Oulu_Finland.jpg
 
Notice how the diverging point is flush to the stock rail. 
 
I have never seen a "prototyical" North American switch layout where the points nestle under the ball of the stock rail. For one thing, it would make performing FRA-mandated point obstruction and point indication tests impossible with the current obstruction gauges available.
Reply 1
Prof_Klyzlr
Dear EW,
 
@Andy Reichert has you covered...
 
Happy Modelling,
Aim to Improve,
Prof Klyzlr
Reply 2
David Husman dave1905
You can also look at my switch laying handout.  I notch the base but not the head of the stock rail.  I do filing on 2 planes, Proto87 does "filing" on three planes.
 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 3
vinceg
You can also look at my switch laying handout.  I notch the base but not the head of the stock rail.  I do filing on 2 planes, Proto87 does "filing" on three planes.
 
 
Nice handout, Dave. Thanks.
 
Vince
Reply 2
Mnemonic
You can also look at my switch laying handout.  I notch the base but not the head of the stock rail.  I do filing on 2 planes, Proto87 does "filing" on three planes.
 
 
Downloaded! Thanks, Dave.
Reply 3
eastwind
Thanks everyone, I think maybe Dave's handout is what I saw before.

You can call me EW. Here's my blog index

Reply 1
ctxmf74
"a more prototypical way"
 
Points are one of those areas ( like Kadee couplers) where the model way is better than the prototypical way.  We can use simplified throw bars by extending the point rail down even with the bottom of the stock rail. The larger a layout the more important simplicity becomes, a small layout can spend more time per square foot on maintenance  .....DaveB
Reply 2
Andy Reichert
Just note that the planed (model "filed") end of each point should  be sharply but slightly bent inward at the position where the  closed point head planing first touches the stock rail head. That allows the web of the point rail to continue all the way to the point end to maximize its strength. You can just about see that in the earlier posted picture.
 
pschmidt700 wrote:
 
Railway_turnout_-_Oulu_Finland.jpg
 
 
However that also means that the model filing angles must be designed asymmetrically to allow for the later bend. Other wise just symmetrically filing both sides  of the end of the point the same angle will cause a bump on the inner side of the closed point which reduces  the track gauge  (and bumps the diverging wheel) at that place.
 
Andy
 
 
Reply 4
Andy Reichert
 
ctxmf74 wrote:
"a more prototypical way"
 
Points are one of those areas ( like Kadee couplers) where the model way is better than the prototypical way.  We can use simplified throw bars by extending the point rail down even with the bottom of the stock rail. The larger a layout the more important simplicity becomes, a small layout can spend more time per square foot on maintenance  .....DaveB
 
That's only because strength of materials, for rail in particular, doesn't scale down (or up). Cutting away the  rail base of the stock rail on the prototype risks the stock rail collapsing inward under typical RR heavy loads and guaranteeing a derailment at every point.  It all depends on how close to prototypical operations you want to be.
 
Andy
Reply 3
Mnemonic
Not sure if this tidbit helps anyone or not, but when the gandys change out a point  because of wear, they typically also change out the stock rail at the same, and vice versa if the stock rail needs replacement.
Reply 1
Matt Goodman
 
Thanks for posting this, Dave. I've seen the presentation before, but didn't know where it came from. 
 
@eastwind, here's some points I made that Dave's presentation illustrates. It occurred to me to "plane" the gauge and (to a lesser degree) after looking through a 1929 Maintenance Cyclopedia. I figured if it worked for the prototype...
 
The filed rail base is a concession I'm willing to make to keep more strength in the point rail.
 
IMG_4687.jpeg
 
IMG_4688.jpeg

Matt Goodman
Columbus, OH, US
--------------------------
MRH Blog
VI Tower Blog - Along the tracks in pre-war Circleville, Ohio
Why I Model Steam - Why steam locomotion is in my blood

Reply 3
Ted Becker rail.bird
What did I miss?  I haven't seen Fast Tracks instructions to file the head of the rail.  None of the dozens I've built have the head of the stock rail filed.
 
My points are filed on one plane with the jig and then a slight  bend like Andy describes so there is extra tension against the stock rail right at the tip of the point.
 
The only points I have filed the extra bevel on are those that I did not file thin enough in the first place.   Usually proper gauging does more good than beveling switch points.


Ted Becker

Granite Falls, WA

Reply 1
Andy Reichert
point planing close 3.jpg
 
Continuously straight inner edge of point rail head means no gauge or bump issues.
 
Andy
Reply 4
eastwind
Here's one of their printed guides:  https://www.handlaidtrack.com//assets/downloads/ug01.pdf
see image #35. If you file the stock rail with their stock aide tool you naturally file away both the foot of the rail and some of the head of the rail, leaving a notch that the points fit into. As long as the point is thrown into the notch, you won't have wheels picking the points, but it looks wrong from a foot away.
 

You can call me EW. Here's my blog index

Reply 0
eastwind
You know, I got one of my fast tracks turnout skelletons out to look at, thinking I'd take a picture to show the notch, and realized what I was seeing was almost completely the notch in the rail foot. I'm not sure if there's any removal of rail head that I can see or not. At any rate, it's too slight to be visible from even a foot away with my eyes.
 
So I think I will fall back to just filing using my stock aide tool and doing it the fast tracks way - it's closer to what Dave's doing freestyle than I thought, and I will buy into the posted wisdom that it's better for reliability to depart from the prototype as far as filing away the base of the stock rail. 
 
I might, when I get to that point in the build, try putting a little kerf on the tip of point so 1 mm of the rail head of the point is filed away and see if it nestles under the stock rail head a little, something like Dave's "second plane" of filing. But I'm going to give up on trying to make the point rail ride up over an intact stock rail foot, and claim that the stock rail head is fully intact as Ted Becker says.
 
 

You can call me EW. Here's my blog index

Reply 0
Ken Rice
A couple prototype tidbits for what it’s worth…
 
From the Simmons-Boardman Track Data Handbook, a cross section of the tip of a point, and a side view of a turnout showing taper on the top of the point.  Note the reinforcing bars on both sides of the point.
 
46AD8284-BDBD-467A-A2D1-B1E2DD32CDC7.jpeg
 
And a turnout on a nearby commuter rail line.  Note the beefy point reinforcing bars.  But more interestingly, look carefully and the inside of the railhead on the far stock rail - note that it’s been planed back at an angle to provide more clearance for the point.
 
FA570395-5E1A-4D88-9599-9BDEA752C136.jpeg
 
Reply 1
pldvdk
Boy, this seems a lot more complicated than it needs to be.
 
I file the base of the stock rail away on the inside. File the outside of the point rail down until it looks like an "L". For this I usually use my Fast Tracks point jig. Then hit the inside of the point with a file as it sits against the stock rail. Check the smoothness of the point with a truck to make sure everything is silky smooth, and I'm done.
 
I've got 140+ turnouts on my layout, and have yet to see a train pick a point. 

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 1
eastwind
Ok, ok. I gave up already.  I'm off making a tiebreaker jig.  That's to assist in cutting ties to lengths that are multiples of 6" in 1:1, without having to measure each tie. 
 
I know I could just ignore what the prototype does and cut the ties off at a slant, but I like the stair-step look of ties that are multiples of six inches. 

You can call me EW. Here's my blog index

Reply 0
David Emery deemery2
Fast Tracks has great assembly videos.  Even if you don't buy their jigs, the Point Tool is definitely worth the money!
 
dave
Modeling 1890s northeast US
Reply 0
Andy Reichert
There's definitely a wide gulf between "modeling" expectations for accurately modeled $60 box cars, hoppers and $350 locomotives and the two strips of metal on some wood and PCB bits that the same modelers want to see all that expensive accuracy, realistically  sitting on
 
I have to wonder what the success of a bare bones "box car jig" that made completely detail free box cars would be.
 
Andy 
 
 
Reply 0
Ken Rice
When a train is moving, very few people look at the track under it.
Reply 1
Selector
Unless things have changed since the last time I viewed Warris' video on a typical through-diverging turnout construction, only the inside foot of the stock rail was to be ground back a bit, and that was to prevent the solder from wicking out too wide and snagging the base of the point rail.  Also, Tim found, through trial and error, and from feedback from customers, that often the point rail simply would not lie flush against the inside face of the stock rail because of small bits of point-rail footing left from the filing process.  He found that the problem was best avoided by filing off a small depth of the stock rail foot on the inside, and at a length of about 1.5", depending on the frog number and the length of the points.
Reply 0
ctxmf74
"I have to wonder what the success of a bare bones "box car jig" "
 
Athearn made millions of them  from 1957 till the end of the blue box era ....DaveB
Reply 0
Andy Reichert
ctxmf74 wrote:
"I have to wonder what the success of a bare bones "box car jig" "
 
Athearn made millions of them  from 1957 till the end of the blue box era ....DaveB
 
A jig is a tool, not the end product.
 
Andy
Reply 0
Reply