railandsail

I'm designing a new double-deck layout to fit inside my 12x16 'train shed'.  It will have an 'outdoor' helix structure,... outside the main shed, but in its own enclosure.
%2C%20ps.jpg 

It will have shelf's on either side, and a peninsula. For the longest time I had been planning for a 6-8 track staging area to be located approx 8" under ONE of the side shelfs,...perhaps like this

Edited: removed an old track plan as it is way out of date, and replaced it with this newer version,..
s%281%29.jpg 
 

 

I decided to re-look at the possibility of utilizing the helix structure to gain access to the the staging tracks. What if I decided to try to add two loops to the bottom of my planned outdoor helix to take the trains down to the staging level?
 

And now I could have staging tracks on both sides of the layout  I could even have staging down the center of the peninsula. Lets see 6 tracks each on both sides, and 2-4 down the center,...wow, 14-16 tracks of staging (each with a different type train ready to run)

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Insulating the Helix

Fortunately this helix structure will only get about 3-4 hours of direct sunlight each day. Trees in my backyard shade the structure till about 12 noon, then the direct sun gets blocked by the shed and the carport roof after 4 pm.

There are plans for a big screened opening in the bottom that could help with air circulation, and we are looking into a fan situation to help with that circulation,...forced natural circulation.

The fellow helping me has also suggested a method of letting some of the AC in the main shed to leak into the helix space.

just prior to sun exposure...
e%20noon.jpg 

 

 

after 3 pmut%203pm.jpg 

 

after 4pm
204pm(1).jpg 

Reply 0
railandsail

Helix 'Wheel' on edge

Turned the helix wheel on its edge today to drill all the (MULTIPLE) holes in the upright post that will mount the brackets that will support the spiral, circular roadbed.
(Got a few funny comments from the neighbors wondering what I am building)

F2783(1).JPG 

 

DSCF2785.JPG 
 

 

Reply 0
UglyK5

Brian tell them you got a

Brian tell them you got a giant hamster that should be delivered next week, this is his exercise wheel. 

Jeff

—————————————
“Think before you post, try to be positive, and you do not always have to give your opinion.....”
-Bessemer Bob
Reply 0
jimfitch

First thing I thought too,

First thing I thought too, giant gerbil wheel.

As far as track cramming, I think Brian has me beat.  I crammed an 11 track staging yard under my yeard in a 10x18' room but managed to avoid a helix.  

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
railandsail

a Tom Sawyer couple of days

A couple of days ago I dragged out the metal sheets I had purchased about a year ago to enclose my external helix. Its alum sheeting that matches the sheeting on my primary shed, except it was a silver color rather than white like my shed.

SURPRISE, it had a number of spots of corrosion/discoloration due to being stored right next to one another and subject to rain.
DSCF2786.JPG 

 

DSCF2787.JPG 

 

I was surprised to learn this was a common problem for metal sheeting materials stored in this manner.

So off to the store to buy some primer to cover up this corrosion/discoloration (both sides of 4 sheets). First wash it all down with a big brush, and simple green, dry it out in between our rain storms, and get at least one good coat of white paint on the outside of each of the four sheets. Today I finished up the painting job by getting a good coat of light gray paint on the 'inside surface' of those panels. 

While painting these panels that were leaning against a fence in my backyard, I began to get visions of Tom Sawyer whitewashing his fence. My thoughts turned to what neighbors I might recruit to help with the painting job. I even got out some special French lemonade as a recruit prize for any helpers.

The only volunteer I got was my 88 year old neighbor Robert . But he never got around to doing any painting. I think he just wanted the free lemonade....ha...ha

DSCF2788.JPG 

 

DSCF2789.JPG 

 

For those younger folks who might not know who Tom Sawyer was,....
http://www.pbs.org/marktwain/learnmore/writings_tom.html
 

Reply 0
railandsail

Initial Install

Got my helix structure all screwed together and moved it outback this morning. Elevated it into position via some saw horses and worked on leveling and connections to the rear of the train shed.  It only took two of use to lift it and carry it out back,...thanks to almost all alum structure

Went out to the hardware store to get some special bolts for supports,....

Then the torrential thunder and hour long storms came, and everything came to a halt. Have to get some pics tomorrow. Its going to look good.

Reply 0
railandsail

Helix is Hanging on its Own ....yeh

Okay its bolted to the rear of the shed on one end, and standing on two poles on the other. Looks gooood, and its rigid.

I'm very pleased with the access gap height which is larger than I first surmised. I had not included the difference between the height off the floor of the main shed as compared to the extra 6 inches I got by the new height off the ground on which the shed sits. Pretty easy to get into, especially when I lay a piece of foam pad on that concrete pad.

One of the photos shows a chair and a step ladder inside the loop as I was bolting things up. With the roof on it will be tall enough for me to stand in (I'm 6'4")

I think my access to that 3-way turnout that will distribute trains to the staging tracks is also going to be of little concern.

DSCF2795.JPG 

 

DSCF2796.JPG 

 

DSCF2797.JPG 

 

DSCF2792.JPG 

Reply 0
railandsail

Someone asked, whats

Someone asked, whats next?

All of those vertical alum post are already drilled to accept the angle brackets that will support the roadbed. The brackets are all purchased, the roadbed is already all cut and painted and waiting installation. I may be applying another sealing coat of paint to them once our extremely high/early humidity drops down a little bit so things can dry more quickly. Likely I will be installing the roadbed in its quarter-circle pieces from the bottom up, along with the tracks for those sections.

And I need to put a roof on the helix before I begin roadbed installation. I hope to do most of the roadbed and track installation prior to putting on all the skins on the structure. And I have some plastic rain gutter material that will likely be mounted into place for the transition tracks from the helix into the main room.


I may delay things a bit until our DAILY bout of heavy thunderstorms in afternoons/evenings subsides. I just finished redoing my blue sky painting in the main shed, and likely will start putting up the supports for the staging tracks, and their plywood roadbed, and installing some of that staging tracks. The rain won't hurt those,...and it won't bother the all alum helix structure either.

 

Oh yea, I also painted that concrete slab under the helix with some special lt-grey paint I purchased a few weeks ago to originally seal the roadbed materials. It was ALL WRONG for that job with its sand paper finish, but it worked out OK for refinishing my concrete. I even sampled some of it on some other walkways I have, and know I am in the mode to pressure wash those this weekend and paint them with this paint (side-tracked from RR project)

Reply 0
railandsail

Staging Track Mock-Up, (nervous over clearance )

 

Quote:
Quote:

Nervous over clearance

I woke up this morning having had nightmares over access to my staging area(s) 'buried' under those large plywood decks  just overhead. I'm going to do a mock-up today to investigate my concerns.

I am far LESS nervous this evening. I did a mock-up this afternoon (very crude), and I am real happy with the way it turned out. I placed a couple of pieces of plywood on my 'outdoor bench' and separated them by 7 1/4". Then placed some random pieces of track and a loco and a tender I had handy. Plenty of space..
DSCF2798.JPG  DSCF2799.JPG  DSCF2802.JPG 

 

I then added in a piece of square steel stock that will be utilized in a 'horizontal manner' to support my plywood decks. In this photo example the steel support frame was placed right at the front of the staging access. In reality the staging tracks are recessed back from this sort of steel framing.
%2C%20ps.jpg 

 

Then I added 5 tracks as I have planned on my staging...
%2C%20ps.jpg 

 

%2C%20ps.jpg 

Looks like I could get away with only 12-13 inches of staging depth from the side walls of the shed.

Reply 0
railandsail

posted on another forum....

 

Quote:

Hmm  7 1/4 inch between decks.  Yeah, thats the absolute minimum.  I had 11 staging tracks and could just barely reach over the tops of trains to get to trains at the back. 

Your's only having 5 parallel tracks should be a little better.

Riogrande

 

 One item of mine that is quite different than yours is that I will NOT have all those vertical supports between the main deck and the staging tracks. My staging tracks will be mounted on a 3/4' thick plywood roadbed that is cantilivered from the wall,...thus no frontal obstacles.

Reply 0
jimfitch

The above photo was my

The above photo was my previous basement layout.  The clearance was 7 1/2 inches from the homasote to the ceiling above.  It was just barely enough clearance to reach across to trains in the rear tracks.

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
ACR_Forever

Had one

like that, 12 tracks deep on my old layout.  Fill the front 11 with trains, and try rerailing that back train.  Make sure the mockup is at the same height as your design.  Mine was such that I had to sit on a cushion on the floor to reach in with my arm level, just grazing the top of the front cars.  No shirtsleeves allowed.  It could be done.  Fixing any misaligned trackage, forget it.  Temperature and humidity swings doomed that RR anyway.  Due to a basement "humidity excursion", the tracks in the staging area became random squiggles, centered around each track nail.  The ladder to the yard was similarly hard to get to, and had, of course, one Peco 3-way with a persistent derailment habit due to a grade transition under it.  

If you're going to do buried staging, decide how you will clean it, maintain it, and repair it, don't just worry about rerailing cars.  Particularly, don't bury access to any switches.  

Blair

Reply 0
railandsail

smithbr Had one like that, 12

Quote:

smithbr
Had one like that, 12 tracks deep on my old layout.  Fill the front 11 with trains, and try rerailing that back train.  Make sure the mockup is at the same height as your design.  Mine was such that I had to sit on a cushion on the floor to reach in with my arm level, just grazing the top of the front cars. 

Fortunately mine is only 5 tracks deep,...and it is at such a height off the floor (33") that I can sit in a short chair and reach in. Plus I have very long relatively thin arms.

 

 

Quote:

Fixing any misaligned trackage, forget it.  Temperature and humidity swings doomed that RR anyway.  Due to a basement "humidity excursion", the tracks in the staging area became random squiggles, centered around each track nail. 

My staging tracks will be mounted on real good grade 3/4" plywood that has been acclimatized for 2 months under my carport. It will also be sealed up with paint on all sides before final installation, and the tracks will be laid in the higher temps/humidity of summer to anticipate contraction rather then expansion in the cooler months.
The staging tracks will also be laid in advance of the covering layer to allow for negative changes to occur prior to being covered.

Quote:

The ladder to the yard was similarly hard to get to, and had, of course, one Peco 3-way with a persistent derailment habit due to a grade transition under it. 

I will be able to reach the ladder section of turnouts from both the front and rear of the staging roadbed in that area. My 3-way is going to be pretty acessable, and not on a grade transition.

Quote:

If you're going to do buried staging, decide how you will clean it, maintain it, and repair it, don't just worry about rerailing cars.  Particularly, don't bury access to any switches. 

Don't see how to avoid 'covering' the ladder switches.

 

 

 

Reply 0
ACR_Forever

All good replies, Brian

and I'm glad to see you've thought all that through.  But if you can find a way to at least make switch access less than traumatic, I'd suggest you do it.  If I could have replaced that 3-way, instead of having to inspect it with an inspection mirror in one hand, a forehead light, and an NMRA gauge in the other, I would have yanked it in an instant.  When we finally daylighted it, I could see that the vertical curve through the middle of the switch seemed to have resulted in suppression of one end of the frog of one leg, resulting in an opportune place for cars to jump the frog.  At least that's what I think was going on, I didn't measure as I was loading a trailer for the dump.  Of course, replacing it might not have helped, given the root cause, but I couldn't see that, because the whole thing was 16" back from the access point. 

Thing is, we don't know what hidden flaw might exist in any item we purchase.  I recently picked a brand new Peco Streamline #8 out of it's package.  Looked flawless, but there was no continuity from stock rail to one of the rails leading to the points.  Turned out one of the jumpers embedded in the underside of the ties had lost connection with the stock rail; the factory joint (soldered) had let go, and was intermittent.  Had I built that into the layout, it was only a matter of time before I had a dead turnout, yet it was only luck that it happened to not conduct when I tested the switch (I'm now testing every switch before they go to the layout, but intermittents can still fool me).

I'm glad to see you've at least thought your way through the whole thing, though I do worry that your "steel clad outhouse" location for the helix, etc.  is going to result in temperature swings that will give you grief.  Time will tell, I guess, and for your sake, I hope I'm wrong!

Blair

 

Reply 0
railandsail

@ Blair I hope you are wrong

@ Blair
I hope you are wrong also. .....BTW that's an aluminum clad outhouse....ha...ha

Reply 0
gary

Is this a dumb question?

I have a really dumb question to ask. if your big worry is the 8" clearance between the top deck and the staging levels, AND the helix exsists only to bring trains down from the layout and distribute them to one of the three lower staging levels, ..... why not just add another loop or two to the helix and drop the height of the staging areas another 4 or 8 inches thereby giving you a 12 or 16 inch clearance between the levels. I mean the staging areas are usually out of sight behind a curtain or sliding door panels or something so what does it matter what level they are at when they are hidden?

Reply 0
railandsail

Question Answered

Helix does not exist just to serve staging,...only the lower loops of helix serve staging.

I considered this possibility to do another loop in the 'sub-helix', but that would lower my overall structure another 4" plus, and thus make it more difficult to get inside the helix 'donut' to service it. And it would have further limited by storage space under the helix shelf.

I think i can build the helix trackage foolproof enough that this 8" of clearance will be enough.

Reply 0
railandsail

Roof on the 'Outhouse'

Probably going to be putting a roof on my 'outhouse' towards the end of the week. Everyday rain storms, high heat, and other house projects interfered with more work on the helix structure recently.

Can't wait to start placing roadbed inside the helix, but 2 things have to happen first; 1) constant rain storms have to diminish, 2) I'd like to get another coating of waterproofing on the roadbed pieces before subjecting them to our very high humidity levels as of late.

Reply 0
railandsail

Roof on 'Outhouse' Helix Structure (update)

I still get a kick out of this 'outhouse' designation....ha...ha

Turned on my AC in the main shed, made a little room  for painting, and got a new coat of paint on my masonite roadbed pieces. This time I applied a concrete/masonary 1-part epoxy paint I had sitting around. It went on great, dried fairly quick, and has NO appearances of 'tackiness' that the original primer coat appeared to have even weeks after application. i believe that roadbed is now sealed up against moisture absorption. And the AC environment really helped.

The roof will be fabricated next week.
 

(BTW, all this work had to be delayed by the purchase, pick up, and installation of a little-used Sunsetter awning to the front of my lanai room that was being bombarded by the afternoon sun. )

Reply 0
railandsail

Reverse Loop Wiring of Staging Tracks

I recall this gentleman's posting(s) about the reverse loop wiring I was going to need on my staging tracks, but I could not remember where the posting was made (under what subject thread). I found the posting this morning and thought it might better be reproduced over on this subject thread where I will need it for reference.



Another Whack at Reverse Loop

-700x222.jpg 

Compare to my earlier post on Page 2 of this thread.

This shows a simple reverse section set-up that requires no electronic reversing sections. All the green is reversing section. Double gaps in both rails are at both legs of Turnout A. A DPDT switch aligns polarity of the rails depending on which way the turnout is thrown,

vLOOP_A2.jpg 

If the DPDT is a slide switch, an activator rod from its handle can move the points of the turnout.

In this diagram maroon - MAIN - and green - REVERSING -show the center lines of the tracks. RED and BLACK show the power busses for MAIN. Orange and BLUE show busses for REVERSING.

Advantages-

There is no concern about more than one train crossing the gaps, unless somebody insists on running a train thru the turnout while another train is using it in the other direction.

Simple electronics, with no dependence on circuit cards for auto-reversing.

Disadvantage:

Five balloon track plus the entire stub-end yard are on one circuit. With lots of locos "cooking" the current demand can be large. Big Booster.  OR  individual tracks can be equipped with OFF /ON toggles or pushbuttons so that only the track being used is alive at any time.

More than one booster can be used for the GREEN tracks, but that could be complicated.

DrJolS

Reply 0
railandsail

Multiple Lashup Entering Reverse Loop

 

Quote:

There is no concern about more than one train crossing the gaps, unless somebody insists on running a train thru the turnout while another train is using it in the other direction.

Simple electronics, with no dependence on circuit cards for auto-reversing.

DrJolS

My question is what happens when one has a multi lash-up of locos (2-4 diesels for instance) crossing into a reverse loop? Isn't this a case of several of the locos on one circuit, while the others are on another??

I fully imagine a number of my 'staged trains' being headed up by multiple diesels. And even several by doulble-headed steam.

 

 

Reply 0
DrJolS

No Problem

If using an electronic reverser, when the first loco of the consist enters the reverse section, the polarity of the reverse section is matched to the main section. It stays that way until the first loco exits the reverse section to the main, when the polarity of the reverse section is changed to again match the main.

In the case of using contacts on a turnout for reversing, polarities of reverse and main are matched by the position of the points in the turnout.

DrJolS

Reply 0
railandsail

Terminology?

Quote:

Simple electronics, with no dependence on circuit cards for auto-reversing.

DrJolS

 

Quote:

If using an electronic reverser, when the first loco of the consist enters the reverse section, the polarity of the reverse section is matched to the main section.

DrJolS

I guess I need to do some more reading on this subject that appears confusing to me. And perhaps it is also in the terminology?
What is the difference in the circuit cards and the auto reverser?

Reply 0
DrJolS

@Brian, 1. When I said

@Brian,

1. When I said "circuit cards" I could have said "auto-reverser." Same thing.

2. Here is a link to an extensive web page that should help. 

http://www.wiringfordcc.com/intro2dcc.htm#a26

3. Once you have seen the info in the linked page, I suggest that you poke around in the same wiringfordcc site for all kinds of relevant info. Use the links on that page.

4. If you decide to follow my suggested reverse section depending only on a DPDT switch, then the stuff about the cards or auto-reverser doesn't matter.

Happy browsing.

DrJolS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

website 

Reply 0
Wazzzy

The use of a DPDT switch will

The use of a DPDT switch will work in your staging reverse loop.

Trains will always have to enter/exit the loop in the same direction every time: always enter on the straight leg and always exit on the divergent leg of the head/main turnout. 

The DPDT switch will have to be a break-before-make. Otherwise it will create a short and shut the system/block off. Tortoises will work for this application. During the switch throw, the power to the tracks will be interrupted for a brief moment and return after the throw is complete. 

The turnouts leading into and out of the individual staging tracks can have switches installed to turn on or off track power if consumption overloads the booster. 

 

Alan Loizeaux

CEO Empire Trackworks  (Empire-Trackworks.com)

Modeling ON30 DRG

Husband, Father, Grandpa, Retired Military, Conductor / Yard Master Norfolk Southern, Owner Empire Trackworks (S, SN3, On3, On30, On2, HOn3, O 2-rail & others)

Reply 0
Reply