railandsail

I'm designing a new double-deck layout to fit inside my 12x16 'train shed'.  It will have an 'outdoor' helix structure,... outside the main shed, but in its own enclosure.
%2C%20ps.jpg 

It will have shelf's on either side, and a peninsula. For the longest time I had been planning for a 6-8 track staging area to be located approx 8" under ONE of the side shelfs,...perhaps like this

Edited: removed an old track plan as it is way out of date, and replaced it with this newer version,..
s%281%29.jpg 
 

 

I decided to re-look at the possibility of utilizing the helix structure to gain access to the the staging tracks. What if I decided to try to add two loops to the bottom of my planned outdoor helix to take the trains down to the staging level?
 

And now I could have staging tracks on both sides of the layout  I could even have staging down the center of the peninsula. Lets see 6 tracks each on both sides, and 2-4 down the center,...wow, 14-16 tracks of staging (each with a different type train ready to run)

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Resumed Work on Helix Housing

Finally got back to working on the helix housing,...including roof and some siding.

Other than the sheeting of the roof and the siding, most all of the helix structure is built from materials I salvaged from my local metal scrape yard,,,much of it 2x2, 2x3, and 2x4 alum extrusions utilized in the screen porch industry. Easy to cut with a chop saw or skill saw.

Then there are the upright post attached to the large alum ring that I had fabricated from flat alum bar stock. These upright post, that will support the helix roadbeds that are largely utilized in stair case handrail and balcony handrail constructions.

DSCF2868.JPG 

 

DSCF2869.JPG 

 

DSCF2870.JPG 

 

DSCF2872.JPG 

 

DSCF2873.JPG 

 

Hope to finish cutting the sheet metal roof today.

Reply 0
anteaum2666

Auto Reverser

Hi Brian,

I've been following along on your build and it's very cool.  I love engineering like this, and find it to be one of the most enjoyable parts of the hobby.  

Your auto reverser idea with the slide switch will work, but if you don't mind my saying, I HIGHLY recommend a DCC Specialties PSX-AR Auto Reverser.  They work flawlessly, and make you forget that you even have a reverse loop.  An additional benefit is that you likely won't need any on/off switches with the PSX-AR either.  It will handle the inrush current from the decoders with ease.  If you have sound decoders, set them to go quiet when not in use.  This keeps down the extra noise as well, and helps keep the decoders from overheating.

https://www.dccspecialties.com/products/pdf/man_psxar.pdf

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
railandsail

auto reverser

Thank you Michael A, I made a special note of that,...Now if I can just keep all this 'help info' in my memory or at least accessable.

Reply 0
railandsail

Delay

Got some metal shavings (from drilling overhead) in my eye early yesterday morning,...so delay for the day

Reply 0
anteaum2666

Ouch!

I hope your eye is okay!  Model Railroading is definitely a high-risk sport.  Hot glue, solder, metal shavings, paint fumes, OMG!

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
railandsail

Accessible 3-way Peco

In the past I have expressed concern over the eventual accessibility of the 3-way turnout leading into my staging tracks.

I did a little mock up today, and now I feel much better about the situation.

DSCF2874.JPG 

 

DSCF2875.JPG 

 

DSCF2878.JPG 
 

I will be able to reach this from 1) the inside of the helix structure, 2) from a door I will form in the outside wall, and 3) from underneath via a removable panel I will build in the 'floor' of this helix structure.

Reply 0
railandsail

Insulating the Helix

Last couple of days I've been playing with insulation ideas for my helix structure. Things have gone good.
i had been toying with several ideas for insulating the alum/steel roof sheets.

My contractor friend was saying he had some bubble-wrap type insulation that often gets utilized in metal buildings. I wasn't that enthused with the idea, even though it sounded easy to install.

I had scrounged some partial sheets of 2" thick foil-faced foam from a construction job here in St Augustine. At first I thought about how to adhere that foam to the steel roof panels that I am sure can get quite hot in this FL sun. Wait a minute, how about sitting it on the top of my upper circular ring/frame that is surrounded by a 2" thick box extrusions? Dimensions would work out really good,...all 2" thick stuff ! AND i would not have to 'glue' it to the underside of the roof panels,...and I would have an 'air gap' between that sheet metal roof and the foil face of the insulation.

Proceeded to lay the 3 partial sheets of foam out in my carport, tape andglue their edges together to get one 'single big piece' of foam insulation that i could subsequently cut to exact size to fit my helix structure.. Went ahead and put a coat of white paint on the underside that will be the ceiling in the helix.

DSCF2883.JPG 

 

DSCF2884.JPG 

 

DSCF2887.JPG 

 

DSCF2888.JPG 

 

DSCF2889.JPG 

 

I really fit this big piece of foam down into postion just right. Next I will be screwing down the sheet roof panels. BTW there are two of these panels, each about 3,5 ' wide and 7' long. I must have lifted and placed these 2 panels off and on again about 6 times as I played with the design and fit. Lucky I am tall, and in good shape to do this myself.

The top is so strong now that I have no problem  climbing on it with my 205 lbs.
 

Tomorrow I will be tackling some of the insulation ideas for the sides. I now feel my helix structure will be well insulated. And I have the roof extended out over the edge of 'box' such that it provides an 'awning' over the side entrance. This awning will provide rain coverage for the side opening 'door' I intend to provide for servicing and problems with the 3-way turnout that feeds the staging tracks,

 

 

Reply 0
railandsail

Lots of Screws

Got to work on the helix early this morning in an effort to beat the direct sun on the roof. Sure took a longer time than I anticipated to put all those screws in the roof panels ,...building this 'little hanging helix' took a LOT longer than I ever anticipated,,,,ha...ha)

Here are a couple of photos that show how nice that big 2" thick piece of foam fit over the upper rim ring of the helix. I'm am really pleased with that.
DSCF2890.JPG 

 

DSCF2891.JPG 

 

So then I began to wrap the  'helix wheel' with another material I had acquired quite awhile back. Its half inch foam material utilized in office partitions. Its a nice density that I could wrap around the upright rods, and screw it onto those rods with a minimum of screws. And lucky me the panels were just the correct height for the helix wheel.

These panels are attached to the outside edge of those upright rods , and will act as a barrier to the trains falling off the outside of the helix. I have only wrapped about half of the helix wheel with these insulating panels as I will be putting an inspection door and viewing window in a portion of the 'entrance side'.
DSCF2892.JPG 

 

DSCF2893.JPG 

 

DSCF2894.JPG 

 

 

And of course i don't need any insulating materials on the face of the side matting with the shed as it already has its own insulated wall.

Another nice plus is I have the roof panels cut extra long to provide an 'awning' over that 'entrance side' That will mean much less effort to 'waterproof' the inspection door., & rain coverage for the operator who might have to enter during a rainly day (hope not).
F2895(1).JPG 

 

and then temporary cover skin
DSCF2896.JPG 

 

 

 

Reply 0
anteaum2666

Bottom?

Brian,

This is quite impressive!  I'm enjoying following along in your construction.

You may have mentioned this earlier in the thread, but are you planning to enclose the bottom or leave it open, maybe with a screen or something?

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
jimfitch

So now that the enclosure is

So now that the enclosure is nearly built, how are you going to get a helix in there?  

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
railandsail

Bottom Cover & Track Laying

Yes there will need to be a bottom,...to keep the critters out. I'm planning on enclosing the entire bottom of the 'helix spiral' and its feeder tracks with 1/2  plywood. This will be formed by two large semicircular pieces on either side of the helix circle, then a 'slot' between these 2 pieces will contain an wide opening for a 'trap door' which can fold down for entry by the train operator.      I think I have tried to describe this correctly?     It will be a big sheet of plywood with a long, swing-down, rectangular trap door down the center.

I'm looking to keeping lots of critters out, including those persistent mud-daubers, a few squirrels, and a neighbors cat.  Haven't figured out yet exactly how to deal with those mosquitoes who like dark shady places.

Roadbed & track laying will likely begin with the lower staging access loops first, and may have to wait till mid Sept after I attend a funeral wake for an old friend up in OC Md. Also plan on getting my annual fill of some good Chesapeake Bay crabs, and perhaps visit a few old friends in Wash DC.

And I want to do some of this Helix roadbed and track laying before i put that final siding of the structure, so I will want to time this with the end of hurricane season here in FL (we've had one each the last 2 years right around the end of the summer,...lots of rain and wind).

 

 

Reply 0
railandsail

Finalizing 3-way Turnout Location

Yesterday I spent quite a number of hours trying to figure out a few things about my 3-wat turnout that will feed the staging tracks.
1) How will I mount it (on what roadbed that stretches between the shed's rear wall and the helix) ?
2) Where exactly will I locate it?

3) How do I limit the size of the opening thru the wall such that I limit creature access, as well as limit lost of AC from the main shed?
 

Those are a few of questions I had in mind when I began. At first I started trying to just jury rig several placements of the turnout and its curved tracks, then take approx measurements. This was all becoming to much of a hassle trying to hold multiple objects in place, and make measurements, and view things overall.

 

I decided I needed to make a paper template, then trim that down to size during fitting. I decided paper was a good template,...easy to drawn on and flexible enough to fit thru the narrowing hole thru the back shed wall, and transferable to the wood plywood I will eventually be cutting for the roadbed itself. Turns out it was a good choice as I was able to just use scissors and free-form pencil to determine areas that needed custom fitting to clear around upright post, etc. I'll be transferring that pattern to plywood today and doing the roadbed piece.

First I needed to get an accurate form of the3-way turnout and its 'spreading' 2 curves. But first I still had this nagging thought about which brand turnout to utilize there,...(I had a Peco, a Roco, a Fleischmann, and a Shinoharra). After renewed evaluation I decided the Peco was the best. But just in case I should ever change my mine about brand, OR need to change out to a new one, I will make it so it can be replaced fairly easy.

I then came to the balancing act of exactly where to place the 3-way along the axis of the single track going into staging from the helix. If I placed it very close to the hole in the back wall it would make my requirements for the size of the hole cutout the smallest possible. I had thought this might be ideal to limit the size of the openings between the main shed and the helix structure. But now that I have even better insulation in my helix than I first imagined, this has become less of an issue.

zones(1).jpg 

 

d%20wall.jpg 



Besides as I played around with ideas I came upon another solution. On the helix side of the opening I could make a simple wedge-shaped transparent cover of plexiglass that would just sit over the 3-way, and be quickly removable. It would stick out from the opening in the wall to form a single track opening at its 'entrance end'.

 

Now I can place the 3-way turnout further from the back wall of the shed which will accomplish several things:
a) more easily accessed should I have to perform maintanence or rerail trains

b) more flexibility in hooking up those 3 tracks connected to the turnout
c) permit slightly longer staging tracks down the 2 sides

 

Paper mockup,...next cut the wood subroadbed

DSCF2933.JPG 

 

DSCF2936.JPG 

 

DSCF2934.JPG 
 

Reply 0
railandsail

Wood Roadbed

Yesterday I cut the entrance hole to the shed a bit wider, then cut out my wood roadbed piece (Its hidden under the paper pattern). I also cut out a square hole for the two Peco under-switch machines/controls to be housed in (not shown yet)
 

DSCF2944.JPG 

 

DSCF2943.JPG 

 

DSCF2942.JPG 

 

You can see I have room for the trains to pass by that one upright post by carving out a little relief.
 

 

 

 

 

Reply 0
railandsail

Begin Benchwork for Staging Tracks

Over the past year I have been thinking and experimenting with ideas for my benchwork for my new layout in a shed.

Quote:

I was over at my local metal scrap yard this past Fri and noticed some hollow square steel tubing they use to mount street signs with. Its 2" square verses my flanged 1-1.25" bed rails, and its really strong, and its galvanized. So now I am definitely considering this stuff.

 

Quote:

I was originally considering making vertical brackets at each of the wall stud location to support the plywood shelves. then I ran across these steel square tubing at the local metal scrap yard.

My contractor friend. who was going to weld up the considerable number of vertical brackets I had sketched up, came back with an interesting idea. Why not lay these square tube 'beams' horizontally along the walls and lag them into the wall studs. Then the plywood shelves (decks) could be attached along their wall edge and cantilevered out. And where the shelf/deck is of a substantial depth, the outer edge might also be supported primarily by another long piece of this horizontal square tubing with only an ocassional vertical support.

I am now planing on utilizing this 'horizontal framing' idea on my staging track level and my lower primary deck. I may even utilize the idea for my upper deck, particularly as they will be more shallow than the primary deck. I will definitely utilize the larger 2" square tubing to support the lower primary deck. For the staging level (relatively shallow), and the upper deck I may utilize my 'bed frame angle iron'. I'll document this more thoroughly as I get to building it.

Quick update,....the first piece of horizontal steel tube framing along the back wall of the shed. The large size square tubing is the type that will be utilized to support the edge of the plywood deck next to the walls.. This will be selectively placed around the perimeter of the shed. There will also be central pieces at the inner edges of the shelf somewhat like shown on this preliminary dwg.
 

DSCF2953.JPG 

 

DSCF2958.JPG 

 

DSCF2957.JPG 

 

DSCF2959.JPG 


DSCF2961.JPG 

 

Reply 0
railandsail

Outside Cover

Decided to add the last piece of siding (outside cover) to the helix structure in order to keep things dry inside temporarily while I make a trip north,...and to get that metal piece off its temp resting place against the back fence.

The final version won't look like this as there will be a door for getting access to a few of the tracks entering the main shed, and likely there may be a plexi window of some sort.

(turns out this 'structure' provides some storage for the electric lawn mower and the pressure washer underneath)

%20ps800.jpg 

 

%20ps800.jpg 

 

 

Reply 0
anteaum2666

John Armstrong would be proud

That sure is coming together nicely.  Enjoying the build.

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
railandsail

Thanks

@Michael A.
Thanks for the compliment/encouragement,

Its been a lot more work than I first envisioned. In fact it has distracted me from more thought on the rest of the layout plan. I need to get back to that.

 

 

 

 

Reply 0
railandsail

Easements in Staging and/or Freight Yards

Correct me if I'm wrong, but there is no real need for easements in a staging area such as mine,...nor a freight yard in general,... where trains are moving at low speeds, and/or there may be a need for compactness??

Quote:

For the moment I'll just post this drawing of the 3 zones of staging. There will be 5 tracks to either side of the room/shed. These will be mounted on a 12"-14" board of 3/4 plywood cantilevered off of a very substantial metal framework attached to the 2x4 studs of the shed.

Then there will be 5-6 tracks down the center under the peninsula.  These will be off to one side of, and cantilevered to 'metal frame spine' that will support both the peninsula main deck and this staging deck.

%20zones.jpg 

Reply 0
HVT Dave

Easement Always,

Brian,

There should always be an easement.  But on the curves you have drawn it is only about 3/8" offset between a true tangent line and the straight track after the easement (if that makes sense).  When you lay the track based on the above drawing, leave the straight track as drawn and move the center point of the circular track inward 3/8" of an inch.  If you use flex track it will pretty much make its own easement.

You will not loose any appreciable space on your layout and the trains will run much smoother, both forward and backward, with significantly less chance of derailment.

Dave

Member of the Four Amigos

 

Reply 0
railandsail

BIG Staging Justification

Quote:

Staging

There is a great misconception that staging is for just “prototypical” operation.  Nothing could be further from the truth.  Staging is just as important for just running trains.  If you want to run trains having several queued up to run is a good thing.  Otherwise you have run a train, stop, take the cars off the layout, put a new train on the tracks, stop, take the train off the tracks, put a new train on the tracks, etc.  Having staging allows multiple trains to be “pre-loaded” run in succession without any handling of the equipment. 

Thats why I suggest staging for people who just want to run “trains”.  If you want to run “train” don’t add staging.  If you want to run “trains”, add staging. 

Dave Husman

Reply 0
jimfitch

BIG Staging

Kind of goes with out saying  It's almost like saying my justification for model trains is that model railroading is fun!  No justification needed.

Quote:

Correct me if I'm wrong, but there is no real need for easements in a staging area such as mine,...nor a freight yard in general,... where trains are moving at low speeds, and/or there may be a need for compactness??

Don't mind if I do.  I don't think John Armstrong would agree.  Easements aren't just for speed, but for smoother overall operation, lower chance of derailments etc. due to the lower coefficient of lurch, better appearance of trains entering curves etc.  If you don't have John Armstrongs Track Planning book, get it. 

If you are going to this much trouble to research and prove every step along the way for this shed and layout, it is a very small thing to engineer in easements; they aren't hard to add and take up very little space.  Once I read and learned simple techniques for easements, I have engineered them into all 3 of my past layouts.

Quote:

Its been a lot more work than I first envisioned. 

If you'll allow my constructive criticism, I know it isn't true based on the steady progress but the "lot more work" may be  partly due to, what appears to me, to be over analyzing and over proving concept at some/many steps along the way, at least in some cases.  Yes, as the old saying goes, "a stitch in time saves nine" means you reduce the chance of problems later, but when I read picture after picture after picture after picture after picture of testing long cars on curves, it seems a bit overkill.  Of course it is you you have to convince so maybe you are much more skeptical than me.  But it does add more time and work.

You certainly are cramming about as much layout as possible in that shed in creative ways.  That said, maybe I'm just as guilty if you examine my last layout in the 10x18' basement room and my 11 track staging yard, with 14-22 foot long train storage capacity, I can be accused of trying to cram a ton of layout into a small space, but your layout beats mine!     Now I would have had to run track out the basement window to under the deck to get an outside helix - which never entered my mind, hence the "nolix".  You might have been able to avoid a helix by running a ramp around the outside from bottom to top but too late to think about that!

It certainly is interesting to follow the progress.  Looking forward to more installments.

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
eastwind

I still don't understand what

I still don't understand what you're planning here.  How deep is the shelf actually going to be? Even if you can avoid breaking the shelf off the back support by leaning on it, I suspect it will still be too springy and bend down over time.

You can call me EW. Here's my blog index

Reply 0
railandsail

Which Shelfs

Which shelves are you speaking of, or are you addressing all of them?

In general imagine that 2" boxed piece of galvanized steel, lag-bolted to the 2x4 studs of the wall,...Very Strong. (BTW that steel box was utilized for street signs that are both lengthy and suffer lots of bending wind loads, etc)

The 3/4 ply is then bolted to the upper surface of that steel beam. I have no doubts that this cantilevered arrangement can be at least 18" deep with no other support. (actually I believe it will support 24" with no other support. In those locations where I might climb up on the shelf i can put in another horizontal beam, or I might utilize 'temporary' vertical post(s)

I was debating on how i might attach the plywood to the steel beam. At first i thought I might use screws of some sort from the bottom. But now I think i will utilize machine bolts from the top down thru the steel box. The heads of these bolts will exist on the upper surface of the plywood deck. But the heads of these bolts are relatively small, and they will be located only 1" (center of beam) from the back wall. These will be easy to hide via scenery.
 

Another thought has enter my mind. Having each deck section attached to the steel frame in such a manner, may even provide the possibility of removing those 'sections' of the layout deck in a big chunk to be worked on in an unobstructed location outside of the shed (would preclude climbing on the bottom deck to reach the top deck,...or could make access to the bottom side of the lower main deck (or staging) a bit easier)

 

 

 

 

Reply 0
eastwind

Skeptical

"The 3/4 ply is then bolted to the upper surface of that steel beam. I have no doubts that this cantilevered arrangement can be at least 18" deep with no other support. (actually I believe it will support 24" with no other support. In those locations where I might climb up on the shelf i can put in another horizontal beam, or I might utilize 'temporary' vertical post(s)"

Well color me skeptical. Yes the signpost beam is very strong, but there are several points of possible failure: The lag bolts holding the signpost to the studs are not the one I expect to fail first. The place I expect failure is where the plywood attaches to the signpost. 

The signpost can support plenty of weight, downward force on it is not a problem. Pulling it out from the wall is probably not a problem with the lag bolts if you bolt it to every stud or at least every-other stud.

To keep the plywood from breaking around the fasteners and coming off the signpost, you'll have to fasten it at short intervals along the signpost, maybe every 4-6". If you do that, and use large washers, then I think the shelf won't break off. If you don't fasten it using enough fasteners the plywood will break under pressure and leave you with plywood on the floor and a signpost securely bolted to the wall.

So I think you can probably build it strong enough so it won't break. But I think 3/4" plywood will warp down over time if you have a 16" or 22" extension of unsupported plywood hanging out beyond the edge of its support. And I suspect a 16" or 22" piece of plywood supported on only one edge will be entirely too springy. 

I think you'd better test a section out full depth before going any further. You can at least test whether you've built a shelf or a diving board. 

Where is this "second beam" to be? If you just run it along the front hanging from the bottom of the plywood and otherwise unsupported that's essentially just adding weight to to the edge, which will make the shelf warp down in front sooner rather than later. 

If you run another signpost along the front edge of the layout and support that with legs, then you've built a two-legged table bolted to the wall rather than a shelf, but you'll have something strong enough to support a very overweight person climbing on the layout. But I think that's overkill, and you'd be better off using 2x2 dimensional lumber in place of the signposts if you're going to add legs.

 

You can call me EW. Here's my blog index

Reply 0
railandsail

Eastwind questions answered

Quote:

Eastwind

Well color me skeptical. Yes the signpost beam is very strong, but there are several points of possible failure: The lag bolts holding the signpost to the studs are not the one I expect to fail first. The place I expect failure is where the plywood attaches to the signpost. 

The signpost can support plenty of weight, downward force on it is not a problem. Pulling it out from the wall is probably not a problem with the lag bolts if you bolt it to every stud or at least every-other stud.

It will be lag screwed into every stud location, which in this shed are on 24" centers. The studs in housing construction are normally on 16" centers.

 

Quote:

Eastwind
To keep the plywood from breaking around the fasteners and coming off the signpost, you'll have to fasten it at short intervals along the signpost, maybe every 4-6". If you do that, and use large washers, then I think the shelf won't break off. If you don't fasten it using enough fasteners the plywood will break under pressure and leave you with plywood on the floor and a signpost securely bolted to the wall.

As you can see I have MULTIPLE holes to  utilize there, so I can easily add more as necessary.

 

 

Quote:

So I think you can probably build it strong enough so it won't break. But I think 3/4" plywood will warp down over time if you have a 16" or 22" extension of unsupported plywood hanging out beyond the edge of its support. And I suspect a 16" or 22" piece of plywood supported on only one edge will be entirely too springy.

Where is this "second beam" to be? If you just run it along the front hanging from the bottom of the plywood and otherwise unsupported that's essentially just adding weight to to the edge, which will make the shelf warp down in front sooner rather than later. 

If you run another signpost along the front edge of the layout and support that with legs, then you've built a two-legged table bolted to the wall rather than a shelf, but you'll have something strong enough to support a very overweight person climbing on the layout. But I think that's overkill, and you'd be better off using 2x2 dimensional lumber in place of the signposts if you're going to add legs.

 

Here are the possible locations of those 'front edge beams', and the upright posts as I see it now. BTW I don't have a problem with adding additioal suppot along the 'inner edges' as I can mount my LED lighting out there and run my DCC wiring along there, all behind a very 'thin' fascia piece.
posts(1).jpg 

 

Reply 0
Reply