Ivan I

It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
Neil Erickson NeilEr

Doing it right

I might be 10,000 of those reads as I check back often.  You are moving right along and thinking ahead. Since my engines are battery powered the electronics don't get considered until it becomes a major issue with access and destruction of property to install (switch motors, detection, lighting,...).  Of course I often wonder if I would be happy just building scenery - I don't need no stinking rails

Following along. Thanks for the frequent updates!

Neil E

Neil Erickson, Hawai’i 

My Blogs

Reply 1
Ivan I

RE: Doing it right

Thanks for the kind words Neil! I'm following along your blog as well. I have 5-6 build threads that I check on daily/weekly for updates and live vicariously through them when progress is slow on my build. Dead rail seems really neat - it's a shame the technology seems to be a few years away from being implemented effectively in N scale, otherwise I totally would be on board. 

To be honest, I'm fairly certain some of us would be just as well building animated modules without any trains in them. The art of modeling transcends the subject. (okay, clarification: model making. Just because I can make nice N scale trees doesn't make me a viable candidate to model for CK underwear) 

Glad to have you onboard. 

Reply 1
Ivan I

Slow progress

Summer is coming to a close and I've got a month before I'm back for my last year of college. I'm sure I'll still be catching moments to work on some small bits of the layout here and there but my posts won't be as frequent. It's also about the time when I join the family on our yearly vacation so as much as I'd rather stay home and devote the time to the layout, it will be nice to get out and spend time with them instead. 

But hey, we've still got a month and lots of progress to be made, so on with it!

Turnouts! Whoo! real model railroad stuff! (I say this jokingly as I've never really thought of myself as a model railroader in the traditional, oversimplified stereotypical sense - I just like building things and tinkering) When I first found out that you could hand lay your own turnouts, I was really excited to try. I had all of the basic skills, it all just came down to execution and patience. I decided to forgo the aluminum fast tracks jigs and their tools as I didn't have money for them. I could substitute time for that. I built my turnouts on top of the paper fast tracks templates on a glass pane to ensure they weren't warped. I found the experience to be quite enjoyable and the results were definitely worth the time spent. My first few handlaid turnouts, size 8, 6 and 4.5:

0_204051.jpg 

Why the sudden jump to turnouts? Well, I'm looking to finish up the hidden tracks running behind the fascia first, and I had laid the straightaways for the three modules. All that was left was to install the turnout in the leftmost module that would branch off towards the reversing loop. I decided to use a #6 turnout there instead of a #8 as originally planned. The #6 seemed to perform just as well as the #8 and the tighter radius didn't really look out of place running long double stacks. It's called a "hidden track" for a reason. I cut out a section of the straight track I had already glued in to make space for the turnout.

1_182108.jpg 

I also experimented with the "spray bomb" technique for painting track on the piece I cut out. I grabbed some flat brown rustoleum enamel from Walmart and it did a really nice job minimizing the incorrect proportions of the code 80 rail. I think I'll use this method for the rest of the layout. Good to know that it works just as well as everyone says it does.

1_210639.jpg 

Since I was building my turnouts in code 55 rail, I needed to cut a styrene spacer to lift the turnout section so it was flush with the code 80 flex track. I glued together a few pieces of styrene together to achieve the correct thickness and cut it to the shape of the turnout. The spacer was glued to the run-around benchwork with a shot of super glue.

1_210727.jpg 

Now it was time to figure out how to mount the servo to throw the turnout. There are many reasons why I chose servos - the main ones being their low cost and my familiarity with their operation coming from RC models and robotics. This was the only place on the layout where the servo wasn't just stuck to the underside of the top plywood sheet, so I took time in designing the integrated mounting cutout.

1_214257.jpg 

I drilled an elongated 1/4" through hole for the piano wire actuation rod. I drilled a small hole in the aluminum plate to act as a the fulcrum (pivot). This was installed in the horizontal slot below where the servo was mounted with gorilla glue. Then I drilled some holes for the frog power lead and lined up the servo.

1_231124.jpg 

I carefully glued the turnout in place and installed the actuating servo. I used a cheap servo rester from my rc airplane day to make sure the throw arm was centered. Then I soldered the turnout in place.

2_005914.jpg 2_005945.jpg 1_232945.jpg 

With the first turnout installed, I just HAD to test it and run an engine over it. Again. and Again. and Again. I hooked it up to DC and ran a spare chassis I had lying around. It's not DCC, but it's the first engine to run on the layout! The turnout runs flawlessly in both directions at any speed.

I know it may seem pretty silly to the guys who have miles and miles of track laid and operating, but it was an important milestone for me and I'm still excited about the next chance I get to work on the layout.

Reply 1
pierre52

Closed Only

Ivan I am truly impressed by your turnouts (feel like making a few extras?).  Good to see servos being used just glad that you didn't try throwing it during your video.

 

Peter

The Redwood Sub

Reply 0
Ivan I

Taking a day for organization

Peter,

Thanks for the compliments - Handlaying track seemed like such a daunting task a year ago when I first started putting together my ideas for this layout. Definitely glad I went that route, as the results are quite satisfying and the price per turnout is quite attractive. As for throwing the turnout... well, I did throw it off camera... the foam padding on the floor saved that locomotive, but I did learn my lesson.

I had a rare workday yesterday (I don't usually have time to work on the layout during the week) but I didn't touch the layout. Instead, I worked a bit on shop organization. At the beginning of last summer, I built a second workbench, as the one my dad built when we first moved into the house 15 years ago was a bit small for my liking. Here was mine a day after completion:

6_024243.jpg 

Fast forward a year and a half and it has a whole lot of crap pilled on it... sigh. I added some shelving to the top to store some of my bins and organizers:

-WA0003.jpeg 

These were immediately put into service quickly filled up. I also added a hanger rack for tape, which was on my to-do list for the better part of 6 years. 

-WA0007.jpeg 

The tabletop is still a bit of a mess, but I'll get to cleaning that the next time I'm in the workshop. I'm happy with the shelves - I think the bins stay organized a lot better there then when they were just hanging out on random shelves and tabletops. Now, back to playing with trains!

Reply 1
Ivan I

Fun things show up in mail boxes

So I came home to a pile of packages on my doorstep. Looks like everything came in on the same day for once (every project I have usually gets delayed because one package shows up a few days late and it's the one with critical components). Digikey, OSHPark and Amazon brought me lots of electronics goodies to play with. The Amazon package was fairly straightforward: two 8 relay boards for controlling frog polarity and ten 9g servos for turnout control. The other two packages had the parts for Geoff Bunza's 17 function decoder:

2_165300.jpg 

Assembly was very quick and easy - I made three complete decoders in about an hour of very relaxed soldering. The quality of the OSHPark boards was very good and I only had to wait 10-15 days from order to delivery. I've just ordered my servo and relay wiring breakout boards from them so we'll see when those come in.

7_205851.jpg 

I plan to use each decoder as a 8 function decoder - I've modified the code and done preliminary tests, I'll post it when I have the system assembled and running for a bit. Essentially, I've limited the code to running 8 servos on the first 8 pins. I then have the next 8 pins getting set to high or low depending on the position of each servo, controlling 8 relays for frog power. Geoff's code was easy to read and modify, so a big thank you is in order. 

tControl.png 

I'm off to the beach from Saturday to Wednesday with the family so this will probably be the last post for about a week. Hopefully my breakout boards will be shipped and on their way by then so I can assemble and test my system. Once that is up, I plan to go ahead with track laying.

Reply 0
Neil Erickson NeilEr

Always impressed

I would fret over the soldering for 10-15 days then dive in and probably get some of the components reversed and have to wait for the parts again. Nicely done. I look forward to seeing the whole assembly together. Please post your code changes. 

Hope the beach is awesome - wear sunscreen! 

Neil Erickson, Hawai’i 

My Blogs

Reply 1
Ivan I

...And we're back!

Thanks Neil! The beach was very nice and relaxing - we ended up going every day and I spent a lot of time laying around on a towel reading. 

Coming back was a bit rough but I managed to squeeze in some time to get some work done on the layout. Before leaving for my trip, I bought out the entire supply of 3/16" foamboard from my local dollar store (a paltry 8 sheets). 

1_221326.jpg 

This had to be cut to size so I ran it on the table saw. That gave me nice and accurate cuts, with a little bit of tearout on the underside of the paper. Not a deal breaker, as that's the side I'm gluing to the modules.

7_122809.jpg 

Before gluing it down, I remembered that I still needed to cut away a piece of the backdrop to allow the reversing loop to connect with the hidden tracks (we're talking about Module A). Cutting the hardboard backdrop should have been trivial, but I didn't have the right cutoff discs for my dremel and tried to do it with an abrasive disc for metal... some burnt wood and a shattered disc later, I stopped being stupid and went to harbor freight and grabbed a mini saw blade. The rest of the cut went really quickly.

7_120616.jpg 

Always use the right tool for the job. Even if you're lazy and impatient like me. With the hole in the backdrop cut, I could now install the section of straight hidden track which now included the turnout along with its respective mechanism.

7_133258.jpg 

It may not look like the track will clear the opening in that photo, but I did go back and check and a slight curve in the diverging track clears the cutout with some room to spare. Now it was time to glue the foamboard to the top plywood surfaces of the module. I used Super77 spray adhesive on both surfaces. The adhesive strength was more than adequate. I misaligned the first piece and had to pry it off with great vigor and cursing. I was more careful with the rest of the foam pieces.

7_143320.jpg 

Not too bad for the first module (and a half, if you count the rounded end module). Next up: electronics! (with actual trackwork coming soon after) It's an exciting time to be a model railroad hobbyist.

Reply 0
Ben de Vink

WOW.

Hi Ivan,

Liked your lay out so much that for the first time in six years since becoming a member I decided  to log on to leave a reply. Like it because it reflects a lot of what I am building myself. But my 'problem'  is  that I can't make a choice between european and american style model railways. So I have decided to mix. Not to worry; you won't see a dutch locomotive next to an american but maybe I'll switch between the two. Right now I am reconstructing a big part of the project so I won't post recent pictures but an older one....

Wish you all the luck and enjoying your efforts and progress,

Ben0(Large).JPG   

A Hello from Holland (or the Netherlands) in Europe!!!

Building a H0 industrial and deepsea port motivated Model Railroad.

Focusing om Containers, Chemical Industry and a Bulk grain terminal.

Area of interest: The ports of Rotterdam, Antwerp and Long Beach/Los Angeles.

 

Reply 1
Metrolink

Wow, yourself!

That intermodal dock looks amazing, Ben! The hazard-bumpers really make the scene. And, that ship . . . that's one of the most impressive pieces I've ever seen on any layout!

Back to Ivan's thread: This is probably my favorite layout theme of all, especially since I live in L.A. Modeling the Pacific Harbor Line is one of the most interesting projects I've seen, especially since the prototype is also so fascinating. Excellent work you're doing!

annerF-6.jpg 

Reply 1
Ivan I

Ben de Vink

Wow. That is some fantastic modeling, I hope to one day have something similar on the bottom level of my layout. Thank you for sharing, seeing your post rekindled my desire to work on my layout. My ship will be in N scale, so not quite as huge. I also have a "problem" similar to yours. Some days I really love the PHL layout idea and can't wait to work on things. Other days I think it's very limiting building a model of a real railroad and wish I had stuck with making a layout for my futuristic engines in a post-apocalyptic future. For now, the lack of space, time and money keeps things simple - I build for what I have. Maybe in a few years...

I'm glad you posted that - thank you very much! Have you thought about posting more photos in a personal layout blog? I'm sure there would be plenty of interest in your high standard of modeling.

 

@Metrolink: It's awesome having someone local following along. I'll be able to know if I'm capturing the essence of the area with my scenery - I'll just ask you! If you have any photos you think may be of interest to me, feel free to post them or send them to me, I'll take any material that makes it easier to understand the area I'm modelling.

Reply 1
Ivan I

So it's been a while

A month and a half has passed since my last post which I ended with the promise of electronics and track work. The reason behind my hiatus was a mix of a few things: School started up again, I got more responsibilities at work, and I built a deck for my parents' house. The deck turned out really nice, but it took up most of my free time so I was unable to play with trains. In the meantime, I scoured ebay and set up search filter after search filter to look for some freight cars. I started out with twelve 48' well cars and a three unit Kato 53' well car set. I already had accumulated 4 locomotives: two sw1200s, an AC4400CW and a SD40T-2. The switchers are going to be repainted blue, the AC4400 will remain in UP livery, and the tunnel motor will be patched for PHL. 

My search for cars was pretty strict - I needed modern boxcars, plastics hoppers and corn syrup tank cars. All cars had to have knuckle couplers. Boxcars could not exceed $12 w/ shipping charges, hoppers and tank cars couldn't exceed $18. Company names and markings had to make some sort of sense for the west coast area. This set of guidelines kept me from buying a bunch of cars I didn't need, and really couldn't afford. All in all, I now have a decent fleet, probably enough to keep me occupied for the first few operating sessions. Paying for school has stopped my car acquisition for the time being, which is probably a good thing so I don't get carried away buying trains for a layout that doesn't really exist yet.

DSC04736.jpg 

This past Wednesday I finished the deck behind my parents house so I had some time to clean up the workshop. Having been away from the layout for a long time, I didn't feel like touching the electronics so I decided to start a related side project. For each place I had tracks crossing between modules, I would need pcb ties to keep the rails aligned. I could always buy some, but that's not really my style - besides, I have some pretty cool tools at my disposal. 

5_193411.jpg 

A year ago, I built a small desktop diode laser cutter, with the goal of expanding it into a versatile cnc platform (for those of you interested, it's a 4w blue laser, nice for cutting delicate veneers and paper). It had served me so well as a laser that I never got around to making any other modular attachments - until yesterday. I made a simple holder for my dremel flex-atachment and mounted it on the machine. 

5_202505.jpg 

Voila! A cnc pcb router just the right size for cutting n scale pcb ties. (For the arduino aficionados out there, the machine runs on the arduino RAMPS shield and uses a modified version of the open source Marlin firmware)

6_165613.jpg 

Notice the pvc decking used as a spacer/milling fixture. Did I mention the deck is finished? The pvc scraps are nice and soft. Still, in true amatuer machinist fashion the first time I tried to run the tie cutting gcode, I messed up my feed and depth of cut and snapped the 1/16" carbide mill within the first 2 seconds of the operation. I'm still dialing in the settings and learning how the machine cuts, but I'm really happy with the results (yeah, I know I need to gap the two sides):

6_184711.jpg 

The fiberglass dust is manageable, though I think I'll hook up my woodshop dust collection system the next time I cut. As a result of my little cnc project, I have an infinite number of ways I can cut pcb ties and other small details. Perhaps the frames for an STS crane or the ribs of a container ship are next? 

Okay, I think I'll stop messing around and revisit the layout electronics again. The itch to see some trains running is starting to take its toll.

Reply 1
Kent Smith GN Cascade

Ivan, I think you could have a great article

in there somewhere for MRH in building your home made laser cutter/cnc machine kit. A lot of people would find that fascinating, I know I would. Building your version of the PHL will be closely followed here, to be sure.

Kent Smith - Great Northern Railway Cascade Division 1955 HO
Reply 1
Ivan I

Not enough quality documentation for an article

Kent,

Thank you for the comment - while I think it would certainly be an interesting article, I don't think I have enough quality documentation of the build. It was a 4 year project, where I really didn't have a well defined plan or requirements for the first few years. I was in college and I really wanted a 3d printer, laser cutter, router... and I had no money. Linear motion systems are expensive. So are large stepper motors and drivers. CNC controllers weren't even within a power of ten of my budget. Therefor, I just spent my free time scouring ebay for surplus equipment. I stumbled upon these lead screws and stepper motors for the price of a few nights out and pulled the trigger.

501156_o.jpg 

The next few years I collected bits of scrap aluminum from the university surplus store for a frame. I also bought a few inexpensive cnc controllers - one of them being the Arduino Ramps board (I learned how to set it up at the university 3d printing club). I also picked up a third stepper motor on ebay. Just over a year ago, I found myself back at my parents house for the summer and with a bit of time to spare. I dug out the parts I had stockpiled and came up with a simple construction for the machine. My big issue was that I didn't have access to any milling machines at home, so I had to rely on the existing square dimensions of the materials I had. I didn't know how to weld and wanted the machine to be serviceable so I built everything with bolts and tapped most of the threads into the 1/4" thick aluminum angle brackets. I did have a drill press, angle grinder and a chop saw, so with a bit of practice I was able to get decent tolerances for my parts.

9_210803.jpg 

I bit the bullet and ordered linear bearings from China for the Y-axis - I needed two of them for the stability of the X axis gantry, so it was going to be difficult to source two identical rails from surplus. Then I mounted them to 1x3" 1/8" wall extruded aluminum tubes that would serve as the base for the cnc.

9_211901.jpg 

The X axis was built using a surplus rexroth linear bearing. Using two would have been a bit absurd, as even one could have sufficed as both the structural gantry member and the bearing surface. The lead screws were held in place with deep V groove bearings in bearing blocks. I expect those to fail first on this machine, as they were quite cheap and aren't really designed for sideways loading. I didn't have any proper nema 23 mounts for my motors so I just cut some temporary ones out of mdf... a year later and they're still in use and doing just fine. In the photo below, you can clearly see the simple angle bracket construction of the cnc machine frame.

7_012114.jpg 

I covered the frame with some aircraft grade Baltic birch plywood. I would have liked to use a t-slot extruded aluminum bed, but that was, and still remains out of my budget. Regardless, the plywood gets the job done and is easy to replace when the time comes to upgrade. You can see I also added a piece of thick plywood to the front of the machine. This was needed because my gantry actually extended underneath the frame and was tied together by a 1/4" thick piece of flat bar.

7_205152.jpg 

At this point I added the wiring for the stepper motors and limit switches. I opted to go for mechanical endstops because the machine would be operating in a dusty environment (and they fit the budget). I got two per axis, and when they arrived they turned out to be red. "A little too ostentatious?" as Iron Man would say. I guess they look alright with the blue wiring. I attached them to sliding aluminum plates so I could adjust the travel of each axis independently in each direction. 

DSC04743.jpg 

At this point, put the electronics together and ran the unit for some preliminary testing. It quickly became apparent that I would need bigger stepper motors, as my surplus units were missing steps every time I tried to push them to the speeds I wanted. The removable drivers on the Ramps board also needed to be upgraded as they would thermal after 6-7 minutes of hard running. Here's a photo of the electronics I ended up settling on:

DSC04741.jpg 

At the bottom you have a 24v power supply. The two black boxes above it are the stepper motor drivers for the X and Y axis (the z is still a small stepper motor running off the Ramps drivers). In the upper left hand corner you have the Arduino Mega with the Ramps board on top. I replaced the stock fuses with automotive ones and those seem to work well. The little blue board to the right of the RAMPs board is a switching power supply that lowers the 24v to about 9v to power the arduino and the laser driver in my laser attachment. The wiring was a lot neater originally, this is a photo of how it looks now after a year of modifications and tinkering. 

DSC04742.jpg 

Above, you can see the big honking stepper motor on the X axis. The Y has an identical one. Works like a charm and hardly gets warm even after operations that last upwards of two hours. The Z axis still has the old plotter stepper on it, but it seems to do the job well. Besides, I'm not putting very high loads on the machine, most of the heat comes from speed moves. The Z stage has a simple 4 bolt mounting pattern for any modules I want to put on it. Currently I have a laser diode and the engraving one I just built. There's a possibility I'll add a real spindle, or maybe even a 3d print head.

DSC04744.jpg 

All in all, I'm really glad I made the machine. It cost me about 5-600$ over the last 5 years, but I learned so much about all of the systems involved and am still learning every day. The machine has made back the investment in under a year, and that was just me messing around and selling some of my side projects. I'm still looking to get a 40w ebay laser cutter so I can turn my cnc into a full blown router, but for now it will suffice. Yesterday it made me 5 strips of ties in 2 hours of unsupervised running. I hit go and took a nap (the speeds and feeds were pretty conservative mind you).

DSC04747.jpg 

So there it is. Not much of an article, but I hope you guys found it interesting. I figured I'd put this up here in case anyone had any questions about the tools I use. I know it's not strictly on topic, but it's a fun tool that helps me enjoy the hobby.

DSC04740.jpg 

Reply 2
Kent Smith GN Cascade

Ivan, that was awesome.

Thanks for laying out how you went about putting your cnc machine together. I am sure many people besides myself will find your project fascinating. I find it very inspirational.

Kent Smith - Great Northern Railway Cascade Division 1955 HO
Reply 1
Neil Erickson NeilEr

Agreed

 Very cool. Thanks. 

Neil Erickson, Hawai’i 

My Blogs

Reply 1
pierre52

Yes please Ivan

you can build me one any time you are ready.  

A CNC router has been on my to do list for a very long time but continues to be one of those things that just never happens. A laser cutter sits very close in 2nd place. 

Peter

The Redwood Sub

Reply 1
Graeme Nitz OKGraeme

Ivan...

...or should I say MacGyver!

I love your posts. You are clever and not afraid to try something.

Graeme Nitz

An Aussie living in Owasso OK

K NO W Trains

K NO W Fun

 

There are 10 types of people in this world,

Those that understand Binary and those that Don't!

Reply 1
Ivan I

Thanks for the comments

Thanks for the comments guys! Peter, if I go into the business of making cnc routers, I wouldn't have time to eat or sleep let alone play with trains. It took me 3 years of sitting on the idea and then a month of actual building for it to come to fruition. The best things in life take time, or so I'm told.

So, remember that time I mentioned something about electronics? Making breakout boards, working on wiring things together? I think I left off with them being made and shipped out to me. Well, they arrived:

8_170135.jpg 

They are simple boards, essentially combining the digital out pins on the GB18 decoders with a ground and positive five volt rail for easy connection to servos. I added another breakout for the relay board control (In the event that I wanted to use a ribbon cable) but I decided to wire them directly to the decoder using hook up wire instead. Here's everything connected together:

8_203848.jpg 

As you can see, the GB decoder connects to the relay board (which controls frog polarity on my turnouts) and also connects to the servo breakout board for the servos controlling my turnouts. I can control 8 turnouts with this setup at an economical price point. I believe I will need four of these assemblies for the top layer of this layout - about an evening's worth of soldering. Here's what everything looks like installed with velcro under the first module:

DSC04738.jpg 

I decided to use stranded wires for the frog polarity control so I could easily switch them around if they were backward. I'll have to do some tests to see how everything works - I've only tested things separately on the bench. I also spent a little bit of time adding a track power bus to the leftmost rounded section, but this was pretty straightforward:

8_212248.jpg 

Reply 2
Rene Gourley renegourley

Great post on the router/laser

Thanks for sharing it!

Rene Gourley
Modelling Pembroke, Ontario in Proto:87

Read my MRH blog
Read my Wordpress blog

Reply 1
Ivan I

Glad you guys found that interesting

I always enjoy putting up my documentation somewhere others can see it because I feel like I'm giving back to the community a bit - I used similar posts (in other, cnc specific forums) as inspiration and guidance when building my machine. Perhaps a bit off topic, but here's what I worked on for a few hours this week:

DSC04753.jpg 

I used the laser to engrave the design on the coasters. The coasters themselves are cut from a piece of firewood I saved from the fireplace. These were for my girlfriend for an anniversary gift - they were well received. While on the topic of lasers and CNCs, I ended up buying a 500w spindle motor and power supply from China (on sale for $85) and it arrived today. Overall decent construction, we'll see how the bearings hold up over time. I should be able to make back the investment tenfold this holiday season.

9_184534.jpg 

With a proper spindle, I'm going to try to make my own turnout jigs (I'll try a few different materials, though I suppose some 6061 aluminum would do the job just fine). I'm also going to try cutting all of the ties for a turnout from a single pcb. They will all be connected underneath the rails and the gaps will be cut on the router. I have a decent source of cheap PCBs so I don't really see much downside to making turnouts this way, and I have a feeling these will be bulletproof. Besides, I really don't like adding the wooden ties so just soldering the rails to the top of the pcb turnout silhouette should make for a happy Ivan. We'll see how well this idea works - wondering if anyone has tried it before.

Reply 1
Ivan I

But enough with the router, time for some trackwork!

Whew, finally! Bet you were starting to think I was just pulling your leg, building up the layout and then poof, disappear once the real work started. Nope. No such luck. I decided to put down the curved section of track on the left wing module first. Not sure why, but I guess I'd like to create the main loop first and then work inwards. Maybe it was just the simplest piece of track to lay. Regardless, I bent the track to a 12 inch radius (the tightest radius on the layout according to my plan) and fixed the ends of the rail by soldering them to my precut pcb ties.

9_200304.jpg 

This worked well enough that I added them to the place where I joined two sections of flex track together. Yeah, I know, cut the gaps. I'll just add another line of GCode and have the router do it for me next time. Lessons learned.

9_200330.jpg 

Before gluiing the tracks down, I remembered to solder two sets of feeders to the bottoms of the rails. That might be overkill for 1.5 piece long section of flex track, but it's easier to do it now rather then find out I have bad conductivity once the track is glued in place. With everything marked out and lined up, I spread a layer of LiquidNails adhesive along the roadbed and clamped things down overnight. Shush, it's not like I use the weights to work out anyway... I'm a scrawny 20-something year old and I've got better things to do with my time.

3_224209.jpg 

The next morning, I flipped the module over and soldered the feeders to my track power bus. I forget who it was who suggested using wire strippers to cut out sections of insulation in the bus, but man do I owe you one. It was a lot faster than trying to carefully score it with an exacto knife (and my wire strippers are pretty beat up, I should ask for new ones for Christmas or something). 

7_224050.jpg 

The next step was painting the rails. I ended up spray bombing with flat brown rustoleum enamel. The stuff sticks well to foam, plastic and metal. I did a test to make sure it didn't eat away my foam too much (it dissolved it a little bit, but not enough to be noticeable). The paint does a really nice job masking the oversized code 80 rail. I know I should probably get code 55, but I genuinely cannot afford it so I'm going to do the best I can with what I have. I'm going to prioritize running trains rather than sitting behind a computer wishing I had money for nicer track. 

7_233545.jpg 

I placed my longest car (48' single well) on the curve to see how much the overhang bothered me and decided I could live with it. It's not perfect, but I'm also treating these wing modules as disposable endcaps for the layout - their appearance doesn't have to be exact so long as they serve their purpose. I didn't even bother to add a valance or lighting above them, in an effort to have them disappear into the shadows a bit. We'll see how well that works. 

-WA0006.jpeg 

Moving down the main line past the joint between the wing and module A, I had a left hand number six turnout that needed to be made. With my current method of printing out a template, cutting ties by hand, soldering, ect it takes me about 3 hours to make a turnout. I'm not really in a rush, and the ones I make are absolutely perfect when it comes to operation so it's worth the time. 

-WA0003.jpeg 8_214237.jpg 

As mentioned in the previous post, I've got a few ideas I'm going to put through the cnc router to see if I can expedite the process, or at least remove some steps that I don't particularly enjoy doing. More to follow, probably along the lines of turnout construction and installation. I've got a yard ladder that isn't gonna build itself.

Reply 1
Ivan I

Took a day to pursue an idea

Spent today setting up and tuning the cnc router with the new spindle. I figured it would be a useful exercise trying to figure out how to make a single piece turnout (well, just the ties) so I wouldn't have to mess with aligning and gluing wooden ties. 

1_123216.jpg 

It took quite a few adjustments (and a quick rewire on the spindle enabling control) to figure things out, but 6 hours later, I have a decent idea of how to run the machine. As for the turnouts, the last one (on the bottom) is quite usable, aside from the slight shift in the location of the gaps in the copper layer. At first I tried to cut out a more complex tie pattern to help me align the rails, but I realized that it wasn't worth the time added to the machining cycle. The last cutout took 48 minutes from start to finish. One or two more successful cuts and I'll be able to trust the machine and just let it do its thing, cutting three turnouts per pcb sheet unattended.

1_225918.jpg 

I'm looking to spend some time tomorrow designing and cutting servo mounts. I have some leftover white pvc trimming that should do the trick and cut nicely on the cnc. Since I have to make 20+ mounts, it actually makes sense to run them on the cnc (okay, maybe I'm just trying to justify playing with my new toy). 

Reply 1
pierre52

Cutter question

Ivan can you tell us what sort of cutter you are using and what diameter. I am presuming a HSS end mill. Knowing how tough fibreglass can be on cutting equipment, what are you doing to keep the cutter sharp? 

Peter

The Redwood Sub

Reply 1
Ivan I

Cutter answer

Peter,

I use these guys, labeled as carbide pcb endmills:

PA020010.jpg 

3.18mm shank, various size cutting diameters. The one I've been using up till this point is approximately 1.34mm in diameter. I got a set of 10 from China for 4$ so if one of them gets dull I just toss it. They cut through the pcb like it's nothing (the copper layer generates a bit of chatter so you need to spiral in a bit more aggressively on the first pass) and don't fling the dust everywhere. They don't like direct plunges and require a relatively high rpm to work well. I've only snapped one so far and it was due to human error. I do have a set of 1/8" 2 flute endmills on the way for wood and plastic work. 

Reply 2
Reply